All airlines flying from Portland (PDX) to Los Angeles (LAX).

Select flight date:
FLIGHT SCHEDULE
Direct Codeshare Flights:
Daily 17:10 Portland (PDX) 19:37 Los Angeles (LAX) 3
LATAM Airlines LA 8634 Non-stop Airbus A319 (319) 2:27 Effective 2026-04-13 through 2026-04-22
Codeshare flight, operated by Delta Air Lines.(DL 2551)
Mon-Wed,Fri-Sun 17:10 Portland (PDX) 19:37 Los Angeles (LAX) 3
LATAM Airlines LA 8634 Non-stop Airbus A319 (319) 2:27 Effective 2026-04-24 through 2026-10-05
Codeshare flight, operated by Delta Air Lines.(DL 2551)
Daily 17:10 Portland (PDX) 19:34 Los Angeles (LAX) 3
LATAM Airlines LA 8634 Non-stop Airbus A319 (319) 2:24 Effective 2026-10-06 through 2026-10-21
Codeshare flight, operated by Delta Air Lines.(DL 2551)
Daily 17:10 Portland (PDX) 19:34 Los Angeles (LAX) 3
LATAM Airlines LA 8634 Non-stop Airbus A319 (319) 2:24 Effective from 2026-10-23
Codeshare flight, operated by Delta Air Lines.(DL 2551)
Mon-Wed,Fri-Sun 13:02 Portland (PDX) 15:25 Los Angeles (LAX) 3
LATAM Airlines LA 8635 Non-stop Airbus A319 (319) 2:23 Effective 2026-01-19 through 2026-02-11
Codeshare flight, operated by Delta Air Lines.(DL 2766)
Mon-Wed,Fri-Sun 13:02 Portland (PDX) 15:23 Los Angeles (LAX) 3
LATAM Airlines LA 8635 Non-stop Airbus A319 (319) 2:21 Effective 2026-02-13 through 2026-03-01
Codeshare flight, operated by Delta Air Lines.(DL 2766)
Fri,Sat 13:02 Portland (PDX) 15:23 Los Angeles (LAX) 3
LATAM Airlines LA 8635 Non-stop Airbus A319 (319) 2:21 Effective 2026-03-06 through 2026-03-07
Codeshare flight, operated by Delta Air Lines.(DL 2766)
Sat 13:09 Portland (PDX) 15:33 Los Angeles (LAX) 3
LATAM Airlines LA 8635 Non-stop Airbus A319 (319) 2:24 Effective 2026-03-14 through 2026-03-28
Codeshare flight, operated by Delta Air Lines.(DL 2766)
Fri,Sat 13:09 Portland (PDX) 15:33 Los Angeles (LAX) 3
LATAM Airlines LA 8635 Non-stop Airbus A319 (319) 2:24 Effective 2026-04-03 through 2026-04-11
Codeshare flight, operated by Delta Air Lines.(DL 2766)
Mon-Wed,Fri-Sun 13:30 Portland (PDX) 15:49 Los Angeles (LAX) 3
LATAM Airlines LA 8635 Non-stop Boeing 737-800 (738) 2:19 Valid until 2026-01-02
Codeshare flight, operated by Delta Air Lines.(DL 2766)
Mon-Wed,Fri-Sun 14:36 Portland (PDX) 17:00 Los Angeles (LAX) 3
LATAM Airlines LA 8635 Non-stop Airbus A319 (319) 2:24 Effective 2026-01-06 through 2026-01-17
Codeshare flight, operated by Delta Air Lines.(DL 2766)
Sun 14:36 Portland (PDX) 16:59 Los Angeles (LAX) 3
LATAM Airlines LA 8635 Non-stop Boeing 737-800 (738) 2:23 Operates only on 2026-01-18
Codeshare flight, operated by Delta Air Lines.(DL 2766)
Mon 14:45 Portland (PDX) 17:09 Los Angeles (LAX) 3
LATAM Airlines LA 8635 Non-stop Airbus A319 (319) 2:24 Operates only on 2026-01-05
Codeshare flight, operated by Delta Air Lines.(DL 2766)
Wed,Thu,Sat,Sun 10:00 Portland (PDX) 12:26 Los Angeles (LAX) 3
LATAM Airlines LA 8757 Non-stop Airbus A319 (319) 2:26 Effective 2026-04-16 through 2026-04-26
Codeshare flight, operated by Delta Air Lines.(DL 2975)
