Southwest Airlines flights from Las Vegas Harry Reid (LAS) to Chicago Midway (MDW).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Sun 19:20 Las Vegas Harry Reid (LAS) 1 00:50 Chicago Midway (MDW)
Southwest Airlines WN 3200 Non-stop Boeing 737-800 (73H) 3:30 Effective 2026-06-07 through 2026-08-02
The flight arrives 1 day after departure.
Mon,Thu,Fri 19:55 Las Vegas Harry Reid (LAS) 1 01:25 Chicago Midway (MDW)
Southwest Airlines WN 3200 Non-stop Boeing 737 MAX 8 (7M8) 3:30 Effective 2026-06-04 through 2026-08-03
The flight arrives 1 day after departure.
Mon,Tue,Fri,Sun 05:15 Las Vegas Harry Reid (LAS) 1 10:40 Chicago Midway (MDW)
Southwest Airlines WN 3204 Non-stop Boeing 737 MAX 8 (7M8) 3:25 Valid until 2026-01-04
Sat 05:45 Las Vegas Harry Reid (LAS) 1 11:10 Chicago Midway (MDW)
Southwest Airlines WN 3204 Non-stop Boeing 737-800 (73H) 3:25 Valid until 2026-01-03
Mon,Tue,Fri,Sun 06:50 Las Vegas Harry Reid (LAS) 1 12:15 Chicago Midway (MDW)
Southwest Airlines WN 3206 Non-stop Boeing 737 MAX 8 (7M8) 3:25 Valid until 2026-01-04
Sat 08:10 Las Vegas Harry Reid (LAS) 1 13:40 Chicago Midway (MDW)
Southwest Airlines WN 3206 Non-stop Boeing 737-800 (73H) 3:30 Valid until 2026-01-03
Mon 18:50 Las Vegas Harry Reid (LAS) 1 00:20 Chicago Midway (MDW)
Southwest Airlines WN 3211 Non-stop Boeing 737 MAX 8 (7M8) 3:30 Operates only on 2026-01-05
The flight arrives 1 day after departure.
Daily 23:40 Las Vegas Harry Reid (LAS) 1 05:05 Chicago Midway (MDW)
Southwest Airlines WN 3212 Non-stop Boeing 737 MAX 8 (7M8) 3:25 Valid until 2026-01-05
The flight arrives 1 day after departure.
Tue,Wed 16:25 Las Vegas Harry Reid (LAS) 1 22:00 Chicago Midway (MDW)
Southwest Airlines WN 3464 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2026-04-07 through 2026-06-03
Sat 17:35 Las Vegas Harry Reid (LAS) 1 23:05 Chicago Midway (MDW)
Southwest Airlines WN 3464 Non-stop Boeing 737-800 (73H) 3:30 Effective 2026-04-11 through 2026-05-30
Mon,Thu,Fri 18:20 Las Vegas Harry Reid (LAS) 1 23:55 Chicago Midway (MDW)
Southwest Airlines WN 3464 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2026-04-09 through 2026-06-01
Sun 19:20 Las Vegas Harry Reid (LAS) 1 00:55 Chicago Midway (MDW)
Southwest Airlines WN 3464 Non-stop Boeing 737-700 (Scimitar Winglets) 3:35 Operates only on 2026-05-24
The flight arrives 1 day after departure.
Sun 20:25 Las Vegas Harry Reid (LAS) 1 01:55 Chicago Midway (MDW)
Southwest Airlines WN 3464 Non-stop Boeing 737-800 (73H) 3:30 Effective 2026-04-12 through 2026-05-17
The flight arrives 1 day after departure.
Sun 20:25 Las Vegas Harry Reid (LAS) 1 01:55 Chicago Midway (MDW)
Southwest Airlines WN 3464 Non-stop Boeing 737-800 (73H) 3:30 Operates only on 2026-05-31
The flight arrives 1 day after departure.
Tue,Wed 11:35 Las Vegas Harry Reid (LAS) 1 17:05 Chicago Midway (MDW)
Southwest Airlines WN 3587 Non-stop Boeing 737-800 (73H) 3:30 Effective 2026-03-10 through 2026-04-01
Mon,Thu,Fri 12:00 Las Vegas Harry Reid (LAS) 1 17:35 Chicago Midway (MDW)
Southwest Airlines WN 3587 Non-stop Boeing 737-800 (73H) 3:35 Effective 2026-03-05 through 2026-04-06
