Southwest Airlines 航班 WN 879: 复合航线

选择出发日期:
航班时刻表
直达航班
一-五 06:10 Ronald Reagan Washington (DCA) 07:50 Kansas City (MCI)
WN 879 Non-stop Boeing 737-700 (73W) 2:40 Valid until 2025-06-04
六,日 06:55 Ronald Reagan Washington (DCA) 08:40 Kansas City (MCI)
WN 879 Non-stop Boeing 737-700 (73W) 2:45 Valid until 2025-06-01
一,四,五,日 07:00 Tucson (TUS) 11:15 Midway, Chicago (MDW)
WN 879 Non-stop Boeing 737-800 (73H) 3:15 Effective 2025-11-02 through 2025-11-16
一,五,日 07:00 Tucson (TUS) 11:15 Midway, Chicago (MDW)
WN 879 Non-stop Boeing 737-800 (73H) 3:15 Effective 2025-11-21 through 2025-11-28
五,日 07:00 Tucson (TUS) 11:15 Midway, Chicago (MDW)
WN 879 Non-stop Boeing 737-800 (73H) 3:15 Effective 2025-12-07 through 2025-12-14
四 07:00 Tucson (TUS) 11:15 Midway, Chicago (MDW)
WN 879 Non-stop Boeing 737-800 (73H) 3:15 Operates only on 2025-12-18
一 07:00 Tucson (TUS) 11:15 Midway, Chicago (MDW)
WN 879 Non-stop Boeing 737-800 (73H) 3:15 Operates only on 2026-01-05
一-三 07:15 Denver (DEN) 08:20 Las Vegas Harry Reid (LAS) 1
WN 879 Non-stop Boeing 737-800 (73H) 2:05 Effective 2025-11-25 through 2025-12-01
一,二,五,日 07:15 Denver (DEN) 08:20 Las Vegas Harry Reid (LAS) 1
WN 879 Non-stop Boeing 737-800 (73H) 2:05 Effective 2025-12-19 through 2026-01-04
六 07:25 Denver (DEN) 08:30 Las Vegas Harry Reid (LAS) 1
WN 879 Non-stop Boeing 737-800 (73H) 2:05 Effective 2025-11-22 through 2025-11-29
六 07:25 Denver (DEN) 08:30 Las Vegas Harry Reid (LAS) 1
WN 879 Non-stop Boeing 737-800 (73H) 2:05 Effective 2025-12-20 through 2026-01-03
六 07:40 Tucson (TUS) 11:50 Midway, Chicago (MDW)
WN 879 Non-stop Boeing 737-800 (73H) 3:10 Effective 2025-11-08 through 2025-11-15
六 07:40 Tucson (TUS) 11:50 Midway, Chicago (MDW)
WN 879 Non-stop Boeing 737-800 (73H) 3:10 Effective 2025-12-06 through 2025-12-13
二,三 07:45 Midland (MAF) 09:05 Love Field, Dallas (DAL) 1
WN 879 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-06-10 through 2025-07-30
一,四,五 08:25 Kansas City (MCI) 09:25 Las Vegas Harry Reid (LAS) 1
WN 879 Non-stop Boeing 737-700 (73W) 3:00 Valid until 2025-06-02
一,四,五 08:40 Love Field, Dallas (DAL) 1 09:50 San Diego (SAN) 1
WN 879 Non-stop Boeing 737 MAX 8 (7M8) 3:10 Effective 2025-10-02 through 2025-10-31
日 09:20 Midway, Chicago (MDW) 12:25 Hartford (BDL)
WN 879 Non-stop Boeing 737-800 (73H) 2:05 Operates only on 2025-11-30
四 10:15 Burbank (BUR) 11:35 San Jose (SJC) B
WN 879 Non-stop Boeing 737-700 (Scimitar Winglets) 1:20 Operates only on 2025-11-27
六 10:30 Orlando (MCO) 12:50 Pittsburgh (PIT)
WN 879 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-08-09 through 2025-09-27
一,四,五 10:30 San Diego (SAN) 1 12:15 Sacramento (SMF) B
WN 879 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2025-10-02 through 2025-10-31
二,三 10:30 San Diego (SAN) 1 12:15 Sacramento (SMF) B
