Air New Zealand 航班 NZ 7595: 复合航线

选择出发日期:
航班时刻表
直达(代码共享)航班
二 11:35 Port Hedland (PHE) 13:45 Perth (PER) 4
NZ 7595 Non-stop Fokker 100 (100) 2:10 Valid until 2026-01-06
代码共享航班,由Qantas负责飞行。(QF 1637)
二 14:05 Port Hedland (PHE) 16:15 Perth (PER) 4
NZ 7595 Non-stop Fokker 100 (100) 2:10 Effective 2026-01-27 through 2026-03-24
代码共享航班,由Qantas负责飞行。(QF 1637)
一,三,四 17:15 Brisbane (BNE) D 18:25 Gladstone (GLT)
NZ 7595 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-03-30 through 2026-05-14
代码共享航班,由Qantas负责飞行。(QF 1894)
三,四 17:15 Brisbane (BNE) D 18:25 Gladstone (GLT)
NZ 7595 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-05-20 through 2026-06-11
代码共享航班,由Qantas负责飞行。(QF 1894)
一,三,四 17:15 Brisbane (BNE) D 18:25 Gladstone (GLT)
NZ 7595 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:10 Effective 2026-06-15 through 2026-06-29
代码共享航班,由Qantas负责飞行。(QF 1894)
此航班代码的飞行航线如下:
Air New Zealand 航班 NZ 7595: 复合航线
选择出发日期:
航班时刻表
直达(代码共享)航班

Air New Zealand NZ7595
Valid until 2026-01-06

-


-

-

-

-

-
代码共享航班,由Qantas负责飞行。 (QF 1637)
Duration: 2:10, non-stop
Fokker 100 (100)

直达(代码共享)航班

Air New Zealand NZ7595
Effective 2026-01-27 through 2026-03-24

-


-

-

-

-

-
代码共享航班,由Qantas负责飞行。 (QF 1637)
Duration: 2:10, non-stop
Fokker 100 (100)

直达(代码共享)航班

Air New Zealand NZ7595
Effective 2026-03-30 through 2026-05-14


-



-

-

-
代码共享航班,由Qantas负责飞行。 (QF 1894)
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

直达(代码共享)航班

Air New Zealand NZ7595
Effective 2026-05-20 through 2026-06-11

-

-



-

-

-
代码共享航班,由Qantas负责飞行。 (QF 1894)
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)

直达(代码共享)航班

Air New Zealand NZ7595
Effective 2026-06-15 through 2026-06-29


-



-

-

-
代码共享航班,由Qantas负责飞行。 (QF 1894)
Duration: 1:10, non-stop
Embraer EMB 190 / EMB 195 (E90)
此航班代码的飞行航线如下:
  • Brisbane (BNE) - Gladstone (GLT)
  • Port Hedland (PHE) - Perth (PER)