Sat 12:25 Las Vegas Harry Reid (LAS) 1 18:00 Chicago Midway (MDW)
Southwest Airlines WN 3587 Non-stop Boeing 737-800 (73H) 3:35 Effective 2026-03-07 through 2026-04-04
Mon,Thu,Fri 18:10 Las Vegas Harry Reid (LAS) 1 23:40 Chicago Midway (MDW)
Southwest Airlines WN 3590 Non-stop Boeing 737-800 (73H) 3:30 Effective 2026-03-05 through 2026-04-06
Sun 18:25 Las Vegas Harry Reid (LAS) 1 23:55 Chicago Midway (MDW)
Southwest Airlines WN 3590 Non-stop Boeing 737-800 (73H) 3:30 Effective 2026-03-08 through 2026-04-05
Sat 18:40 Las Vegas Harry Reid (LAS) 1 00:10 Chicago Midway (MDW)
Southwest Airlines WN 3590 Non-stop Boeing 737 MAX 8 (7M8) 3:30 Effective 2026-03-07 through 2026-04-04
The flight arrives 1 day after departure.
Thu,Fri 23:55 Las Vegas Harry Reid (LAS) 1 05:20 Chicago Midway (MDW)
Southwest Airlines WN 3591 Non-stop Boeing 737-800 (73H) 3:25 Effective 2026-03-05 through 2026-03-06
The flight arrives 1 day after departure.
Daily 23:55 Las Vegas Harry Reid (LAS) 1 05:20 Chicago Midway (MDW)
Southwest Airlines WN 3591 Non-stop Boeing 737-800 (73H) 3:25 Effective 2026-03-08 through 2026-04-06
The flight arrives 1 day after departure.
Mon,Thu,Fri 05:35 Las Vegas Harry Reid (LAS) 1 11:00 Chicago Midway (MDW)
Southwest Airlines WN 3805 Non-stop Boeing 737 MAX 8 (7M8) 3:25 Effective 2026-03-05 through 2026-04-06
Sat 05:35 Las Vegas Harry Reid (LAS) 1 11:00 Chicago Midway (MDW)
Southwest Airlines WN 3805 Non-stop Boeing 737-800 (73H) 3:25 Effective 2026-03-07 through 2026-04-04
Sun 05:00 Las Vegas Harry Reid (LAS) 1 10:30 Chicago Midway (MDW)
Southwest Airlines WN 3916 Non-stop Boeing 737 MAX 8 (7M8) 3:30 Effective 2026-06-07 through 2026-08-02
Mon,Thu,Fri 11:40 Las Vegas Harry Reid (LAS) 1 17:15 Chicago Midway (MDW)
Southwest Airlines WN 3982 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2026-08-06 through 2026-09-28
Sat 11:55 Las Vegas Harry Reid (LAS) 1 17:30 Chicago Midway (MDW)
Southwest Airlines WN 4001 Non-stop Boeing 737-700 (Scimitar Winglets) 3:35 Effective 2026-04-11 through 2026-05-30
Sun 12:05 Las Vegas Harry Reid (LAS) 1 17:40 Chicago Midway (MDW)
Southwest Airlines WN 4249 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2026-06-07 through 2026-08-02
Sat 11:50 Las Vegas Harry Reid (LAS) 1 17:20 Chicago Midway (MDW)
Southwest Airlines WN 4270 Non-stop Boeing 737 MAX 8 (7M8) 3:30 Effective 2026-02-14 through 2026-02-28
Mon-Fri 13:30 Las Vegas Harry Reid (LAS) 1 19:00 Chicago Midway (MDW)
Southwest Airlines WN 4270 Non-stop Boeing 737-700 (Scimitar Winglets) 3:30 Effective 2026-01-06 through 2026-01-14
Tue-Fri,Sun 13:30 Las Vegas Harry Reid (LAS) 1 19:00 Chicago Midway (MDW)
Southwest Airlines WN 4270 Non-stop Boeing 737-700 (Scimitar Winglets) 3:30 Effective 2026-01-18 through 2026-01-23
Mon-Fri 13:30 Las Vegas Harry Reid (LAS) 1 19:00 Chicago Midway (MDW)
Southwest Airlines WN 4270 Non-stop Boeing 737-700 (Scimitar Winglets) 3:30 Effective 2026-01-26 through 2026-02-04
Sun 13:30 Las Vegas Harry Reid (LAS) 1 19:00 Chicago Midway (MDW)