WN 879 Non-stop Boeing 737-800 (73H) 1:45 Effective 2025-10-07 through 2025-10-29
六 10:35 San Diego (SAN) 1 12:25 Sacramento (SMF) B
WN 879 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-10-04 through 2025-11-01
一,四,五 10:55 Midland (MAF) 12:15 Love Field, Dallas (DAL) 1
WN 879 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-06-05 through 2025-07-03
一,四,五 10:55 Midland (MAF) 12:15 Love Field, Dallas (DAL) 1
WN 879 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-07-07 through 2025-08-04
六 11:55 Nashville (BNA) 14:45 Baltimore (BWI)
WN 879 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-06-07 through 2025-08-02
一,四,五,日 11:55 Midway, Chicago (MDW) 14:55 Hartford (BDL)
WN 879 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-11-02 through 2025-11-16
一,五,日 11:55 Midway, Chicago (MDW) 14:55 Hartford (BDL)
WN 879 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-11-21 through 2025-11-28
五,日 11:55 Midway, Chicago (MDW) 14:55 Hartford (BDL)
WN 879 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-12-07 through 2025-12-14
四 11:55 Midway, Chicago (MDW) 14:55 Hartford (BDL)
WN 879 Non-stop Boeing 737-800 (73H) 2:00 Operates only on 2025-12-18
一 11:55 Midway, Chicago (MDW) 14:55 Hartford (BDL)
WN 879 Non-stop Boeing 737-800 (73H) 2:00 Operates only on 2026-01-05
二,三 14:00 Hartford (BDL) 17:05 Tampa (TPA)
WN 879 Non-stop Boeing 737 MAX 8 (7M8) 3:05 Effective 2025-11-04 through 2025-11-12
一-四 14:00 Hartford (BDL) 17:05 Tampa (TPA)
WN 879 Non-stop Boeing 737 MAX 8 (7M8) 3:05 Effective 2025-11-17 through 2025-11-20
一-五 14:00 Hartford (BDL) 17:05 Tampa (TPA)
WN 879 Non-stop Boeing 737 MAX 8 (7M8) 3:05 Effective 2025-12-02 through 2025-12-11
一-三 14:00 Hartford (BDL) 17:05 Tampa (TPA)
WN 879 Non-stop Boeing 737 MAX 8 (7M8) 3:05 Effective 2025-12-15 through 2025-12-17
三,四 14:00 Hartford (BDL) 17:05 Tampa (TPA)
WN 879 Non-stop Boeing 737 MAX 8 (7M8) 3:05 Effective 2025-12-24 through 2026-01-01
一,四,五,日 15:35 Hartford (BDL) 18:45 Tampa (TPA)
WN 879 Non-stop Boeing 737-800 (73H) 3:10 Effective 2025-11-02 through 2025-11-16
一,五,日 15:35 Hartford (BDL) 18:45 Tampa (TPA)
WN 879 Non-stop Boeing 737-800 (73H) 3:10 Effective 2025-11-21 through 2025-11-28
五,日 15:35 Hartford (BDL) 18:45 Tampa (TPA)
WN 879 Non-stop Boeing 737-800 (73H) 3:10 Effective 2025-12-07 through 2025-12-14
四 15:35 Hartford (BDL) 18:45 Tampa (TPA)
WN 879 Non-stop Boeing 737-800 (73H) 3:10 Operates only on 2025-12-18
一 15:35 Hartford (BDL) 18:45 Tampa (TPA)
WN 879 Non-stop Boeing 737-800 (73H) 3:10 Operates only on 2026-01-05
日 18:00 Baltimore (BWI) 20:10 Love Field, Dallas (DAL) 1
WN 879 Non-stop Boeing 737-800 (73H) 3:10 Effective 2025-08-10 through 2025-08-24
日 18:00 Baltimore (BWI) 20:35 Sarasota/Bradenton (SRQ)
WN 879 Non-stop Boeing 737-700 (73W) 2:35 Operates only on 2025-08-31
日 18:00 Baltimore (BWI) 20:10 Love Field, Dallas (DAL) 1
