All airlines flying from Baku (GYD) to Mumbai Chhatrapati Shivaji (BOM).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Tue,Thu,Sat 19:10 Baku (GYD) 1 01:10 Mumbai Chhatrapati Shivaji (BOM) 2
Azerbaijan Airlines J2 59 Non-stop Airbus A320 (320) 4:30 Valid until 2026-03-28
The flight arrives 1 day after departure.
Tue,Thu,Sat 19:30 Baku (GYD) 1 01:25 Mumbai Chhatrapati Shivaji (BOM) 2
Azerbaijan Airlines J2 59 Non-stop Airbus A320 (320) 4:25 Effective from 2026-03-31
The flight arrives 1 day after departure.
Mon,Fri,Sun 21:00 Baku (GYD) 1 03:00 Mumbai Chhatrapati Shivaji (BOM) 2
Azerbaijan Airlines J2 59 Non-stop Airbus A320 (320) 4:30 Valid until 2026-01-05
The flight arrives 1 day after departure.
Mon,Wed,Fri,Sun 21:00 Baku (GYD) 1 03:00 Mumbai Chhatrapati Shivaji (BOM) 2
Azerbaijan Airlines J2 59 Non-stop Airbus A320 (320) 4:30 Effective 2026-01-07 through 2026-03-27
The flight arrives 1 day after departure.
Mon,Wed,Fri,Sun 21:10 Baku (GYD) 1 03:05 Mumbai Chhatrapati Shivaji (BOM) 2
Azerbaijan Airlines J2 59 Non-stop Airbus A320 (320) 4:25 Effective from 2026-03-29
The flight arrives 1 day after departure.
Thu 05:00 Baku (GYD) 10:36 Mumbai Chhatrapati Shivaji (BOM)
Silk Way West Airlines 7L 3319 Non-stop Boeing 747 Freighter (74F) 4:06
This is a Scheduled Cargo flight.
Sat 09:00 Baku (GYD) 14:32 Mumbai Chhatrapati Shivaji (BOM)
Silk Way West Airlines 7L 3321 Non-stop Boeing 747 Freighter (74F) 4:02
This is a Scheduled Cargo flight.


All airlines flying from Baku (GYD) to Mumbai Chhatrapati Shivaji (BOM).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Valid until 2026-03-28
Mon
-
Tue
Wed
-
Thu
Fri
-
Sat
Sun
-
Duration: 4:30, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Direct Flights:

Effective from 2026-03-31
Mon
-
Tue
Wed
-
Thu
Fri
-
Sat
Sun
-
Duration: 4:25, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Direct Flights:

Valid until 2026-01-05
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Direct Flights:

Effective 2026-01-07 through 2026-03-27
Mon
Tue
-
Wed
Thu
-
Fri
Sat
-
Sun
Duration: 4:30, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Direct Flights:

Effective from 2026-03-29
Mon
Tue
-
Wed
Thu
-
Fri
Sat
-
Sun
Duration: 4:25, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Direct Flights:

This is a Scheduled Cargo flight.
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 4:06, non-stop
Boeing 747 Freighter (74F)

Direct Flights:

This is a Scheduled Cargo flight.
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:02, non-stop
Boeing 747 Freighter (74F)
  • An international route departing from Baku airport, Azerbaijan (GYD) and arriving at Mumbai Chhatrapati Shivaji airport, India (BOM).
  • The flight distance is 1999 miles, or 3217 km.
  • The timezone of the departure airport is UTC+4 , and the timezone of the arrival airport is UTC+5.5 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 4:02 and 4:30.