| 航班时刻表 |
|---|
| 直达航班 |
| 每日
05:35
Hyderabad (HYD)
07:25
Bhubaneshwar (BBI) 1 IX 2807 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2026-02-01 through 2026-03-28 |
| 一,三,五,日
07:55
Bhubaneshwar (BBI) 1
10:15
Jaipur (JAI) 2 IX 2807 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2026-02-01 through 2026-03-27 |
| 二,四,六
07:55
Bhubaneshwar (BBI) 1
09:50
Lucknow (LKO) 3 IX 2807 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2026-02-03 through 2026-03-28 |
| 转机航班 |
| 一,三,五,日
05:35
Hyderabad (HYD)
10:15
Jaipur (JAI) 2 IX 2807 1-stop Boeing 737 MAX 8 (7M8) 4:40 Effective 2026-02-01 through 2026-03-27 |
| 二,四,六
05:35
Hyderabad (HYD)
09:50
Lucknow (LKO) 3 IX 2807 1-stop Boeing 737 MAX 8 (7M8) 4:15 Effective 2026-02-03 through 2026-03-28 |