Todas las líneas aéreas volando desde Brisbane (BNE) a Melbourne Tullamarine (MEL).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos de código compartido:
Lun 17:25 Brisbane (BNE) D 20:45 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6892 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-03-02 through 2026-03-23
Codeshare flight, operated by Virgin Australia.(VA 344)
Lun,Mar 19:55 Brisbane (BNE) D 23:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6892 Non-stop Boeing 737-800 (73H) 2:20 Valid until 2026-01-05
Codeshare flight, operated by Virgin Australia.(VA 354)
Lun 19:55 Brisbane (BNE) D 23:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6892 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-01-12 through 2026-01-19
Codeshare flight, operated by Virgin Australia.(VA 354)
Vie 19:55 Brisbane (BNE) D 23:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6892 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-02-13 through 2026-02-20
Codeshare flight, operated by Virgin Australia.(VA 354)
Jue,Vie 19:55 Brisbane (BNE) D 23:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6892 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-02-26 through 2026-02-27
Codeshare flight, operated by Virgin Australia.(VA 354)
Vie 19:55 Brisbane (BNE) D 23:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6892 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-03-06 through 2026-03-20
Codeshare flight, operated by Virgin Australia.(VA 354)
Jue,Vie 19:55 Brisbane (BNE) D 23:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6892 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-03-26 through 2026-03-27
Codeshare flight, operated by Virgin Australia.(VA 354)
Mar 20:25 Brisbane (BNE) D 23:45 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6892 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Operates only on 2026-02-17
Codeshare flight, operated by Virgin Australia.(VA 354)
Diario 07:55 Brisbane (BNE) D 11:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737-800 (73H) 2:20 Valid until 2026-01-05
Codeshare flight, operated by Virgin Australia.(VA 314)
Lun,Jue-Dom 07:55 Brisbane (BNE) D 11:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-01-08 through 2026-01-19
Codeshare flight, operated by Virgin Australia.(VA 314)
Lun-Sab 07:55 Brisbane (BNE) D 11:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-01-20 through 2026-01-31
Codeshare flight, operated by Virgin Australia.(VA 314)
Dom 07:55 Brisbane (BNE) D 11:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Operates only on 2026-01-25
Codeshare flight, operated by Virgin Australia.(VA 314)
Lun-Vie,Dom 07:55 Brisbane (BNE) D 11:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-02-01 through 2026-03-06
Codeshare flight, operated by Virgin Australia.(VA 314)
Sab 07:55 Brisbane (BNE) D 11:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737-700 (73W) 2:20 Effective 2026-02-07 through 2026-02-28
Codeshare flight, operated by Virgin Australia.(VA 314)
Diario 07:55 Brisbane (BNE) D 11:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-03-07 through 2026-03-28
Codeshare flight, operated by Virgin Australia.(VA 314)
Diario 07:55 Brisbane (BNE) D 11:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-03-29 through 2026-04-04
Codeshare flight, operated by Virgin Australia.(VA 314)
Diario 07:55 Brisbane (BNE) D 10:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-04-05 through 2026-05-16
Codeshare flight, operated by Virgin Australia.(VA 314)
Dom 07:55 Brisbane (BNE) D 10:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737-700 (73W) 2:25 Effective 2026-05-17 through 2026-06-14
Codeshare flight, operated by Virgin Australia.(VA 314)
Lun-Sab 07:55 Brisbane (BNE) D 10:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-05-18 through 2026-06-20
Codeshare flight, operated by Virgin Australia.(VA 314)
Diario 07:55 Brisbane (BNE) D 10:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-06-21 through 2026-08-08
Codeshare flight, operated by Virgin Australia.(VA 314)
Dom 07:55 Brisbane (BNE) D 10:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737-700 (73W) 2:25 Effective 2026-08-09 through 2026-08-30
Codeshare flight, operated by Virgin Australia.(VA 314)
Lun-Sab 07:55 Brisbane (BNE) D 10:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-08-10 through 2026-09-05
Codeshare flight, operated by Virgin Australia.(VA 314)
Diario 07:55 Brisbane (BNE) D 10:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-09-06 through 2026-10-03
Codeshare flight, operated by Virgin Australia.(VA 314)
Lun-Mie,Vie-Dom 07:55 Brisbane (BNE) D 11:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-10-04 through 2026-10-24
