| FLIGHT SCHEDULE |
|---|
| Direct Codeshare Flights: |
| Tue
11:40
Brisbane (BNE) D
13:55
Townsville (TSV) Qatar Airways QR 4237 Non-stop Fokker 70 (F70) 2:15 Effective 2026-07-21 through 2026-07-28 Codeshare flight, operated by Virgin Australia.(VA 391) |
| Thu,Sun
11:40
Brisbane (BNE) D
13:50
Townsville (TSV) Qatar Airways QR 4237 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-07-23 through 2026-08-02 Codeshare flight, operated by Virgin Australia.(VA 391) |
| Fri,Sat
11:40
Brisbane (BNE) D
13:50
Townsville (TSV) Qatar Airways QR 4237 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-07-24 through 2026-09-05 Codeshare flight, operated by Virgin Australia.(VA 391) |
| Tue,Thu,Sun
11:40
Brisbane (BNE) D
13:50
Townsville (TSV) Qatar Airways QR 4237 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-08-04 through 2026-09-10 Codeshare flight, operated by Virgin Australia.(VA 391) |
| Tue,Thu,Fri,Sun
11:40
Brisbane (BNE) D
13:50
Townsville (TSV) Qatar Airways QR 4237 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-09-11 through 2026-10-23 Codeshare flight, operated by Virgin Australia.(VA 391) |
| Sat
11:40
Brisbane (BNE) D
13:50
Townsville (TSV) Qatar Airways QR 4237 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-09-12 through 2026-10-24 Codeshare flight, operated by Virgin Australia.(VA 391) |
| Sun
08:50
Brisbane (BNE) D
10:55
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-700 (73W) 2:05 Effective 2026-01-04 through 2026-01-11 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Sun
08:50
Brisbane (BNE) D
10:55
Townsville (TSV) Qatar Airways QR 4239 Non-stop Fokker 100 (100) 2:05 Operates only on 2026-01-18 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Sun
08:50
Brisbane (BNE) D
10:55
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-700 (73W) 2:05 Operates only on 2026-01-25 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Sun
08:50
Brisbane (BNE) D
10:55
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-800 (73H) 2:05 Effective 2026-02-01 through 2026-03-08 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Mon,Sun
08:50
Brisbane (BNE) D
10:55
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-800 (73H) 2:05 Effective 2026-03-09 through 2026-03-15 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Sun
08:50
Brisbane (BNE) D
10:55
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-800 (73H) 2:05 Operates only on 2026-03-22 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Mon-Fri
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-03-30 through 2026-04-17 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Sat
08:50
Brisbane (BNE) D
11:05
Townsville (TSV) Qatar Airways QR 4239 Non-stop Fokker 70 (F70) 2:15 Effective 2026-04-04 through 2026-04-11 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Tue,Wed,Fri,Sat
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-04-18 through 2026-04-24 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Mon,Thu
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-04-20 through 2026-04-23 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Sat
08:50
Brisbane (BNE) D
11:05
Townsville (TSV) Qatar Airways QR 4239 Non-stop Fokker 100 (100) 2:15 Effective 2026-04-25 through 2026-06-13 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Mon-Fri
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-04-27 through 2026-05-18 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Tue
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-700 (73W) 2:10 Operates only on 2026-05-19 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Mon-Fri
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-05-20 through 2026-06-19 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Mon,Thu,Sat
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-06-20 through 2026-06-27 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Mon-Wed,Fri
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-06-23 through 2026-07-01 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Mon-Sat
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-07-02 through 2026-07-18 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Mon,Tue,Fri
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-07-20 through 2026-07-24 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Mon,Wed,Thu
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-07-22 through 2026-07-30 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Sat
08:50
Brisbane (BNE) D
11:05