Southwest Airlines WN 4270 Non-stop Boeing 737-700 (Scimitar Winglets) 3:30 Operates only on 2026-02-08
Tue,Wed 13:30 Las Vegas Harry Reid (LAS) 1 19:00 Chicago Midway (MDW)
Southwest Airlines WN 4270 Non-stop Boeing 737-800 (73H) 3:30 Effective 2026-02-10 through 2026-02-11
Tue,Wed 13:30 Las Vegas Harry Reid (LAS) 1 19:00 Chicago Midway (MDW)
Southwest Airlines WN 4270 Non-stop Boeing 737-800 (73H) 3:30 Effective 2026-02-18 through 2026-03-04
Mon,Thu,Fri 16:50 Las Vegas Harry Reid (LAS) 1 22:15 Chicago Midway (MDW)
Southwest Airlines WN 4270 Non-stop Boeing 737-800 (73H) 3:25 Effective 2026-02-12 through 2026-02-16
Thu,Fri,Sun 16:50 Las Vegas Harry Reid (LAS) 1 22:15 Chicago Midway (MDW)
Southwest Airlines WN 4270 Non-stop Boeing 737-800 (73H) 3:25 Effective 2026-02-20 through 2026-03-01
Thu,Fri,Sun 17:50 Las Vegas Harry Reid (LAS) 1 23:15 Chicago Midway (MDW)
Southwest Airlines WN 4270 Non-stop Boeing 737 MAX 8 (7M8) 3:25 Effective 2026-01-11 through 2026-01-16
Mon,Sun 17:50 Las Vegas Harry Reid (LAS) 1 23:15 Chicago Midway (MDW)
Southwest Airlines WN 4270 Non-stop Boeing 737 MAX 8 (7M8) 3:25 Effective 2026-01-19 through 2026-01-25
Thu,Fri,Sun 17:50 Las Vegas Harry Reid (LAS) 1 23:15 Chicago Midway (MDW)
Southwest Airlines WN 4270 Non-stop Boeing 737 MAX 8 (7M8) 3:25 Effective 2026-02-01 through 2026-02-06
Mon,Sun 17:50 Las Vegas Harry Reid (LAS) 1 23:15 Chicago Midway (MDW)
Southwest Airlines WN 4270 Non-stop Boeing 737 MAX 8 (7M8) 3:25 Effective 2026-02-09 through 2026-02-15
Mon,Tue,Thu 17:50 Las Vegas Harry Reid (LAS) 1 23:15 Chicago Midway (MDW)
Southwest Airlines WN 4270 Non-stop Boeing 737 MAX 8 (7M8) 3:25 Effective 2026-02-17 through 2026-02-23
Mon 17:50 Las Vegas Harry Reid (LAS) 1 23:15 Chicago Midway (MDW)
Southwest Airlines WN 4270 Non-stop Boeing 737 MAX 8 (7M8) 3:25 Operates only on 2026-03-02
Mon,Thu,Fri 11:20 Las Vegas Harry Reid (LAS) 1 16:50 Chicago Midway (MDW)
Southwest Airlines WN 4506 Non-stop Boeing 737-700 (Scimitar Winglets) 3:30 Effective 2026-06-04 through 2026-08-03
Tue,Wed 15:00 Las Vegas Harry Reid (LAS) 1 20:35 Chicago Midway (MDW)
Southwest Airlines WN 4569 Non-stop Boeing 737-800 (73H) 3:35 Effective 2026-04-07 through 2026-06-03
Sun 18:05 Las Vegas Harry Reid (LAS) 1 23:35 Chicago Midway (MDW)
Southwest Airlines WN 5078 Non-stop Boeing 737 MAX 8 (7M8) 3:30 Operates only on 2026-03-01
Non-Direct Flights:
Sun 10:30 Las Vegas Harry Reid (LAS) 1 17:50 Chicago Midway (MDW)
Southwest Airlines WN 162 1-stop Boeing 737-700 (Scimitar Winglets) 5:20 Effective 2026-06-07 through 2026-08-02
Tue,Wed 11:55 Las Vegas Harry Reid (LAS) 1 19:30 Chicago Midway (MDW)
Southwest Airlines WN 300 1-stop Boeing 737-800 (73H) 5:35 Effective 2026-04-07 through 2026-06-03
Sun 10:25 Las Vegas Harry Reid (LAS) 1 17:15 Chicago Midway (MDW)
Southwest Airlines WN 698 1-stop Boeing 737-700 (Scimitar Winglets) 4:50 Operates only on 2026-05-24
Sat 10:40 Las Vegas Harry Reid (LAS) 1 17:40 Chicago Midway (MDW)
Southwest Airlines WN 702 1-stop Boeing 737 MAX 8 (7M8) 5:00 Effective 2026-03-07 through 2026-04-04
prev   1 2 3 4 5 6   next