Codeshare flight, operated by Virgin Australia.(VA 314)
Jue 07:55 Brisbane (BNE) D 11:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2026-10-08 through 2026-10-22
Codeshare flight, operated by Virgin Australia.(VA 314)
Sab,Dom 07:55 Brisbane (BNE) D 11:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737-800 (73H) 2:20 Effective from 2026-10-25
Codeshare flight, operated by Virgin Australia.(VA 314)
Lun-Vie 07:55 Brisbane (BNE) D 11:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6894 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective from 2026-10-26
Codeshare flight, operated by Virgin Australia.(VA 314)
Lun-Sab 06:55 Brisbane (BNE) D 10:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:20 Valid until 2026-01-16
Codeshare flight, operated by Virgin Australia.(VA 308)
Sab 06:55 Brisbane (BNE) D 10:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Operates only on 2026-01-17
Codeshare flight, operated by Virgin Australia.(VA 308)
Lun-Sab 06:55 Brisbane (BNE) D 10:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-01-19 through 2026-01-24
Codeshare flight, operated by Virgin Australia.(VA 308)
Jue-Sab 06:55 Brisbane (BNE) D 10:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-01-29 through 2026-01-31
Codeshare flight, operated by Virgin Australia.(VA 308)
Lun,Jue-Sab 06:55 Brisbane (BNE) D 10:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-02-16 through 2026-03-02
Codeshare flight, operated by Virgin Australia.(VA 308)
Lun-Sab 06:55 Brisbane (BNE) D 10:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-03-03 through 2026-03-28
Codeshare flight, operated by Virgin Australia.(VA 308)
Lun-Sab 06:55 Brisbane (BNE) D 10:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-03-30 through 2026-04-04
Codeshare flight, operated by Virgin Australia.(VA 308)
Lun-Sab 06:55 Brisbane (BNE) D 09:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-04-06 through 2026-04-13
Codeshare flight, operated by Virgin Australia.(VA 308)
Lun,Vie,Sab 06:55 Brisbane (BNE) D 09:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-04-17 through 2026-05-02
Codeshare flight, operated by Virgin Australia.(VA 308)
Lun,Mar,Vie,Sab 06:55 Brisbane (BNE) D 09:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-05-05 through 2026-05-11
Codeshare flight, operated by Virgin Australia.(VA 308)
Lun,Vie,Sab 06:55 Brisbane (BNE) D 09:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-05-15 through 2026-06-08
Codeshare flight, operated by Virgin Australia.(VA 308)
Lun,Mar,Vie,Sab 06:55 Brisbane (BNE) D 09:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-06-09 through 2026-06-16
Codeshare flight, operated by Virgin Australia.(VA 308)
Lun-Sab 06:55 Brisbane (BNE) D 09:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-06-17 through 2026-08-03
Codeshare flight, operated by Virgin Australia.(VA 308)
Lun,Vie,Sab 06:55 Brisbane (BNE) D 09:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-08-07 through 2026-09-07
Codeshare flight, operated by Virgin Australia.(VA 308)
Lun-Sab 06:55 Brisbane (BNE) D 09:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-09-08 through 2026-10-03
Codeshare flight, operated by Virgin Australia.(VA 308)
Lun-Sab 06:55 Brisbane (BNE) D 10:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-10-05 through 2026-10-24
Codeshare flight, operated by Virgin Australia.(VA 308)
Lun,Jue-Sab 06:55 Brisbane (BNE) D 10:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:20 Effective from 2026-10-26
Codeshare flight, operated by Virgin Australia.(VA 308)
Vie 12:55 Brisbane (BNE) D 16:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-02-06 through 2026-02-13
Codeshare flight, operated by Virgin Australia.(VA 328)
Dom 16:55 Brisbane (BNE) D 20:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-01-04 through 2026-03-22
Codeshare flight, operated by Virgin Australia.(VA 342)
Dom 16:55 Brisbane (BNE) D 20:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:25 Operates only on 2026-03-29
Codeshare flight, operated by Virgin Australia.(VA 342)
Dom 16:55 Brisbane (BNE) D 19:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-04-05 through 2026-09-27
Codeshare flight, operated by Virgin Australia.(VA 342)
Dom 16:55 Brisbane (BNE) D 20:20 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-10-04 through 2026-10-18
Codeshare flight, operated by Virgin Australia.(VA 342)
Dom 16:55 Brisbane (BNE) D 20:15 Melbourne Tullamarine (MEL) 3
Singapore Airlines SQ 6896 Non-stop Boeing 737-700 (73W) 2:20 Effective from 2026-10-25
Codeshare flight, operated by Virgin Australia.(VA 342)
prev   1 2 3 ... 23 24 25 26 27 28 29 ... 37 38 39   next


