| FLIGHT SCHEDULE |
|---|
| Direct Flights: |
| Tue
21:00
Madrid (MAD) 4S
03:00
Cochabamba (CBB) BoA OB 779 Non-stop Airbus A330-200 (332) 11:00 Valid until 2026-03-24 The flight arrives 1 day after departure. |
| Tue
21:00
Madrid (MAD) 4S
02:30
Cochabamba (CBB) BoA OB 779 Non-stop Airbus A330-200 (332) 11:30 Effective 2026-03-31 through 2026-10-20 The flight arrives 1 day after departure. |
| Tue
21:00
Madrid (MAD) 4S
02:30
Cochabamba (CBB) BoA OB 779 Non-stop Airbus A330-200 (332) 10:30 Effective from 2026-10-27 The flight arrives 1 day after departure. |
| Direct Codeshare Flights: |
| Tue
21:00
Madrid (MAD) 4S
03:00
Cochabamba (CBB) Iberia IB 7796 Non-stop Airbus A330-200 (332) 11:00 Valid until 2026-03-24 Codeshare flight, operated by BoA.(OB 779) The flight arrives 1 day after departure. |
| Tue
21:00
Madrid (MAD) 4S
02:30
Cochabamba (CBB) Iberia IB 7796 Non-stop Airbus A330-200 (332) 11:30 Effective 2026-03-31 through 2026-10-20 Codeshare flight, operated by BoA.(OB 779) The flight arrives 1 day after departure. |
| Tue
21:00
Madrid (MAD) 4S
02:30
Cochabamba (CBB) Iberia IB 7796 Non-stop Airbus A330-200 (332) 10:30 Effective from 2026-10-27 Codeshare flight, operated by BoA.(OB 779) The flight arrives 1 day after departure. |