Southwest Airlines flights from Las Vegas Harry Reid (LAS) to Chicago Midway (MDW).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Effective 2026-06-07 through 2026-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 3:30, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Direct Flights:

Effective 2026-06-04 through 2026-08-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 3:30, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Direct Flights:

Valid until 2026-01-04
Mon
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 3:25, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Valid until 2026-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 3:25, non-stop
Boeing 737-800 (73H)

Direct Flights:

Valid until 2026-01-04
Mon
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 3:25, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Valid until 2026-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 3:30, non-stop
Boeing 737-800 (73H)

Direct Flights:

Operates only on 2026-01-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 3:30, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Direct Flights:

Valid until 2026-01-05
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 3:25, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Direct Flights:

Effective 2026-04-07 through 2026-06-03
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-04-11 through 2026-05-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 3:30, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-04-09 through 2026-06-01
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Operates only on 2026-05-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 3:35, non-stop
Boeing 737-700 (Scimitar Winglets)
The flight arrives 1 day after departure.

Direct Flights:

Effective 2026-04-12 through 2026-05-17
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 3:30, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Direct Flights:

Operates only on 2026-05-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 3:30, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Direct Flights:

Effective 2026-03-10 through 2026-04-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 3:30, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-03-05 through 2026-04-06
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 3:35, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-03-07 through 2026-04-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 3:35, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-03-05 through 2026-04-06
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 3:30, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-03-08 through 2026-04-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 3:30, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-03-07 through 2026-04-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 3:30, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Direct Flights:

Effective 2026-03-05 through 2026-03-06
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 3:25, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Direct Flights:

Effective 2026-03-08 through 2026-04-06
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 3:25, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Direct Flights:

Effective 2026-03-05 through 2026-04-06
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 3:25, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-03-07 through 2026-04-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 3:25, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-06-07 through 2026-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 3:30, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-08-06 through 2026-09-28
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-04-11 through 2026-05-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 3:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-06-07 through 2026-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-14 through 2026-02-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 3:30, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-01-06 through 2026-01-14
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 3:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-01-18 through 2026-01-23
Mon
-
Tue
Wed
Thu
Fri
Sat
-
Sun
Duration: 3:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-01-26 through 2026-02-04
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 3:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Operates only on 2026-02-08
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 3:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-02-10 through 2026-02-11
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 3:30, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-02-18 through 2026-03-04
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 3:30, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-02-12 through 2026-02-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 3:25, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-02-20 through 2026-03-01
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 3:25, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-01-11 through 2026-01-16
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 3:25, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-01-19 through 2026-01-25
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 3:25, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-01 through 2026-02-06
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 3:25, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-09 through 2026-02-15
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 3:25, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-17 through 2026-02-23
Mon
Tue
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 3:25, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Operates only on 2026-03-02
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 3:25, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-06-04 through 2026-08-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 3:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-04-07 through 2026-06-03
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 3:35, non-stop
Boeing 737-800 (73H)

Direct Flights:

Operates only on 2026-03-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 3:30, non-stop
Boeing 737 MAX 8 (7M8)

Non-Direct Flights:

Effective 2026-06-07 through 2026-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:20, 1-stop
Boeing 737-700 (Scimitar Winglets)

Non-Direct Flights:

Effective 2026-04-07 through 2026-06-03
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:35, 1-stop
Boeing 737-800 (73H)

Non-Direct Flights:

Operates only on 2026-05-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:50, 1-stop
Boeing 737-700 (Scimitar Winglets)

Non-Direct Flights:

Effective 2026-03-07 through 2026-04-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:00, 1-stop
Boeing 737 MAX 8 (7M8)
prev        Page 4 / 6        next
  • A domestic route departing from the Las Vegas Harry Reid airport (LAS) and arriving at Chicago Midway airport (MDW).
  • The flight distance is 1516 miles, or 2440 km.
  • The timezone of the departure airport is UTC-8 , and the timezone of the arrival airport is UTC-6 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 3:20 and 3:40.