| 航班时刻表 |
|---|
| 直达(代码共享)航班 |
| 二-四,日
07:00
Vienna (VIE) 1
10:10
Madrid (MAD) 4 AA 8596 Non-stop Airbus A319 (319) 3:10 Effective 2026-03-29 through 2026-05-31 代码共享航班,由Iberia负责飞行。(IB 798) |
| 一,五,六
07:00
Vienna (VIE) 1
10:10
Madrid (MAD) 4 AA 8596 Non-stop Airbus A320 (320) 3:10 Effective 2026-03-30 through 2026-06-01 代码共享航班,由Iberia负责飞行。(IB 798) |
| 一,二,五,六
07:00
Vienna (VIE) 1
10:10
Madrid (MAD) 4 AA 8596 Non-stop Airbus A320 (320) 3:10 Effective 2026-06-02 through 2026-06-12 代码共享航班,由Iberia负责飞行。(IB 798) |
| 三,四,日
07:00
Vienna (VIE) 1
10:10
Madrid (MAD) 4 AA 8596 Non-stop Airbus A319 (319) 3:10 Effective 2026-06-03 through 2026-06-11 代码共享航班,由Iberia负责飞行。(IB 798) |
| 三,四,六,日
07:00
Vienna (VIE) 1
10:10
Madrid (MAD) 4 AA 8596 Non-stop Airbus A319 (319) 3:10 Effective 2026-06-13 through 2026-06-18 代码共享航班,由Iberia负责飞行。(IB 798) |
| 一,二,五,六
07:00
Vienna (VIE) 1
10:10
Madrid (MAD) 4 AA 8596 Non-stop Airbus A320 (320) 3:10 Effective 2026-06-15 through 2026-07-18 代码共享航班,由Iberia负责飞行。(IB 798) |
| 三,四,日
07:00
Vienna (VIE) 1
10:10
Madrid (MAD) 4 AA 8596 Non-stop Airbus A319 (319) 3:10 Effective 2026-06-21 through 2026-07-16 代码共享航班,由Iberia负责飞行。(IB 798) |
| 一,二,五-日
07:00
Vienna (VIE) 1
10:10
Madrid (MAD) 4 AA 8596 Non-stop Airbus A320 (320) 3:10 Effective 2026-07-19 through 2026-09-19 代码共享航班,由Iberia负责飞行。(IB 798) |
| 三,四
07:00
Vienna (VIE) 1
10:10
Madrid (MAD) 4 AA 8596 Non-stop Airbus A319 (319) 3:10 Effective 2026-07-22 through 2026-09-17 代码共享航班,由Iberia负责飞行。(IB 798) |
| 二-四,日
07:00
Vienna (VIE) 1
10:10
Madrid (MAD) 4 AA 8596 Non-stop Airbus A319 (319) 3:10 Effective 2026-09-20 through 2026-10-22 代码共享航班,由Iberia负责飞行。(IB 798) |
| 一,五,六
07:00
Vienna (VIE) 1
10:10
Madrid (MAD) 4 AA 8596 Non-stop Airbus A320 (320) 3:10 Effective 2026-09-21 through 2026-10-24 代码共享航班,由Iberia负责飞行。(IB 798) |
| 五
07:05
Vienna (VIE) 1
10:15
Madrid (MAD) 4 AA 8596 Non-stop Airbus A320 (320) 3:10 Valid until 2026-01-09 代码共享航班,由Iberia负责飞行。(IB 798) |
| 一-四,六,日
07:05
Vienna (VIE) 1
10:15
Madrid (MAD) 4 AA 8596 Non-stop Airbus A319 (319) 3:10 Valid until 2026-01-15 代码共享航班,由Iberia负责飞行。(IB 798) |
| 每日
07:05
Vienna (VIE) 1
10:15
Madrid (MAD) 4 AA 8596 Non-stop Airbus A319 (319) 3:10 Effective 2026-01-16 through 2026-01-29 代码共享航班,由Iberia负责飞行。(IB 798) |
| 一-五
07:05
Vienna (VIE) 1
10:15
Madrid (MAD) 4 AA 8596 Non-stop Airbus A320 (320) 3:10 Effective 2026-01-30 through 2026-02-06 代码共享航班,由Iberia负责飞行。(IB 798) |
| 六,日
07:05
Vienna (VIE) 1
10:15
Madrid (MAD) 4 AA 8596 Non-stop Airbus A319 (319) 3:10 Effective 2026-01-31 through 2026-02-01 代码共享航班,由Iberia负责飞行。(IB 798) |
| 每日
07:05
Vienna (VIE) 1
10:15
Madrid (MAD) 4 AA 8596 Non-stop Airbus A320 (320) 3:10 Effective 2026-02-07 through 2026-02-14 代码共享航班,由Iberia负责飞行。(IB 798) |
| 二,四,日
07:05
Vienna (VIE) 1
10:15
Madrid (MAD) 4 AA 8596 Non-stop Airbus A319 (319) 3:10 Effective 2026-02-15 through 2026-02-22 代码共享航班,由Iberia负责飞行。(IB 798) |
| 一,三,五,六
07:05
Vienna (VIE) 1
10:15
Madrid (MAD) 4 AA 8596 Non-stop Airbus A320 (320) 3:10 Effective 2026-02-16 through 2026-02-21 代码共享航班,由Iberia负责飞行。(IB 798) |
| 一,四,日
07:05
Vienna (VIE) 1
10:15
Madrid (MAD) 4 AA 8596 Non-stop Airbus A319 (319) 3:10 Effective 2026-02-23 through 2026-03-02 代码共享航班,由Iberia负责飞行。(IB 798) |
| 二,三,五,六
07:05
Vienna (VIE) 1
10:15
Madrid (MAD) 4 AA 8596 Non-stop Airbus A320 (320) 3:10 Effective 2026-02-24 through 2026-02-28 代码共享航班,由Iberia负责飞行。(IB 798) |
| 每日
07:05
Vienna (VIE) 1
10:15
Madrid (MAD) 4 AA 8596 Non-stop Airbus A319 (319) 3:10 Effective 2026-03-03 through 2026-03-25 代码共享航班,由Iberia负责飞行。(IB 798) |
| 四
07:05
Vienna (VIE) 1
10:15
Madrid (MAD) 4 AA 8596 Non-stop Airbus A320 (320) 3:10 Operates only on 2026-03-26 代码共享航班,由Iberia负责飞行。(IB 798) |
| 五,六
07:05
Vienna (VIE) 1
10:15
Madrid (MAD) 4 AA 8596 Non-stop Airbus A319 (319) 3:10 Effective 2026-03-27 through 2026-03-28 代码共享航班,由Iberia负责飞行。(IB 798) |
| 每日
07:05
Vienna (VIE) 1
10:15
Madrid (MAD) 4 AA 8596 Non-stop Airbus A320 (320) 3:10 Effective from 2026-10-25 代码共享航班,由Iberia负责飞行。(IB 798) |