All airlines flying from Vienna (VIE) to Catania (CTA).

Select flight date:
FLIGHT SCHEDULE
Direct Codeshare Flights:
Wed 14:50 Vienna (VIE) 3 16:50 Catania (CTA)
ITA Airways AZ 7551 Non-stop Embraer EMB 195 (E95) 2:00 Operates only on 2026-06-24
Codeshare flight, operated by Austrian.(OS 579)
Mon,Wed,Fri 14:50 Vienna (VIE) 3 16:50 Catania (CTA)
ITA Airways AZ 7551 Non-stop Airbus A320 (320) 2:00 Effective 2026-09-14 through 2026-09-21
Codeshare flight, operated by Austrian.(OS 579)
Wed 14:50 Vienna (VIE) 3 16:50 Catania (CTA)
ITA Airways AZ 7551 Non-stop Embraer EMB 195 (E95) 2:00 Effective 2026-09-23 through 2026-10-14
Codeshare flight, operated by Austrian.(OS 579)
Mon,Fri 14:50 Vienna (VIE) 3 16:50 Catania (CTA)
ITA Airways AZ 7551 Non-stop Airbus A320 (320) 2:00 Effective 2026-09-25 through 2026-10-19
Codeshare flight, operated by Austrian.(OS 579)
Wed,Fri 14:50 Vienna (VIE) 3 16:50 Catania (CTA)
ITA Airways AZ 7551 Non-stop Airbus A320 (320) 2:00 Effective 2026-10-21 through 2026-10-23
Codeshare flight, operated by Austrian.(OS 579)
Fri 17:30 Vienna (VIE) 3 19:30 Catania (CTA)
ITA Airways AZ 7551 Non-stop Embraer EMB 195 (E95) 2:00 Operates only on 2026-04-03
Codeshare flight, operated by Austrian.(OS 579)
Fri 17:30 Vienna (VIE) 3 19:30 Catania (CTA)
ITA Airways AZ 7551 Non-stop Airbus A320 (320) 2:00 Effective 2026-04-10 through 2026-06-26
Codeshare flight, operated by Austrian.(OS 579)
prev   1 2


All airlines flying from Vienna (VIE) to Catania (CTA).
Select flight date:
FLIGHT SCHEDULE
Direct Codeshare Flights:

14:50

16:50
Operates only on 2026-06-24
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Austrian. (OS 579)
Duration: 2:00, non-stop
Embraer EMB 195 (E95)

Direct Codeshare Flights:

14:50

16:50
Effective 2026-09-14 through 2026-09-21
Mon
Tue
-
Wed
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by Austrian. (OS 579)
Duration: 2:00, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

14:50

16:50
Effective 2026-09-23 through 2026-10-14
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Austrian. (OS 579)
Duration: 2:00, non-stop
Embraer EMB 195 (E95)

Direct Codeshare Flights:

14:50

16:50
Effective 2026-09-25 through 2026-10-19
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by Austrian. (OS 579)
Duration: 2:00, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

14:50

16:50
Effective 2026-10-21 through 2026-10-23
Mon
-
Tue
-
Wed
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by Austrian. (OS 579)
Duration: 2:00, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

17:30

19:30
Operates only on 2026-04-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by Austrian. (OS 579)
Duration: 2:00, non-stop
Embraer EMB 195 (E95)

Direct Codeshare Flights:

17:30

19:30
Effective 2026-04-10 through 2026-06-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by Austrian. (OS 579)
Duration: 2:00, non-stop
Airbus A320 (320)
prev        Page 2 / 2
  • An international route departing from Vienna airport, Austria (VIE) and arriving at Catania airport, Italy (CTA).
  • The flight distance is 739 miles, or 1189 km.
  • The timezone of both the departure and the arrival airports is UTC+1 . Current time at both airports is (loading...).
  • For direct flights, the flight time varies between 2:00 and 2:05.