Todas las líneas aéreas volando desde Brisbane (BNE) a Melbourne (MEL).

Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos de código compartido:
Vie,Dom 13:55 Brisbane (BNE) D 17:20 Melbourne (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-06 through 2024-10-25
Codeshare flight, operated by Virgin Australia.(VA 332)
Diario 13:55 Brisbane (BNE) D 17:15 Melbourne (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-10-27 through 2025-04-05
Codeshare flight, operated by Virgin Australia.(VA 332)
Diario 13:55 Brisbane (BNE) D 16:20 Melbourne (MEL) 3
Singapore Airlines SQ 6904 Non-stop Boeing 737-800 (73H) 2:25 Effective from 2025-04-06
Codeshare flight, operated by Virgin Australia.(VA 332)
Diario 18:55 Brisbane (BNE) D 21:20 Melbourne (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:25 Valid until 2024-10-05
Codeshare flight, operated by Virgin Australia.(VA 352)
Diario 18:55 Brisbane (BNE) D 22:20 Melbourne (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-06 through 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 352)
Lun-Vie,Dom 18:55 Brisbane (BNE) D 22:15 Melbourne (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-10-27 through 2024-12-09
Codeshare flight, operated by Virgin Australia.(VA 352)
Jue,Vie,Dom 18:55 Brisbane (BNE) D 22:15 Melbourne (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-12-12 through 2024-12-15
Codeshare flight, operated by Virgin Australia.(VA 352)
Lun,Mar,Vie,Dom 18:55 Brisbane (BNE) D 22:15 Melbourne (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-12-20 through 2024-12-29
Codeshare flight, operated by Virgin Australia.(VA 352)
Vie,Dom 18:55 Brisbane (BNE) D 22:15 Melbourne (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-01-03 through 2025-01-24
Codeshare flight, operated by Virgin Australia.(VA 352)
Lun-Vie,Dom 18:55 Brisbane (BNE) D 22:15 Melbourne (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-01-27 through 2025-02-03
Codeshare flight, operated by Virgin Australia.(VA 352)
Lun,Jue,Vie,Dom 18:55 Brisbane (BNE) D 22:15 Melbourne (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-02-06 through 2025-03-03
Codeshare flight, operated by Virgin Australia.(VA 352)
Lun-Vie 18:55 Brisbane (BNE) D 22:15 Melbourne (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-03-04 through 2025-03-14
Codeshare flight, operated by Virgin Australia.(VA 352)
Lun-Vie,Dom 18:55 Brisbane (BNE) D 22:15 Melbourne (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-03-16 through 2025-04-04
Codeshare flight, operated by Virgin Australia.(VA 352)
Sab 18:55 Brisbane (BNE) D 22:15 Melbourne (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:20 Operates only on 2025-04-05
Codeshare flight, operated by Virgin Australia.(VA 352)
Diario 18:55 Brisbane (BNE) D 21:20 Melbourne (MEL) 3
Singapore Airlines SQ 6906 Non-stop Boeing 737-800 (73H) 2:25 Effective from 2025-04-06
Codeshare flight, operated by Virgin Australia.(VA 352)
Vie-Dom 14:55 Brisbane (BNE) D 17:20 Melbourne (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:25 Valid until 2024-09-15
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun,Vie-Dom 14:55 Brisbane (BNE) D 17:20 Melbourne (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-09-16 through 2024-09-22
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun,Vie-Dom 14:55 Brisbane (BNE) D 17:20 Melbourne (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-09-27 through 2024-10-05
Codeshare flight, operated by Virgin Australia.(VA 334)
Diario 14:55 Brisbane (BNE) D 18:20 Melbourne (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-06 through 2024-10-20
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun 14:55 Brisbane (BNE) D 18:20 Melbourne (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-700 (73W) 2:25 Operates only on 2024-10-21
Codeshare flight, operated by Virgin Australia.(VA 334)
Mar-Sab 14:55 Brisbane (BNE) D 18:20 Melbourne (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-22 through 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 334)
Jue,Vie,Dom 14:55 Brisbane (BNE) D 18:15 Melbourne (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-10-27 through 2024-11-03
Codeshare flight, operated by Virgin Australia.(VA 334)
Mie-Vie,Dom 14:55 Brisbane (BNE) D 18:15 Melbourne (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-11-06 through 2024-11-10
Codeshare flight, operated by Virgin Australia.(VA 334)
Jue,Vie,Dom 14:55 Brisbane (BNE) D 18:15 Melbourne (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-11-14 through 2024-12-15
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun-Vie,Dom 14:55 Brisbane (BNE) D 18:15 Melbourne (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-12-16 through 2024-12-24
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun-Vie,Dom 14:55 Brisbane (BNE) D 18:15 Melbourne (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-12-26 through 2025-01-27
