Minneapolis/Saint Paul (MSP)到Orlando (MCO)全部航班

选择出发日期:
航班时刻表
直达航班
日 06:24 Minneapolis/Saint Paul (MSP) 2 10:47 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:23 Operates only on 2026-02-15
一 06:25 Minneapolis/Saint Paul (MSP) 2 10:34 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:09 Operates only on 2026-05-25
五 06:25 Minneapolis/Saint Paul (MSP) 2 10:37 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:12 Effective 2026-08-28 through 2026-09-04
一,五 06:30 Minneapolis/Saint Paul (MSP) 2 10:57 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:27 Effective 2026-01-02 through 2026-01-05
五 06:30 Minneapolis/Saint Paul (MSP) 2 10:53 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:23 Operates only on 2026-01-30
一,三 06:30 Minneapolis/Saint Paul (MSP) 2 10:39 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:09 Effective 2026-05-04 through 2026-05-06
一 06:30 Minneapolis/Saint Paul (MSP) 2 10:42 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:12 Operates only on 2026-06-22
二-日 06:35 Minneapolis/Saint Paul (MSP) 2 10:44 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:09 Effective 2026-04-29 through 2026-05-05
一-四,六,日 06:35 Minneapolis/Saint Paul (MSP) 2 10:44 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:09 Effective 2026-05-07 through 2026-05-16
二,三,六,日 06:35 Minneapolis/Saint Paul (MSP) 2 10:44 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:09 Effective 2026-05-19 through 2026-05-24
三 06:35 Minneapolis/Saint Paul (MSP) 2 10:44 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:09 Operates only on 2026-05-27
五 06:35 Minneapolis/Saint Paul (MSP) 2 10:47 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:12 Operates only on 2026-06-26
一 06:35 Minneapolis/Saint Paul (MSP) 2 10:47 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:12 Operates only on 2026-08-31
四 06:36 Minneapolis/Saint Paul (MSP) 2 10:59 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:23 Operates only on 2026-01-08
日 06:36 Minneapolis/Saint Paul (MSP) 2 10:59 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:23 Effective 2026-01-18 through 2026-01-25
四 06:42 Minneapolis/Saint Paul (MSP) 2 11:05 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:23 Effective 2026-01-22 through 2026-01-29
四 06:42 Minneapolis/Saint Paul (MSP) 2 11:03 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:21 Operates only on 2026-03-19
六 06:42 Minneapolis/Saint Paul (MSP) 2 10:51 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:09 Operates only on 2026-05-30
四 06:48 Minneapolis/Saint Paul (MSP) 2 11:11 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:23 Operates only on 2026-01-15
六,日 07:00 Minneapolis/Saint Paul (MSP) 2 11:14 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:14 Effective 2026-09-05 through 2026-09-06
一 07:05 Minneapolis/Saint Paul (MSP) 2 11:19 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:14 Operates only on 2026-09-07
日 07:06 Minneapolis/Saint Paul (MSP) 2 11:27 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:21 Operates only on 2026-03-22
一 07:10 Minneapolis/Saint Paul (MSP) 2 11:25 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Operates only on 2026-06-08
二 07:10 Minneapolis/Saint Paul (MSP) 2 11:25 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Effective 2026-06-23 through 2026-06-30
日 07:10 Minneapolis/Saint Paul (MSP) 2 11:25 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Operates only on 2026-07-12
一 07:10 Minneapolis/Saint Paul (MSP) 2 11:25 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Operates only on 2026-07-27
四 07:12 Minneapolis/Saint Paul (MSP) 2 11:42 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:30 Operates only on 2026-01-01
五 07:18 Minneapolis/Saint Paul (MSP) 2 11:34 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:16 Operates only on 2026-04-10
二 07:20 Minneapolis/Saint Paul (MSP) 2 11:31 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:11 Effective 2026-05-26 through 2026-06-02
二-四,六,日 07:20 Minneapolis/Saint Paul (MSP) 2 11:35 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Effective 2026-06-03 through 2026-06-11
一,二,四-六 07:20 Minneapolis/Saint Paul (MSP) 2 11:35 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Effective 2026-06-15 through 2026-06-20
一,三,四,六 07:20 Minneapolis/Saint Paul (MSP) 2 11:35 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Effective 2026-06-24 through 2026-07-01
二,三,五-日 07:20 Minneapolis/Saint Paul (MSP) 2 11:35 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Effective 2026-07-03 through 2026-07-11
一-三,六,日 07:20 Minneapolis/Saint Paul (MSP) 2 11:35 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Effective 2026-07-13 through 2026-07-22
二,五-日 07:20 Minneapolis/Saint Paul (MSP) 2 11:35 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Effective 2026-07-24 through 2026-07-28
二-四,六,日 07:20 Minneapolis/Saint Paul (MSP) 2 11:35 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Effective 2026-08-01 through 2026-08-13
一,二,五,六 07:20 Minneapolis/Saint Paul (MSP) 2 11:35 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Effective 2026-08-14 through 2026-08-21
一-四,六,日 07:20 Minneapolis/Saint Paul (MSP) 2 11:34 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:14 Effective 2026-08-19 through 2026-08-29
二 07:20 Minneapolis/Saint Paul (MSP) 2 11:34 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:14 Operates only on 2026-09-01
四 07:24 Minneapolis/Saint Paul (MSP) 2 11:35 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:11 Operates only on 2026-05-28
日 07:25 Minneapolis/Saint Paul (MSP) 2 11:40 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Operates only on 2026-06-21
四 07:25 Minneapolis/Saint Paul (MSP) 2 11:40 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Operates only on 2026-07-02
五 07:30 Minneapolis/Saint Paul (MSP) 2 11:45 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Operates only on 2026-06-05
三 07:30 Minneapolis/Saint Paul (MSP) 2 11:45 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Operates only on 2026-06-17
三 07:30 Minneapolis/Saint Paul (MSP) 2 11:45 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Operates only on 2026-07-29
六 07:35 Minneapolis/Saint Paul (MSP) 2 11:50 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Operates only on 2026-06-13
四 07:50 Minneapolis/Saint Paul (MSP) 2 12:05 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:15 Operates only on 2026-07-30
四 08:12 Minneapolis/Saint Paul (MSP) 2 12:33 Orlando (MCO) B
Sun Country Airlines SY 341 Non-stop Boeing 737-800 (738) 3:21 Operates only on 2026-04-02
四 05:42 Minneapolis/Saint Paul (MSP) 2 10:03 Orlando (MCO) B
Sun Country Airlines SY 343 Non-stop Boeing 737-800 (738) 3:21 Operates only on 2026-04-02
五,日 06:24 Minneapolis/Saint Paul (MSP) 2 10:45 Orlando (MCO) B
Sun Country Airlines SY 343 Non-stop Boeing 737-800 (738) 3:21 Effective 2026-03-08 through 2026-03-13
prev   1 2 3 4 5 ... 11 12 13   next


