Gol 航班 G3 1239: 复合航线

选择出发日期:
航班时刻表
直达航班
三,五,日 01:50 Rio Branco (RBR) 07:10 Brasilia (BSB)
G3 1239 Non-stop Boeing 737-800 (738) 3:20 Effective 2026-03-04 through 2026-03-27
一-五 18:25 Porto Alegre (POA) 1 20:25 Sao Paulo-Guarulhos (GRU) 2
G3 1239 Non-stop Boeing 737-800 (738) 2:00 Effective from 2026-05-04
日 18:30 Porto Alegre (POA) 1 20:20 Sao Paulo-Guarulhos (GRU) 2
G3 1239 Non-stop Boeing 737-800 (738) 1:50 Effective 2026-03-29 through 2026-04-12
一-四 18:30 Porto Alegre (POA) 1 20:30 Sao Paulo-Guarulhos (GRU) 2
G3 1239 Non-stop Boeing 737-800 (738) 2:00 Effective 2026-03-30 through 2026-04-09
一-五 18:30 Porto Alegre (POA) 1 20:30 Sao Paulo-Guarulhos (GRU) 2
G3 1239 Non-stop Boeing 737-800 (738) 2:00 Effective 2026-04-10 through 2026-04-30
日 18:30 Porto Alegre (POA) 1 20:20 Sao Paulo-Guarulhos (GRU) 2
G3 1239 Non-stop Boeing 737-800 (738) 1:50 Effective 2026-04-26 through 2026-05-03
六,日 18:30 Porto Alegre (POA) 1 20:20 Sao Paulo-Guarulhos (GRU) 2
G3 1239 Non-stop Boeing 737-800 (738) 1:50 Effective from 2026-05-09
二,四,六 23:45 Manaus (MAO) 00:45 Rio Branco (RBR)
G3 1239 Non-stop Boeing 737-800 (738) 2:00 Effective 2026-03-03 through 2026-03-28
此航班在起飞后隔一天抵达。
转机航班
二,四,六 23:45 Manaus (MAO) 07:10 Brasilia (BSB)
G3 1239 1-stop Boeing 737-800 (738) 6:25 Effective 2026-03-03 through 2026-03-26
此航班在起飞后隔一天抵达。
此航班代码的飞行航线如下:
Gol 航班 G3 1239: 复合航线
选择出发日期:
航班时刻表
直达航班

Gol G31239
Effective 2026-03-04 through 2026-03-27

-

-


-


-

Duration: 3:20, non-stop
Boeing 737-800 (738)

直达航班

Gol G31239
Effective from 2026-05-04






-

-
Duration: 2:00, non-stop
Boeing 737-800 (738)

直达航班

Gol G31239
Effective 2026-03-29 through 2026-04-12

-

-

-

-

-

-

Duration: 1:50, non-stop
Boeing 737-800 (738)

直达航班

Gol G31239
Effective 2026-03-30 through 2026-04-09





-

-

-
Duration: 2:00, non-stop
Boeing 737-800 (738)

直达航班

Gol G31239
Effective 2026-04-10 through 2026-04-30






-

-
Duration: 2:00, non-stop
Boeing 737-800 (738)

直达航班

Gol G31239
Effective 2026-04-26 through 2026-05-03

-

-

-

-

-

-

Duration: 1:50, non-stop
Boeing 737-800 (738)

直达航班

Gol G31239
Effective from 2026-05-09

-

-

-

-

-


Duration: 1:50, non-stop
Boeing 737-800 (738)

直达航班

Gol G31239
23:45

00:45(+1)
Effective 2026-03-03 through 2026-03-28

-


-


-


-
Duration: 2:00, non-stop
Boeing 737-800 (738)
此航班在起飞后隔一天抵达。

转机航班

Gol G31239
23:45

07:10(+1)
Effective 2026-03-03 through 2026-03-26

-


-


-


-
Duration: 6:25, 1-stop
Boeing 737-800 (738)
此航班在起飞后隔一天抵达。
此航班代码的飞行航线如下:
  • Manaus (MAO) - Brasilia (BSB)
  • Manaus (MAO) - Rio Branco (RBR)
  • Porto Alegre (POA) - Sao Paulo-Guarulhos (GRU)
  • Rio Branco (RBR) - Brasilia (BSB)