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun,Vie 14:55 Brisbane (BNE) D 18:15 Melbourne (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-01-31 through 2025-02-07
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun,Vie,Dom 14:55 Brisbane (BNE) D 18:15 Melbourne (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-02-09 through 2025-03-03
Codeshare flight, operated by Virgin Australia.(VA 334)
Lun,Jue,Vie,Dom 14:55 Brisbane (BNE) D 18:15 Melbourne (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-03-06 through 2025-04-04
Codeshare flight, operated by Virgin Australia.(VA 334)
Vie-Dom 14:55 Brisbane (BNE) D 17:20 Melbourne (MEL) 3
Singapore Airlines SQ 6908 Non-stop Boeing 737-800 (73H) 2:25 Effective from 2025-04-06
Codeshare flight, operated by Virgin Australia.(VA 334)
Diario 08:55 Brisbane (BNE) D 11:20 Melbourne (MEL) 3
Singapore Airlines SQ 6910 Non-stop Boeing 737-800 (73H) 2:25 Valid until 2024-10-05
Codeshare flight, operated by Virgin Australia.(VA 318)
Diario 08:55 Brisbane (BNE) D 12:20 Melbourne (MEL) 3
Singapore Airlines SQ 6910 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-06 through 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 318)
Diario 08:55 Brisbane (BNE) D 12:15 Melbourne (MEL) 3
Singapore Airlines SQ 6910 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-10-27 through 2025-04-05
Codeshare flight, operated by Virgin Australia.(VA 318)
Diario 08:55 Brisbane (BNE) D 11:20 Melbourne (MEL) 3
Singapore Airlines SQ 6910 Non-stop Boeing 737-800 (73H) 2:25 Effective from 2025-04-06
Codeshare flight, operated by Virgin Australia.(VA 318)
Diario 09:55 Brisbane (BNE) D 12:20 Melbourne (MEL) 3
Singapore Airlines SQ 6912 Non-stop Boeing 737-800 (73H) 2:25 Valid until 2024-10-05
Codeshare flight, operated by Virgin Australia.(VA 322)
Diario 09:55 Brisbane (BNE) D 13:20 Melbourne (MEL) 3
Singapore Airlines SQ 6912 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-06 through 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 322)
Diario 09:55 Brisbane (BNE) D 13:15 Melbourne (MEL) 3
Singapore Airlines SQ 6912 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-10-27 through 2025-04-05
Codeshare flight, operated by Virgin Australia.(VA 322)
Diario 09:55 Brisbane (BNE) D 12:20 Melbourne (MEL) 3
Singapore Airlines SQ 6912 Non-stop Boeing 737-800 (73H) 2:25 Effective from 2025-04-06
Codeshare flight, operated by Virgin Australia.(VA 322)
Lun-Vie 05:55 Brisbane (BNE) D 09:20 Melbourne (MEL) 3
Singapore Airlines SQ 6914 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-07 through 2024-10-25
Codeshare flight, operated by Virgin Australia.(VA 304)
Sab 05:55 Brisbane (BNE) D 09:20 Melbourne (MEL) 3
Singapore Airlines SQ 6914 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-10-12 through 2024-10-19
Codeshare flight, operated by Virgin Australia.(VA 304)
Sab 05:55 Brisbane (BNE) D 09:20 Melbourne (MEL) 3
Singapore Airlines SQ 6914 Non-stop Boeing 737-800 (73H) 2:25 Operates only on 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 304)
Vie 11:25 Brisbane (BNE) D 13:50 Melbourne (MEL) 3
Singapore Airlines SQ 6914 Non-stop Boeing 737-800 (73H) 2:25 Operates only on 2024-09-20
Codeshare flight, operated by Virgin Australia.(VA 326)
Mie 11:55 Brisbane (BNE) D 14:20 Melbourne (MEL) 3
Singapore Airlines SQ 6914 Non-stop Boeing 737-800 (73H) 2:25 Operates only on 2024-09-04
Codeshare flight, operated by Virgin Australia.(VA 326)
Dom 11:55 Brisbane (BNE) D 15:20 Melbourne (MEL) 3
Singapore Airlines SQ 6914 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-06 through 2024-10-20
Codeshare flight, operated by Virgin Australia.(VA 326)
Diario 11:55 Brisbane (BNE) D 15:15 Melbourne (MEL) 3
Singapore Airlines SQ 6914 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-10-27 through 2025-04-05
Codeshare flight, operated by Virgin Australia.(VA 326)
Dom 12:25 Brisbane (BNE) D 14:50 Melbourne (MEL) 3
Singapore Airlines SQ 6914 Non-stop Boeing 737-800 (73H) 2:25 Operates only on 2024-09-22
Codeshare flight, operated by Virgin Australia.(VA 326)
Lun 05:05 Brisbane (BNE) D 08:25 Melbourne (MEL) 3
Singapore Airlines SQ 6916 Non-stop Boeing 737-800 (73H) 2:20 Operates only on 2024-10-28
Codeshare flight, operated by Virgin Australia.(VA 302)
Lun 05:05 Brisbane (BNE) D 08:25 Melbourne (MEL) 3
Singapore Airlines SQ 6916 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-11-11 through 2024-12-02
Codeshare flight, operated by Virgin Australia.(VA 302)
Lun 05:05 Brisbane (BNE) D 08:25 Melbourne (MEL) 3
Singapore Airlines SQ 6916 Non-stop Boeing 737-800 (73H) 2:20 Operates only on 2025-03-03
Codeshare flight, operated by Virgin Australia.(VA 302)
Lun,Mar 05:05 Brisbane (BNE) D 08:25 Melbourne (MEL) 3
Singapore Airlines SQ 6916 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-03-11 through 2025-03-17
Codeshare flight, operated by Virgin Australia.(VA 302)
prev   1 2 3 ... 21 22 23 24 25 26 27 ... 31 32 33   next


Todas las líneas aéreas volando desde Brisbane (BNE) a Melbourne (MEL).
