All airlines flying from Lima (LIM) to Montevideo (MVD).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Mon-Sat 00:10 Lima (LIM) 06:45 Montevideo (MVD)
LATAM Airlines LA 2420 Non-stop Airbus A320 (320) 4:35 Effective 2026-03-04 through 2026-03-13
Tue,Wed,Sat,Sun 00:10 Lima (LIM) 06:45 Montevideo (MVD)
LATAM Airlines LA 2420 Non-stop Airbus A319 (319) 4:35 Effective 2026-03-14 through 2026-03-18
Mon,Thu-Sun 00:10 Lima (LIM) 06:45 Montevideo (MVD)
LATAM Airlines LA 2420 Non-stop Airbus A320 (320) 4:35 Effective 2026-03-16 through 2026-03-23
Tue,Fri,Sat 00:10 Lima (LIM) 06:45 Montevideo (MVD)
LATAM Airlines LA 2420 Non-stop Airbus A319 (319) 4:35 Effective 2026-03-24 through 2026-03-28
Wed,Thu 00:10 Lima (LIM) 06:45 Montevideo (MVD)
LATAM Airlines LA 2420 Non-stop Airbus A320 (320) 4:35 Effective 2026-03-25 through 2026-03-26
Mon,Fri,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective 2026-03-29 through 2026-04-06
Fri 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A319 (319) 4:30 Operates only on 2026-04-10
Mon,Fri,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective 2026-04-12 through 2026-04-17
Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A319 (319) 4:30 Operates only on 2026-04-19
Mon,Fri,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective 2026-04-20 through 2026-05-04
Fri 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A319 (319) 4:30 Operates only on 2026-05-08
Mon,Fri,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective 2026-05-10 through 2026-05-15
Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A319 (319) 4:30 Operates only on 2026-05-17
Mon,Fri,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective 2026-05-18 through 2026-05-25
Fri 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A319 (319) 4:30 Operates only on 2026-05-29
Mon,Fri,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective 2026-05-31 through 2026-06-08
Fri,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A319 (319) 4:30 Effective 2026-06-12 through 2026-06-19
Mon,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective 2026-06-15 through 2026-06-29
Fri 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A319 (319) 4:30 Operates only on 2026-06-26
Mon,Fri,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective 2026-07-03 through 2026-07-06
Fri,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A319 (319) 4:30 Effective 2026-07-10 through 2026-07-12
Mon,Fri,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective 2026-07-13 through 2026-07-20
Fri 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A319 (319) 4:30 Effective 2026-07-24 through 2026-07-31
Mon,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective 2026-07-26 through 2026-08-03
Mon,Fri 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective 2026-08-07 through 2026-08-14
Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A319 (319) 4:30 Operates only on 2026-08-09
Mon,Fri,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective 2026-08-16 through 2026-09-04
Fri,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A319 (319) 4:30 Effective 2026-09-06 through 2026-09-11
Mon,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective 2026-09-07 through 2026-09-14
Mon,Fri,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective 2026-09-18 through 2026-10-02
Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A319 (319) 4:30 Operates only on 2026-10-04
Mon,Fri,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective 2026-10-05 through 2026-10-12
Fri 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A319 (319) 4:30 Effective 2026-10-16 through 2026-10-23
Mon,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective 2026-10-18 through 2026-10-25
Mon 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A319 (319) 4:30 Effective from 2026-10-26
Fri,Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
LATAM Airlines LA 2442 Non-stop Airbus A320 (320) 4:30 Effective from 2026-10-30
Direct Codeshare Flights:
Mon,Wed 00:10 Lima (LIM) 06:45 Montevideo (MVD)
Delta Air Lines DL 6163 Non-stop Airbus A320 (320) 4:35 Effective 2026-02-16 through 2026-02-18
Codeshare flight, operated by LATAM Airlines.(LA 2420)
Wed 00:10 Lima (LIM) 06:45 Montevideo (MVD)
Delta Air Lines DL 6165 Non-stop Airbus A320 (320) 4:35 Operates only on 2026-03-04
Codeshare flight, operated by LATAM Airlines.(LA 2420)
Thu 00:10 Lima (LIM) 06:45 Montevideo (MVD)
Delta Air Lines DL 6171 Non-stop Airbus A319 (319) 4:35 Operates only on 2026-02-19
Codeshare flight, operated by LATAM Airlines.(LA 2420)
Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
Delta Air Lines DL 6180 Non-stop Airbus A320 (320) 4:30 Operates only on 2026-03-29
Codeshare flight, operated by LATAM Airlines.(LA 2442)
Thu 00:10 Lima (LIM) 06:45 Montevideo (MVD)
Delta Air Lines DL 6185 Non-stop Airbus A320 (320) 4:35 Operates only on 2026-02-26
Codeshare flight, operated by LATAM Airlines.(LA 2420)
Mon 00:10 Lima (LIM) 06:45 Montevideo (MVD)
Delta Air Lines DL 6195 Non-stop Airbus A320 (320) 4:35 Operates only on 2026-01-26
Codeshare flight, operated by LATAM Airlines.(LA 2420)
Mon 00:10 Lima (LIM) 06:45 Montevideo (MVD)
Delta Air Lines DL 6208 Non-stop Airbus A320 (320) 4:35 Operates only on 2026-03-02
Codeshare flight, operated by LATAM Airlines.(LA 2420)
Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
Delta Air Lines DL 6211 Non-stop Airbus A319 (319) 4:30 Operates only on 2026-04-19
Codeshare flight, operated by LATAM Airlines.(LA 2442)
Mon 09:30 Lima (LIM) 16:00 Montevideo (MVD)
Delta Air Lines DL 6216 Non-stop Airbus A319 (319) 4:30 Effective from 2026-10-26
Codeshare flight, operated by LATAM Airlines.(LA 2442)
Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
Delta Air Lines DL 6225 Non-stop Airbus A320 (320) 4:30 Operates only on 2026-04-26
Codeshare flight, operated by LATAM Airlines.(LA 2442)
Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
Delta Air Lines DL 6227 Non-stop Airbus A320 (320) 4:30 Operates only on 2026-04-12
Codeshare flight, operated by LATAM Airlines.(LA 2442)
Wed 00:10 Lima (LIM) 06:45 Montevideo (MVD)
Delta Air Lines DL 6228 Non-stop Airbus A320 (320) 4:35 Operates only on 2026-02-11
Codeshare flight, operated by LATAM Airlines.(LA 2420)
Sun 09:30 Lima (LIM) 16:00 Montevideo (MVD)
Delta Air Lines DL 6231 Non-stop Airbus A320 (320) 4:30 Operates only on 2026-04-05
Codeshare flight, operated by LATAM Airlines.(LA 2442)
Fri 09:30 Lima (LIM) 16:00 Montevideo (MVD)
Delta Air Lines DL 6231 Non-stop Airbus A320 (320) 4:30 Operates only on 2026-04-24
Codeshare flight, operated by LATAM Airlines.(LA 2442)
prev   1 2 3 4 5 6   next


