| 航班时刻表 |
|---|
| 直达航班 |
| 每日
21:25
Brussels (BRU)
05:35
Addis Ababa (ADD) 2 ET 751 Non-stop Airbus A350-900 (359) 7:10 Effective 2026-03-29 through 2026-10-24 此航班在起飞后隔一天抵达。 |
| 一,二,五,六
21:30
Brussels (BRU)
06:45
Addis Ababa (ADD) 2 ET 751 Non-stop Boeing 787-9 (789) 7:15 Valid until 2026-01-05 此航班在起飞后隔一天抵达。 |
| 二-四,日
21:30
Brussels (BRU)
06:45
Addis Ababa (ADD) 2 ET 751 Non-stop Airbus A350-900 (359) 7:15 Valid until 2026-01-06 此航班在起飞后隔一天抵达。 |
| 二-四,六,日
21:30
Brussels (BRU)
06:45
Addis Ababa (ADD) 2 ET 751 Non-stop Boeing 787-9 (789) 7:15 Effective 2026-01-07 through 2026-01-20 此航班在起飞后隔一天抵达。 |
| 一,五
21:30
Brussels (BRU)
06:45
Addis Ababa (ADD) 2 ET 751 Non-stop Airbus A350-900 (359) 7:15 Effective 2026-01-09 through 2026-01-19 此航班在起飞后隔一天抵达。 |
| 一,三,五
21:30
Brussels (BRU)
06:45
Addis Ababa (ADD) 2 ET 751 Non-stop Airbus A350-900 (359) 7:15 Effective 2026-01-21 through 2026-01-28 此航班在起飞后隔一天抵达。 |
| 二,四,六,日
21:30
Brussels (BRU)
06:45
Addis Ababa (ADD) 2 ET 751 Non-stop Boeing 787-9 (789) 7:15 Effective 2026-01-22 through 2026-01-29 此航班在起飞后隔一天抵达。 |
| 五
21:30
Brussels (BRU)
06:45
Addis Ababa (ADD) 2 ET 751 Non-stop Boeing 787-9 (789) 7:15 Operates only on 2026-01-30 此航班在起飞后隔一天抵达。 |
| 每日
21:30
Brussels (BRU)
06:45
Addis Ababa (ADD) 2 ET 751 Non-stop Airbus A350-900 (359) 7:15 Effective 2026-01-31 through 2026-03-24 此航班在起飞后隔一天抵达。 |
| 三
21:30
Brussels (BRU)
06:45
Addis Ababa (ADD) 2 ET 751 Non-stop Boeing 787-9 (789) 7:15 Operates only on 2026-03-25 此航班在起飞后隔一天抵达。 |
| 四-六
21:30
Brussels (BRU)
06:45
Addis Ababa (ADD) 2 ET 751 Non-stop Airbus A350-900 (359) 7:15 Effective 2026-03-26 through 2026-03-28 此航班在起飞后隔一天抵达。 |
| 每日
21:30
Brussels (BRU)
06:45
Addis Ababa (ADD) 2 ET 751 Non-stop Airbus A350-900 (359) 7:15 Effective from 2026-10-25 此航班在起飞后隔一天抵达。 |