Mon,Wed,Thu,Sat,Sun 10:00 Portland (PDX) 12:26 Los Angeles (LAX) 3
LATAM Airlines LA 8757 Non-stop Airbus A319 (319) 2:26 Effective 2026-04-27 through 2026-06-29
Codeshare flight, operated by Delta Air Lines.(DL 2975)
Mon,Tue,Thu-Sun 10:00 Portland (PDX) 12:26 Los Angeles (LAX) 3
LATAM Airlines LA 8757 Non-stop Airbus A319 (319) 2:26 Effective 2026-07-03 through 2026-10-05
Codeshare flight, operated by Delta Air Lines.(DL 2975)
Mon,Thu,Fri,Sun 10:00 Portland (PDX) 12:26 Los Angeles (LAX) 3
LATAM Airlines LA 8757 Non-stop Airbus A319 (319) 2:26 Effective 2026-10-08 through 2026-10-19
Codeshare flight, operated by Delta Air Lines.(DL 2975)
Mon,Tue,Thu-Sun 10:00 Portland (PDX) 12:26 Los Angeles (LAX) 3
LATAM Airlines LA 8757 Non-stop Airbus A319 (319) 2:26 Effective 2026-10-20 through 2026-10-26
Codeshare flight, operated by Delta Air Lines.(DL 2975)
Thu,Fri 10:00 Portland (PDX) 12:26 Los Angeles (LAX) 3
LATAM Airlines LA 8757 Non-stop Airbus A319 (319) 2:26 Effective from 2026-10-29
Codeshare flight, operated by Delta Air Lines.(DL 2975)
Daily 10:58 Portland (PDX) 13:23 Los Angeles (LAX) 3
LATAM Airlines LA 8757 Non-stop Airbus A319 (319) 2:25 Effective 2026-03-08 through 2026-03-30
Codeshare flight, operated by Delta Air Lines.(DL 2975)
Mon,Wed,Thu,Sat,Sun 10:58 Portland (PDX) 13:23 Los Angeles (LAX) 3
LATAM Airlines LA 8757 Non-stop Airbus A319 (319) 2:25 Effective 2026-04-01 through 2026-04-06
Codeshare flight, operated by Delta Air Lines.(DL 2975)
Thu,Sat,Sun 10:58 Portland (PDX) 13:23 Los Angeles (LAX) 3
LATAM Airlines LA 8757 Non-stop Airbus A319 (319) 2:25 Effective 2026-04-09 through 2026-04-12
Codeshare flight, operated by Delta Air Lines.(DL 2975)
Daily 06:00 Portland (PDX) 08:33 Los Angeles (LAX) 3
China Eastern MU 8798 Non-stop Airbus A319 (319) 2:33 Valid until 2026-01-04
Codeshare flight, operated by Delta Air Lines.(DL 2947)
Daily 06:15 Portland (PDX) 08:46 Los Angeles (LAX) 3
China Eastern MU 8798 Non-stop Airbus A319 (319) 2:31 Effective 2026-03-08 through 2026-04-12
Codeshare flight, operated by Delta Air Lines.(DL 2947)
Daily 06:25 Portland (PDX) 08:55 Los Angeles (LAX) 3
China Eastern MU 8798 Non-stop Airbus A319 (319) 2:30 Effective 2026-01-20 through 2026-02-11
Codeshare flight, operated by Delta Air Lines.(DL 2947)
Daily 06:25 Portland (PDX) 08:51 Los Angeles (LAX) 3
China Eastern MU 8798 Non-stop Airbus A319 (319) 2:26 Effective 2026-02-12 through 2026-03-07
Codeshare flight, operated by Delta Air Lines.(DL 2947)
Daily 06:30 Portland (PDX) 09:00 Los Angeles (LAX) 3
China Eastern MU 8798 Non-stop Airbus A319 (319) 2:30 Effective 2026-01-05 through 2026-01-19
Codeshare flight, operated by Delta Air Lines.(DL 2947)
Daily 06:30 Portland (PDX) 08:57 Los Angeles (LAX) 3
China Eastern MU 8798 Non-stop Boeing 737-800 (738) 2:27 Effective from 2026-04-13
Codeshare flight, operated by Delta Air Lines.(DL 2947)
Daily 21:30 Portland (PDX) 23:56 Los Angeles (LAX) 6
Qatar Airways QR 8828 Non-stop Boeing 737 (73J) 2:26 Effective 2026-05-13 through 2026-06-09