All airlines flying from Lima (LIM) to Montevideo (MVD).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Effective 2026-03-04 through 2026-03-13
Mon
Tue
Wed
Thu
Fri
Sat
Sun
-
Duration: 4:35, non-stop
Airbus A320 (320)

Direct Flights:

Effective 2026-03-14 through 2026-03-18
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
Sun
Duration: 4:35, non-stop
Airbus A319 (319)

Direct Flights:

Effective 2026-03-16 through 2026-03-23
Mon
Tue
-
Wed
-
Thu
Fri
Sat
Sun
Duration: 4:35, non-stop
Airbus A320 (320)

Direct Flights:

Effective 2026-03-24 through 2026-03-28
Mon
-
Tue
Wed
-
Thu
-
Fri
Sat
Sun
-
Duration: 4:35, non-stop
Airbus A319 (319)

Direct Flights:

Effective 2026-03-25 through 2026-03-26
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 4:35, non-stop
Airbus A320 (320)

Direct Flights:

Effective 2026-03-29 through 2026-04-06
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Flights:

Operates only on 2026-04-10
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:30, non-stop
Airbus A319 (319)

Direct Flights:

Effective 2026-04-12 through 2026-04-17
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Flights:

Operates only on 2026-04-19
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A319 (319)

Direct Flights:

Effective 2026-04-20 through 2026-05-04
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Flights:

Operates only on 2026-05-08
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:30, non-stop
Airbus A319 (319)

Direct Flights:

Effective 2026-05-10 through 2026-05-15
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Flights:

Operates only on 2026-05-17
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A319 (319)

Direct Flights:

Effective 2026-05-18 through 2026-05-25
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Flights:

Operates only on 2026-05-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:30, non-stop
Airbus A319 (319)

Direct Flights:

Effective 2026-05-31 through 2026-06-08
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Flights:

Effective 2026-06-12 through 2026-06-19
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A319 (319)

Direct Flights:

Effective 2026-06-15 through 2026-06-29
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Flights:

Operates only on 2026-06-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:30, non-stop
Airbus A319 (319)

Direct Flights:

Effective 2026-07-03 through 2026-07-06
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Flights:

Effective 2026-07-10 through 2026-07-12
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A319 (319)

Direct Flights:

Effective 2026-07-13 through 2026-07-20
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Flights:

Effective 2026-07-24 through 2026-07-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:30, non-stop
Airbus A319 (319)

Direct Flights:

Effective 2026-07-26 through 2026-08-03
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Flights:

Effective 2026-08-07 through 2026-08-14
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Flights:

Operates only on 2026-08-09
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A319 (319)

Direct Flights:

Effective 2026-08-16 through 2026-09-04
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Flights:

Effective 2026-09-06 through 2026-09-11
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A319 (319)

Direct Flights:

Effective 2026-09-07 through 2026-09-14
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Flights:

Effective 2026-09-18 through 2026-10-02
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Flights:

Operates only on 2026-10-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A319 (319)

Direct Flights:

Effective 2026-10-05 through 2026-10-12
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Flights:

Effective 2026-10-16 through 2026-10-23
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:30, non-stop
Airbus A319 (319)

Direct Flights:

Effective 2026-10-18 through 2026-10-25
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Flights:

Effective from 2026-10-26
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:30, non-stop
Airbus A319 (319)

Direct Flights:

Effective from 2026-10-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

Effective 2026-02-16 through 2026-02-18
Mon
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2420)
Duration: 4:35, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

Operates only on 2026-03-04
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2420)
Duration: 4:35, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

Operates only on 2026-02-19
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2420)
Duration: 4:35, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Operates only on 2026-03-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2442)
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

Operates only on 2026-02-26
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2420)
Duration: 4:35, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

Operates only on 2026-01-26
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2420)
Duration: 4:35, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

Operates only on 2026-03-02
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2420)
Duration: 4:35, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

Operates only on 2026-04-19
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2442)
Duration: 4:30, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Effective from 2026-10-26
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2442)
Duration: 4:30, non-stop
Airbus A319 (319)

Direct Codeshare Flights:

Operates only on 2026-04-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2442)
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

Operates only on 2026-04-12
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2442)
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

Operates only on 2026-02-11
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2420)
Duration: 4:35, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

Operates only on 2026-04-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by LATAM Airlines. (LA 2442)
Duration: 4:30, non-stop
Airbus A320 (320)

Direct Codeshare Flights:

Operates only on 2026-04-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by LATAM Airlines. (LA 2442)
Duration: 4:30, non-stop
Airbus A320 (320)
prev        Page 2 / 6        next
  • An international route departing from Lima airport, Peru (LIM) and arriving at Montevideo airport, Uruguay (MVD).
  • The flight distance is 2056 miles, or 3308 km.
  • The timezone of the departure airport is UTC-5 , and the timezone of the arrival airport is UTC-3 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 4:30 and 4:35.