WN 879 Non-stop Boeing 737-800 (73H) 3:10 Effective 2025-09-07 through 2025-09-28
二,三 18:10 Orlando (MCO) 20:35 Pittsburgh (PIT)
WN 879 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-08-05 through 2025-10-01
日 19:05 Love Field, Dallas (DAL) 1 20:15 San Diego (SAN) 1
WN 879 Non-stop Boeing 737 MAX 8 (7M8) 3:10 Effective 2025-10-05 through 2025-10-26
日 21:05 San Diego (SAN) 1 22:55 Sacramento (SMF) B
WN 879 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-10-05 through 2025-10-26
转机航班
一,四,五 06:10 Ronald Reagan Washington (DCA) 09:25 Las Vegas Harry Reid (LAS) 1
WN 879 1-stop Boeing 737-700 (73W) 6:15 Valid until 2025-06-02
一,四,五,日 07:00 Tucson (TUS) 14:55 Hartford (BDL)
WN 879 1-stop Boeing 737-800 (73H) 5:55 Effective 2025-11-02 through 2025-11-16
一,五,日 07:00 Tucson (TUS) 14:55 Hartford (BDL)
WN 879 1-stop Boeing 737-800 (73H) 5:55 Effective 2025-11-21 through 2025-11-28
五,日 07:00 Tucson (TUS) 14:55 Hartford (BDL)
WN 879 1-stop Boeing 737-800 (73H) 5:55 Effective 2025-12-07 through 2025-12-14
四 07:00 Tucson (TUS) 14:55 Hartford (BDL)
WN 879 1-stop Boeing 737-800 (73H) 5:55 Operates only on 2025-12-18
一 07:00 Tucson (TUS) 14:55 Hartford (BDL)
WN 879 1-stop Boeing 737-800 (73H) 5:55 Operates only on 2026-01-05
一,四,五 08:40 Love Field, Dallas (DAL) 1 12:15 Sacramento (SMF) B
WN 879 1-stop Boeing 737 MAX 8 (7M8) 5:35 Effective 2025-10-02 through 2025-10-31
一,四,五,日 11:55 Midway, Chicago (MDW) 18:45 Tampa (TPA)
WN 879 1-stop Boeing 737-800 (73H) 5:50 Effective 2025-11-02 through 2025-11-16
一,五,日 11:55 Midway, Chicago (MDW) 18:45 Tampa (TPA)
WN 879 1-stop Boeing 737-800 (73H) 5:50 Effective 2025-11-21 through 2025-11-28
五,日 11:55 Midway, Chicago (MDW) 18:45 Tampa (TPA)
WN 879 1-stop Boeing 737-800 (73H) 5:50 Effective 2025-12-07 through 2025-12-14
四 11:55 Midway, Chicago (MDW) 18:45 Tampa (TPA)
WN 879 1-stop Boeing 737-800 (73H) 5:50 Operates only on 2025-12-18
一 11:55 Midway, Chicago (MDW) 18:45 Tampa (TPA)
WN 879 1-stop Boeing 737-800 (73H) 5:50 Operates only on 2026-01-05
日 19:05 Love Field, Dallas (DAL) 1 22:55 Sacramento (SMF) B
WN 879 1-stop Boeing 737 MAX 8 (7M8) 5:50 Effective 2025-10-05 through 2025-10-26
一,四,五,日 07:00 Tucson (TUS) 18:45 Tampa (TPA)
WN 879 2-stop Boeing 737-800 (73H) 9:45 Effective 2025-11-02 through 2025-11-16
一,五,日 07:00 Tucson (TUS) 18:45 Tampa (TPA)
WN 879 2-stop Boeing 737-800 (73H) 9:45 Effective 2025-11-21 through 2025-11-28
五,日 07:00 Tucson (TUS) 18:45 Tampa (TPA)
WN 879 2-stop Boeing 737-800 (73H) 9:45 Effective 2025-12-07 through 2025-12-14
四 07:00 Tucson (TUS) 18:45 Tampa (TPA)
WN 879 2-stop Boeing 737-800 (73H) 9:45 Operates only on 2025-12-18
一 07:00 Tucson (TUS) 18:45 Tampa (TPA)
WN 879 2-stop Boeing 737-800 (73H) 9:45 Operates only on 2026-01-05
此航班代码的飞行航线如下:
Southwest Airlines 航班 WN 879: 复合航线
选择出发日期:
航班时刻表
直达航班

