| 航班时刻表 |
|---|
| 直达(代码共享)航班 |
| 四
09:05
Tucuman (TUC)
10:55
Buenos Aires Jorge Newbery Airfield (AEP) G3 3221 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Operates only on 2026-04-02 代码共享航班,由Aerolineas Argentinas负责飞行。(AR 1475) |
| 四
12:20
Ushuaia (USH)
15:50
Buenos Aires Ministro Pistarini Intl (EZE) DA G3 3221 Non-stop Boeing 737 MAX 8 (7M8) 3:30 Effective 2026-07-09 through 2026-08-27 代码共享航班,由Aerolineas Argentinas负责飞行。(AR 1881) |
| 日
13:00
Tucuman (TUC)
14:50
Buenos Aires Jorge Newbery Airfield (AEP) G3 3221 Non-stop Boeing 737-800 (738) 1:50 Effective 2026-04-12 through 2026-07-05 代码共享航班,由Aerolineas Argentinas负责飞行。(AR 1475) |
| 日
13:00
Tucuman (TUC)
14:50
Buenos Aires Jorge Newbery Airfield (AEP) G3 3221 Non-stop Boeing 737-700 (73R) 1:50 Effective 2026-07-12 through 2026-08-30 代码共享航班,由Aerolineas Argentinas负责飞行。(AR 1475) |
| 日
13:00
Tucuman (TUC)
14:50
Buenos Aires Jorge Newbery Airfield (AEP) G3 3221 Non-stop Boeing 737-800 (738) 1:50 Effective from 2026-09-06 代码共享航班,由Aerolineas Argentinas负责飞行。(AR 1475) |
| 日
13:20
Tucuman (TUC)
15:10
Buenos Aires Jorge Newbery Airfield (AEP) G3 3221 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:50 Operates only on 2026-04-05 代码共享航班,由Aerolineas Argentinas负责飞行。(AR 1475) |
| 三
16:15
Tucuman (TUC)
18:05
Buenos Aires Jorge Newbery Airfield (AEP) G3 3221 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:50 Operates only on 2026-04-01 代码共享航班,由Aerolineas Argentinas负责飞行。(AR 1475) |
| 一,二
21:10
Salta (SLA)
23:15
Buenos Aires Jorge Newbery Airfield (AEP) G3 3221 Non-stop Boeing 737-800 (738) 2:05 Effective 2026-07-06 through 2026-08-31 代码共享航班,由Aerolineas Argentinas负责飞行。(AR 1501) |
| 一
21:20
Salta (SLA)
23:25
Buenos Aires Jorge Newbery Airfield (AEP) G3 3221 Non-stop Boeing 737-800 (738) 2:05 Effective from 2026-09-07 代码共享航班,由Aerolineas Argentinas负责飞行。(AR 1501) |