Codeshare flight, operated by Alaska Airlines.(AS 777)
Tue 13:09 Portland (PDX) 15:33 Los Angeles (LAX) 3
LATAM Airlines LA 8967 Non-stop Airbus A319 (319) 2:24 Operates only on 2026-04-07
Codeshare flight, operated by Delta Air Lines.(DL 2766)
Sun 13:09 Portland (PDX) 15:33 Los Angeles (LAX) 3
LATAM Airlines LA 8983 Non-stop Airbus A319 (319) 2:24 Effective 2026-04-05 through 2026-04-12
Codeshare flight, operated by Delta Air Lines.(DL 2766)
Sun 13:09 Portland (PDX) 15:33 Los Angeles (LAX) 3
LATAM Airlines LA 8992 Non-stop Airbus A319 (319) 2:24 Effective 2026-03-15 through 2026-03-22
Codeshare flight, operated by Delta Air Lines.(DL 2766)
Mon 13:09 Portland (PDX) 15:33 Los Angeles (LAX) 3
LATAM Airlines LA 8993 Non-stop Airbus A319 (319) 2:24 Operates only on 2026-04-06
Codeshare flight, operated by Delta Air Lines.(DL 2766)
Mon,Fri 06:01 Portland (PDX) 08:36 Los Angeles (LAX)
Qatar Airways QR 9418 Non-stop Canadair CRJ 700 (CR7) 2:35 Effective 2026-01-09 through 2026-02-09
Codeshare flight, operated by American Airlines.(AA 6290)
Daily 06:25 Portland (PDX) 09:05 Los Angeles (LAX)
Qatar Airways QR 9418 Non-stop Canadair CRJ 700 (CR7) 2:40 Effective 2026-03-08 through 2026-04-06
Codeshare flight, operated by American Airlines.(AA 6290)
Mon,Thu-Sun 06:40 Portland (PDX) 09:25 Los Angeles (LAX)
Qatar Airways QR 9418 Non-stop Canadair CRJ 700 (CR7) 2:45 Effective 2026-02-13 through 2026-03-07
Codeshare flight, operated by American Airlines.(AA 6290)
Daily 06:46 Portland (PDX) 09:20 Los Angeles (LAX)
Qatar Airways QR 9418 Non-stop Embraer EMB 175 (E75) 2:34 Effective 2026-04-07 through 2026-05-20
Codeshare flight, operated by American Airlines.(AA 6290)
Tue,Wed 07:00 Portland (PDX) 09:45 Los Angeles (LAX)
Qatar Airways QR 9418 Non-stop Canadair CRJ 700 (CR7) 2:45 Effective 2026-02-17 through 2026-03-04
Codeshare flight, operated by American Airlines.(AA 6290)
Daily 07:40 Portland (PDX) 10:16 Los Angeles (LAX)
Qatar Airways QR 9418 Non-stop Canadair CRJ 700 (CR7) 2:36 Effective 2026-08-05 through 2026-09-08
Codeshare flight, operated by American Airlines.(AA 6290)
Daily 07:40 Portland (PDX) 10:14 Los Angeles (LAX)
Qatar Airways QR 9418 Non-stop Canadair CRJ 700 (CR7) 2:34 Effective from 2026-10-05
Codeshare flight, operated by American Airlines.(AA 6290)
Daily 07:45 Portland (PDX) 10:18 Los Angeles (LAX)
Qatar Airways QR 9418 Non-stop Canadair CRJ 700 (CR7) 2:33 Effective 2026-07-02 through 2026-08-04
Codeshare flight, operated by American Airlines.(AA 6290)
Daily 07:55 Portland (PDX) 10:28 Los Angeles (LAX)
Qatar Airways QR 9418 Non-stop Canadair CRJ 700 (CR7) 2:33 Effective 2026-05-21 through 2026-07-01
Codeshare flight, operated by American Airlines.(AA 6290)
Daily 08:00 Portland (PDX) 10:38 Los Angeles (LAX)
Qatar Airways QR 9418 Non-stop Canadair CRJ 700 (CR7) 2:38 Effective 2026-09-09 through 2026-10-04
Codeshare flight, operated by American Airlines.(AA 6290)
prev   1 2 3 ... 22 23 24 25