Southwest Airlines WN879
Valid until 2025-06-04






-

-
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN879
Valid until 2025-06-01

-

-

-

-

-


Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN879
Effective 2025-11-02 through 2025-11-16


-

-



-

Duration: 3:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-11-21 through 2025-11-28


-

-

-


-

Duration: 3:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-12-07 through 2025-12-14

-

-

-

-


-

Duration: 3:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Operates only on 2025-12-18

-

-

-


-

-

-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Operates only on 2026-01-05


-

-

-

-

-

-
Duration: 3:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-11-25 through 2025-12-01




-

-

-

-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-12-19 through 2026-01-04



-

-


-

Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-11-22 through 2025-11-29

-

-

-

-

-


-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-12-20 through 2026-01-03

-

-

-

-

-


-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-11-08 through 2025-11-15

-

-

-

-

-


-
Duration: 3:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-12-06 through 2025-12-13

-

-

-

-

-


-
Duration: 3:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-06-10 through 2025-07-30

-



-

-

-

-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN879
Valid until 2025-06-02


-

-



-

-
Duration: 3:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN879
Effective 2025-10-02 through 2025-10-31


-

-



-

-
Duration: 3:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN879
Operates only on 2025-11-30

-

-

-

-

-

-

Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Operates only on 2025-11-27

-

-

-


-

-

-
Duration: 1:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN879
Effective 2025-08-09 through 2025-09-27

-

-

-

-

-


-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN879
Effective 2025-10-02 through 2025-10-31


-

-



-

-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN879
Effective 2025-10-07 through 2025-10-29

-



-

-

-

-
Duration: 1:45, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-10-04 through 2025-11-01

-

-

-

-

-


-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN879
Effective 2025-06-05 through 2025-07-03


-

-



-

-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-07-07 through 2025-08-04


-

-



-

-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-06-07 through 2025-08-02

-

-

-

-

-


-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN879
Effective 2025-11-02 through 2025-11-16


-

-



-

Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-11-21 through 2025-11-28


-

-

-


-

Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-12-07 through 2025-12-14

-

-

-

-


-

Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Operates only on 2025-12-18

-

-

-


-

-

-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Operates only on 2026-01-05


-

-

-

-

-

-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-11-04 through 2025-11-12

-



-

-

-

-
Duration: 3:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN879
Effective 2025-11-17 through 2025-11-20





-

-

-
Duration: 3:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN879
Effective 2025-12-02 through 2025-12-11






-

-
Duration: 3:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN879
Effective 2025-12-15 through 2025-12-17




-

-

-

-
Duration: 3:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN879
Effective 2025-12-24 through 2026-01-01

-

-



-

-

-
Duration: 3:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN879
Effective 2025-11-02 through 2025-11-16


-

-



-

Duration: 3:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-11-21 through 2025-11-28