Seleccione fecha de vuelo:
HORARIO DE VUELOS
Vuelos directos de código compartido:

Effective 2024-10-06 through 2024-10-25
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-27 through 2025-04-05
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective from 2025-04-06
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 332)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Valid until 2024-10-05
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-06 through 2024-10-26
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-27 through 2024-12-09
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-12-12 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-12-20 through 2024-12-29
Lun
Mar
Mie
-
Jue
-
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-01-03 through 2025-01-24
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-01-27 through 2025-02-03
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-02-06 through 2025-03-03
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-03-04 through 2025-03-14
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-03-16 through 2025-04-04
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Operates only on 2025-04-05
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective from 2025-04-06
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 352)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Valid until 2024-09-15
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-09-16 through 2024-09-22
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-09-27 through 2024-10-05
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-06 through 2024-10-20
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Operates only on 2024-10-21
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Effective 2024-10-22 through 2024-10-26
Lun
-
Mar
Mie
Jue
Vie
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-27 through 2024-11-03
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-11-06 through 2024-11-10
Lun
-
Mar
-
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-11-14 through 2024-12-15
Lun
-
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-12-16 through 2024-12-24
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-12-26 through 2025-01-27
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-01-31 through 2025-02-07
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-02-09 through 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-03-06 through 2025-04-04
Lun
Mar
-
Mie
-
Jue
Vie
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective from 2025-04-06
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 334)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Valid until 2024-10-05
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 318)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-06 through 2024-10-26
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 318)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-27 through 2025-04-05
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 318)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective from 2025-04-06
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 318)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Valid until 2024-10-05
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 322)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-06 through 2024-10-26
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 322)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-27 through 2025-04-05
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 322)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective from 2025-04-06
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 322)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-07 through 2024-10-25
Lun
Mar
Mie
Jue
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 304)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-12 through 2024-10-19
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 304)
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Operates only on 2024-10-26
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 304)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Operates only on 2024-09-20
Lun
-
Mar
-
Mie
-
Jue
-
Vie
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 326)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Operates only on 2024-09-04
Lun
-
Mar
-
Mie
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 326)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-06 through 2024-10-20
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 326)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-27 through 2025-04-05
Lun
Mar
Mie
Jue
Vie
Sab
Dom
Codeshare flight, operated by Virgin Australia. (VA 326)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Operates only on 2024-09-22
Lun
-
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
Codeshare flight, operated by Virgin Australia. (VA 326)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Operates only on 2024-10-28
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 302)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-11-11 through 2024-12-02
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 302)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Operates only on 2025-03-03
Lun
Mar
-
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 302)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-03-11 through 2025-03-17
Lun
Mar
Mie
-
Jue
-
Vie
-
Sab
-
Dom
-
Codeshare flight, operated by Virgin Australia. (VA 302)
Duration: 2:20, non-stop
Boeing 737-800 (73H)
prev        Page 24 / 33        next
  • Una ruta nacional saliendo desde el aeropuerto Brisbane (BNE) y llegando al aeropuerto Melbourne (MEL).
  • El vuelo tiene una distancia de 854 millas, o 1374 km.
  • La zona horaria tanto del aeropuerto de salida como del de llegada es UTC+10 . La hora actual en ambos aeropuertos es (loading...).
  • Para vuelos directos, el tiempo de vuelo oscila entre 2:20 y 2:25.