All airlines flying from Portland (PDX) to Los Angeles (LAX).
Select flight date:
FLIGHT SCHEDULE
Direct Codeshare Flights:

Effective 2026-04-13 through 2026-04-22
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2551)
Duration: 2:27, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-04-24 through 2026-10-05
Mon
Tue
Wed
Thu
-
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2551)
Duration: 2:27, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-10-06 through 2026-10-21
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2551)
Duration: 2:24, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective from 2026-10-23
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2551)
Duration: 2:24, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-01-19 through 2026-02-11
Mon
Tue
Wed
Thu
-
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2766)
Duration: 2:23, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-02-13 through 2026-03-01
Mon
Tue
Wed
Thu
-
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2766)
Duration: 2:21, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-03-06 through 2026-03-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 2766)
Duration: 2:21, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-03-14 through 2026-03-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 2766)
Duration: 2:24, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-04-03 through 2026-04-11
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 2766)
Duration: 2:24, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Valid until 2026-01-02
Mon
Tue
Wed
Thu
-
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2766)
Duration: 2:19, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective 2026-01-06 through 2026-01-17
Mon
Tue
Wed
Thu
-
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2766)
Duration: 2:24, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Operates only on 2026-01-18
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2766)
Duration: 2:23, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Operates only on 2026-01-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 2766)
Duration: 2:24, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-04-16 through 2026-04-26
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2975)
Duration: 2:26, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-04-27 through 2026-06-29
Mon
Tue
-
Wed
Thu
Fri
-
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2975)
Duration: 2:26, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-07-03 through 2026-10-05
Mon
Tue
Wed
-
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2975)
Duration: 2:26, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-10-08 through 2026-10-19
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2975)
Duration: 2:26, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-10-20 through 2026-10-26
Mon
Tue
Wed
-
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2975)
Duration: 2:26, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective from 2026-10-29
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 2975)
Duration: 2:26, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-03-08 through 2026-03-30
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2975)
Duration: 2:25, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-04-01 through 2026-04-06
Mon
Tue
-
Wed
Thu
Fri
-
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2975)
Duration: 2:25, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-04-09 through 2026-04-12
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2975)
Duration: 2:25, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Valid until 2026-01-04
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2947)
Duration: 2:33, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-03-08 through 2026-04-12
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2947)
Duration: 2:31, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-01-20 through 2026-02-11
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2947)
Duration: 2:30, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-02-12 through 2026-03-07
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2947)
Duration: 2:26, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-01-05 through 2026-01-19
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2947)
Duration: 2:30, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective from 2026-04-13
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2947)
Duration: 2:27, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective 2026-05-13 through 2026-06-09
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Alaska Airlines. (AS 777)
Duration: 2:26, non-stop
Boeing 737 (73J)

Direct Codeshare Flights:

Operates only on 2026-04-07
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 2766)
Duration: 2:24, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-04-05 through 2026-04-12
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2766)
Duration: 2:24, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-03-15 through 2026-03-22
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Delta Air Lines. (DL 2766)
Duration: 2:24, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Operates only on 2026-04-06
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 2766)
Duration: 2:24, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective 2026-01-09 through 2026-02-09
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by American Airlines. (AA 6290)
Duration: 2:35, non-stop
Canadair CRJ 700 (CR7)

Direct Codeshare Flights:

Effective 2026-03-08 through 2026-04-06
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by American Airlines. (AA 6290)
Duration: 2:40, non-stop
Canadair CRJ 700 (CR7)

Direct Codeshare Flights:

Effective 2026-02-13 through 2026-03-07
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Codeshare flight, operated by American Airlines. (AA 6290)
Duration: 2:45, non-stop
Canadair CRJ 700 (CR7)

Direct Codeshare Flights:

Effective 2026-04-07 through 2026-05-20
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by American Airlines. (AA 6290)
Duration: 2:34, non-stop
Embraer EMB 175 (E75)

Direct Codeshare Flights:

Effective 2026-02-17 through 2026-03-04
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by American Airlines. (AA 6290)
Duration: 2:45, non-stop
Canadair CRJ 700 (CR7)

Direct Codeshare Flights:

Effective 2026-08-05 through 2026-09-08
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by American Airlines. (AA 6290)
Duration: 2:36, non-stop
Canadair CRJ 700 (CR7)

Direct Codeshare Flights:

Effective from 2026-10-05
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by American Airlines. (AA 6290)
Duration: 2:34, non-stop
Canadair CRJ 700 (CR7)

Direct Codeshare Flights:

Effective 2026-07-02 through 2026-08-04
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by American Airlines. (AA 6290)
Duration: 2:33, non-stop
Canadair CRJ 700 (CR7)

Direct Codeshare Flights:

Effective 2026-05-21 through 2026-07-01
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by American Airlines. (AA 6290)
Duration: 2:33, non-stop
Canadair CRJ 700 (CR7)

Direct Codeshare Flights:

Effective 2026-09-09 through 2026-10-04
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by American Airlines. (AA 6290)
Duration: 2:38, non-stop
Canadair CRJ 700 (CR7)
prev        Page 25 / 25
  • A domestic route departing from the Portland airport (PDX) and arriving at Los Angeles airport (LAX).
  • The flight distance is 834 miles, or 1342 km.
  • The timezone of both the departure and the arrival airports is UTC-8 . Current time at both airports is (loading...).
  • For direct flights, the flight time varies between 2:19 and 2:45.