-

-

-


-

Duration: 3:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-12-07 through 2025-12-14

-

-

-

-


-

Duration: 3:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Operates only on 2025-12-18

-

-

-


-

-

-
Duration: 3:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Operates only on 2026-01-05


-

-

-

-

-

-
Duration: 3:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-08-10 through 2025-08-24

-

-

-

-

-

-

Duration: 3:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Operates only on 2025-08-31

-

-

-

-

-

-

Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN879
Effective 2025-09-07 through 2025-09-28

-

-

-

-

-

-

Duration: 3:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-08-05 through 2025-10-01

-



-

-

-

-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN879
Effective 2025-10-05 through 2025-10-26

-

-

-

-

-

-

Duration: 3:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN879
Effective 2025-10-05 through 2025-10-26

-

-

-

-

-

-

Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

转机航班

Southwest Airlines WN879
Valid until 2025-06-02


-

-



-

-
Duration: 6:15, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN879
Effective 2025-11-02 through 2025-11-16


-

-



-

Duration: 5:55, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-11-21 through 2025-11-28


-

-

-


-

Duration: 5:55, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-12-07 through 2025-12-14

-

-

-

-


-

Duration: 5:55, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Operates only on 2025-12-18

-

-

-


-

-

-
Duration: 5:55, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Operates only on 2026-01-05


-

-

-

-

-

-
Duration: 5:55, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-10-02 through 2025-10-31


-

-



-

-
Duration: 5:35, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN879
Effective 2025-11-02 through 2025-11-16


-

-



-

Duration: 5:50, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-11-21 through 2025-11-28


-

-

-


-

Duration: 5:50, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-12-07 through 2025-12-14

-

-

-

-


-

Duration: 5:50, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Operates only on 2025-12-18

-

-

-


-

-

-
Duration: 5:50, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Operates only on 2026-01-05


-

-

-

-

-

-
Duration: 5:50, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-10-05 through 2025-10-26

-

-

-

-

-

-

Duration: 5:50, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN879
Effective 2025-11-02 through 2025-11-16


-

-



-

Duration: 9:45, 2-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-11-21 through 2025-11-28


-

-

-


-

Duration: 9:45, 2-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Effective 2025-12-07 through 2025-12-14

-

-

-

-


-

Duration: 9:45, 2-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Operates only on 2025-12-18

-

-

-


-

-

-
Duration: 9:45, 2-stop
Boeing 737-800 (73H)

Southwest Airlines WN879
Operates only on 2026-01-05


-

-

-

-

-

-
Duration: 9:45, 2-stop
Boeing 737-800 (73H)
此航班代码的飞行航线如下:
  • Baltimore (BWI) - Love Field, Dallas (DAL)
  • Baltimore (BWI) - Sarasota/Bradenton (SRQ)
  • Burbank (BUR) - San Jose (SJC)
  • Denver (DEN) - Las Vegas Harry Reid (LAS)
  • Hartford (BDL) - Tampa (TPA)
  • Kansas City (MCI) - Las Vegas Harry Reid (LAS)
  • Love Field, Dallas (DAL) - Sacramento (SMF)
  • Love Field, Dallas (DAL) - San Diego (SAN)
  • Midland (MAF) - Love Field, Dallas (DAL)
  • Midway, Chicago (MDW) - Hartford (BDL)
  • Midway, Chicago (MDW) - Tampa (TPA)
  • Nashville (BNA) - Baltimore (BWI)
  • Orlando (MCO) - Pittsburgh (PIT)
  • Ronald Reagan Washington (DCA) - Kansas City (MCI)
  • Ronald Reagan Washington (DCA) - Las Vegas Harry Reid (LAS)
  • San Diego (SAN) - Sacramento (SMF)
  • Tucson (TUS) - Hartford (BDL)
  • Tucson (TUS) - Midway, Chicago (MDW)
  • Tucson (TUS) - Tampa (TPA)