Southwest Airlines 航班 WN 124: 复合航线

选择出发日期:
航班时刻表
直达航班
日 18:50 Pittsburgh (PIT) 21:10 Tampa (TPA)
WN 124 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-06-07 through 2026-08-02
二,三 19:30 Austin (AUS) 23:25 Raleigh/Durham (RDU) 1
WN 124 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Effective 2026-06-09 through 2026-07-29
此航班代码的飞行航线如下:
Southwest Airlines 航班 WN 124: 复合航线
选择出发日期:
航班时刻表
直达航班

Southwest Airlines WN124
Effective 2026-06-07 through 2026-08-02

-

-

-

-

-

-

Duration: 2:20, non-stop
Boeing 737-800 (73H)

直达航班

Southwest Airlines WN124
Effective 2026-06-09 through 2026-07-29

-



-

-

-

-
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)
此航班代码的飞行航线如下:
  • Austin (AUS) - Raleigh/Durham (RDU)
  • Pittsburgh (PIT) - Tampa (TPA)