Townsville (TSV) Qatar Airways QR 4239 Non-stop Fokker 100 (100) 2:15 Effective 2026-07-25 through 2026-09-26 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Mon,Tue
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-07-28 through 2026-08-03 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Tue-Fri
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-07-31 through 2026-08-06 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Fri
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-700 (73W) 2:10 Operates only on 2026-08-07 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Mon-Fri
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-08-10 through 2026-08-24 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Tue,Fri
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-08-25 through 2026-08-28 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Mon-Thu
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-08-26 through 2026-09-03 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Mon-Fri
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-09-04 through 2026-10-09 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Sat
08:50
Brisbane (BNE) D
11:05
Townsville (TSV) Qatar Airways QR 4239 Non-stop Fokker 70 (F70) 2:15 Operates only on 2026-10-03 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Mon-Sat
08:50
Brisbane (BNE) D
11:00
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-10-10 through 2026-10-24 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Daily
08:50
Brisbane (BNE) D
10:55
Townsville (TSV) Qatar Airways QR 4239 Non-stop Boeing 737-800 (73H) 2:05 Effective from 2026-10-25 Codeshare flight, operated by Virgin Australia.(VA 387) |
| Mon
11:30
Brisbane (BNE) D
13:35
Townsville (TSV) Qatar Airways QR 4241 Non-stop Boeing 737-700 (73W) 2:05 Effective from 2026-10-26 Codeshare flight, operated by Virgin Australia.(VA 391) |
| Mon
11:40
Brisbane (BNE) D
13:50
Townsville (TSV) Qatar Airways QR 4241 Non-stop Boeing 737-700 (73W) 2:10 Operates only on 2026-03-30 Codeshare flight, operated by Virgin Australia.(VA 391) |
| Mon
11:40
Brisbane (BNE) D
13:50
Townsville (TSV) Qatar Airways QR 4241 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-04-06 through 2026-06-22 Codeshare flight, operated by Virgin Australia.(VA 391) |
| Mon
11:40
Brisbane (BNE) D
13:50
Townsville (TSV) Qatar Airways QR 4241 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-06-29 through 2026-07-13 Codeshare flight, operated by Virgin Australia.(VA 391) |
| Mon
11:40
Brisbane (BNE) D
13:50
Townsville (TSV) Qatar Airways QR 4241 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-07-20 through 2026-09-07 Codeshare flight, operated by Virgin Australia.(VA 391) |
| Mon
11:40
Brisbane (BNE) D
13:50
Townsville (TSV) Qatar Airways QR 4241 Non-stop Boeing 737-700 (73W) 2:10 Effective 2026-09-14 through 2026-10-19 Codeshare flight, operated by Virgin Australia.(VA 391) |
| Sun
17:50
Brisbane (BNE) D
20:00
Townsville (TSV) Qatar Airways QR 4241 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2026-04-05 Codeshare flight, operated by Virgin Australia.(VA 395) |
| Mon,Fri
19:40
Brisbane (BNE) D
21:45
Townsville (TSV) Qatar Airways QR 4241 Non-stop Boeing 737-800 (73H) 2:05 Valid until 2026-01-05 Codeshare flight, operated by Virgin Australia.(VA 397) |
| Mon-Wed,Fri
19:40
Brisbane (BNE) D
21:45
Townsville (TSV) Qatar Airways QR 4241 Non-stop Boeing 737-800 (73H) 2:05 Effective 2026-01-06 through 2026-01-23 Codeshare flight, operated by Virgin Australia.(VA 397) |
| Tue-Fri,Sun
19:40
Brisbane (BNE) D
21:45
Townsville (TSV) Qatar Airways QR 4241 Non-stop Boeing 737-800 (73H) 2:05 Effective from 2026-10-25 Codeshare flight, operated by Virgin Australia.(VA 397) |
| Tue-Fri,Sun
20:20
Brisbane (BNE) D
22:30
Townsville (TSV) Qatar Airways QR 4241 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-03-29 through 2026-04-03 Codeshare flight, operated by Virgin Australia.(VA 397) |
| Tue-Fri,Sun
20:20
Brisbane (BNE) D
22:30
Townsville (TSV) Qatar Airways QR 4241 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-04-07 through 2026-10-23 Codeshare flight, operated by Virgin Australia.(VA 397) |
| Mon
19:40
Brisbane (BNE) D
21:45
Townsville (TSV) Qatar Airways QR 4247 Non-stop Boeing 737-800 (73H) 2:05 Effective from 2026-10-26 Codeshare flight, operated by Virgin Australia.(VA 397) |
| Mon
20:20
Brisbane (BNE) D
22:30
Townsville (TSV) Qatar Airways QR 4247 Non-stop Boeing 737-800 (73H) 2:10 Effective 2026-03-30 through 2026-10-19 Codeshare flight, operated by Virgin Australia.(VA 397) |