Todas las líneas aéreas volando desde Brisbane (BNE) a Melbourne Tullamarine (MEL).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos de código compartido:

Effective 2026-03-02 through 2026-03-23
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 344)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Valid until 2026-01-05
Lun
Mar
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 354)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-01-12 through 2026-01-19
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 354)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-02-13 through 2026-02-20
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 354)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-02-26 through 2026-02-27
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 354)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-03-06 through 2026-03-20
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 354)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-03-26 through 2026-03-27
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 354)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Operates only on 2026-02-17
Lun
-
Mar
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 354)
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Valid until 2026-01-05
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-01-08 through 2026-01-19
Lun
Mar
-
Mie
-
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-01-20 through 2026-01-31
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Operates only on 2026-01-25
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective 2026-02-01 through 2026-03-06
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-02-07 through 2026-02-28
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-03-07 through 2026-03-28
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-03-29 through 2026-04-04
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-04-05 through 2026-05-16
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-05-17 through 2026-06-14
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-05-18 through 2026-06-20
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-06-21 through 2026-08-08
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-08-09 through 2026-08-30
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Vuelos directos de código compartido:

Effective 2026-08-10 through 2026-09-05
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-09-06 through 2026-10-03
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-10-04 through 2026-10-24
Lun
Mar
Mie
Jue
-
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-10-08 through 2026-10-22
Lun
-
Mar
-
Mie
-
Jue
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective from 2026-10-25
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective from 2026-10-26
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 314)
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Valid until 2026-01-16
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Operates only on 2026-01-17
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Vuelos directos de código compartido:

Effective 2026-01-19 through 2026-01-24
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-01-29 through 2026-01-31
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-02-16 through 2026-03-02
Lun
Mar
-
Mie
-
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-03-03 through 2026-03-28
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-03-30 through 2026-04-04
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-04-06 through 2026-04-13
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-04-17 through 2026-05-02
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-05-05 through 2026-05-11
Lun
Mar
Mie
-
Jue
-
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-05-15 through 2026-06-08
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-06-09 through 2026-06-16
Lun
Mar
Mie
-
Jue
-
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-06-17 through 2026-08-03
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-08-07 through 2026-09-07
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-09-08 through 2026-10-03
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-10-05 through 2026-10-24
Lun
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective from 2026-10-26
Lun
Mar
-
Mie
-
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 308)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-02-06 through 2026-02-13
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 328)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-01-04 through 2026-03-22
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 342)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Operates only on 2026-03-29
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 342)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-04-05 through 2026-09-27
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 342)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective 2026-10-04 through 2026-10-18
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 342)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Vuelos directos de código compartido:

Effective from 2026-10-25
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 342)
Duration: 2:20, non-stop
Boeing 737-700 (73W)
prev        Page 26 / 39        next
  • Una ruta nacional saliendo desde el aeropuerto Brisbane (BNE) y llegando al aeropuerto Melbourne Tullamarine (MEL).
  • El vuelo tiene una distancia de 854 millas, o 1374 km.
  • La zona horaria tanto del aeropuerto de salida como del de llegada es UTC+10 . La hora actual en ambos aeropuertos es (loading...).
  • Para vuelos directos, el tiempo de vuelo oscila entre 2:20 y 2:30.