Minneapolis/Saint Paul (MSP)到Orlando (MCO)全部航班
选择出发日期:
航班时刻表
直达航班

Operates only on 2026-02-15

-

-

-

-

-

-

Duration: 3:23, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-05-25


-

-

-

-

-

-
Duration: 3:09, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-08-28 through 2026-09-04

-

-

-

-


-

-
Duration: 3:12, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-01-02 through 2026-01-05


-

-

-


-

-
Duration: 3:27, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-01-30

-

-

-

-


-

-
Duration: 3:23, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-05-04 through 2026-05-06


-


-

-

-

-
Duration: 3:09, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-06-22


-

-

-

-

-

-
Duration: 3:12, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-04-29 through 2026-05-05

-






Duration: 3:09, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-05-07 through 2026-05-16





-


Duration: 3:09, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-05-19 through 2026-05-24

-



-

-


Duration: 3:09, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-05-27

-

-


-

-

-

-
Duration: 3:09, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-06-26

-

-

-

-


-

-
Duration: 3:12, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-08-31


-

-

-

-

-

-
Duration: 3:12, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-01-08

-

-

-


-

-

-
Duration: 3:23, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-01-18 through 2026-01-25

-

-

-

-

-

-

Duration: 3:23, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-01-22 through 2026-01-29

-

-

-


-

-

-
Duration: 3:23, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-03-19

-

-

-


-

-

-
Duration: 3:21, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-05-30

-

-

-

-

-


-
Duration: 3:09, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-01-15

-

-

-


-

-

-
Duration: 3:23, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-09-05 through 2026-09-06

-

-

-

-

-


Duration: 3:14, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-09-07


-

-

-

-

-

-
Duration: 3:14, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-03-22

-

-

-

-

-

-

Duration: 3:21, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-06-08


-

-

-

-

-

-
Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-06-23 through 2026-06-30

-


-

-

-

-

-
Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-07-12

-

-

-

-

-

-

Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-07-27


-

-

-

-

-

-
Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-01-01

-

-

-


-

-

-
Duration: 3:30, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-04-10

-

-

-

-


-

-
Duration: 3:16, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-05-26 through 2026-06-02

-


-

-

-

-

-
Duration: 3:11, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-06-03 through 2026-06-11

-




-


Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-06-15 through 2026-06-20



-




-
Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-06-24 through 2026-07-01


-



-


-
Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-07-03 through 2026-07-11

-



-



Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-07-13 through 2026-07-22




-

-


Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-07-24 through 2026-07-28

-


-

-



Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-08-01 through 2026-08-13

-




-


Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-08-14 through 2026-08-21



-

-



-
Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-08-19 through 2026-08-29





-


Duration: 3:14, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-09-01

-


-

-

-

-

-
Duration: 3:14, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-05-28

-

-

-


-

-

-
Duration: 3:11, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-06-21

-

-

-

-

-

-

Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-07-02

-

-

-


-

-

-
Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-06-05

-

-

-

-


-

-
Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-06-17

-

-


-

-

-

-
Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-07-29

-

-


-

-

-

-
Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-06-13

-

-

-

-

-


-
Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-07-30

-

-

-


-

-

-
Duration: 3:15, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-04-02

-

-

-


-

-

-
Duration: 3:21, non-stop
Boeing 737-800 (738)

直达航班

Operates only on 2026-04-02

-

-

-


-

-

-
Duration: 3:21, non-stop
Boeing 737-800 (738)

直达航班

Effective 2026-03-08 through 2026-03-13

-

-

-

-


-

Duration: 3:21, non-stop
Boeing 737-800 (738)
prev        Page 2 / 13        next
  • 国内航线 从 Minneapolis/Saint Paul (MSP)机场出发,到达 Orlando (MCO)机场。
  • 航班飞行距离为 1310英里( 2108公里)。
  • 出发地的时区为 UTC-6 , 目的地的时区为 UTC-5 . 出发地的当前时间是 (loading...),目的地的当前时间是 (loading...)。 两地时差 (loading...)小时。
  • 直达航班的最短飞行时间为3:09 ,最长飞行时间为3:35。