Delta Air Lines flights from Mendoza (MDZ) to Buenos Aires Ministro Pistarini Intl (EZE).

Select flight date:
FLIGHT SCHEDULE
Direct Codeshare Flights:
Tue 19:15 Mendoza (MDZ) 20:55 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7592 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-01-20 through 2026-01-27
Codeshare flight, operated by Aerolineas Argentinas.(AR 1421)
Sat 18:45 Mendoza (MDZ) 20:25 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7593 Non-stop Boeing 737-800 (738) 1:40 Operates only on 2026-01-31
Codeshare flight, operated by Aerolineas Argentinas.(AR 1421)
Sat 19:00 Mendoza (MDZ) 20:40 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7593 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-01-03 through 2026-01-17
Codeshare flight, operated by Aerolineas Argentinas.(AR 1421)
Sat 19:00 Mendoza (MDZ) 20:40 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7593 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2026-01-24
Codeshare flight, operated by Aerolineas Argentinas.(AR 1421)
Thu 17:15 Mendoza (MDZ) 18:55 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7602 Non-stop Boeing 737-800 (738) 1:40 Operates only on 2026-01-01
Codeshare flight, operated by Aerolineas Argentinas.(AR 1421)
Sun 18:30 Mendoza (MDZ) 20:10 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7602 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2026-02-22
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Thu 18:45 Mendoza (MDZ) 20:25 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7602 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-01-08 through 2026-02-26
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Sun 18:55 Mendoza (MDZ) 20:35 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7602 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2026-02-15
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Sun 19:00 Mendoza (MDZ) 20:40 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7602 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2026-02-01
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Sat 19:00 Mendoza (MDZ) 20:40 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7603 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-02-21 through 2026-02-28
Codeshare flight, operated by Aerolineas Argentinas.(AR 1421)
Thu 11:40 Mendoza (MDZ) 13:20 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7604 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-04-02 through 2026-05-28
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Sat 11:40 Mendoza (MDZ) 13:20 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7604 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-04-04 through 2026-05-30
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Sun 15:00 Mendoza (MDZ) 16:40 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7605 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-03-01 through 2026-03-29
Codeshare flight, operated by Aerolineas Argentinas.(AR 1415)
Fri 18:45 Mendoza (MDZ) 20:25 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7605 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-01-02 through 2026-02-27
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Wed 18:50 Mendoza (MDZ) 20:30 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7605 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-03-04 through 2026-03-25
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Fri,Sat 18:50 Mendoza (MDZ) 20:30 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7605 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-03-06 through 2026-03-28
Codeshare flight, operated by Aerolineas Argentinas.(AR 1417)
Thu 19:00 Mendoza (MDZ) 20:40 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7605 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-03-05 through 2026-03-26
Codeshare flight, operated by Aerolineas Argentinas.(AR 1421)
Fri 19:00 Mendoza (MDZ) 20:40 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7605 Non-stop Boeing 737-800 (738) 1:40 Effective from 2026-10-30
Codeshare flight, operated by Aerolineas Argentinas.(AR 1419)
Tue 19:15 Mendoza (MDZ) 20:55 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7605 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-02-03 through 2026-02-17
Codeshare flight, operated by Aerolineas Argentinas.(AR 1421)
Mon 19:20 Mendoza (MDZ) 21:00 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7605 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-03-09 through 2026-03-23
Codeshare flight, operated by Aerolineas Argentinas.(AR 1421)
Sat 10:40 Mendoza (MDZ) 12:20 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7606 Non-stop Boeing 737-700 (73R) 1:40 Effective 2026-07-11 through 2026-08-29
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Sat 10:50 Mendoza (MDZ) 12:30 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7606 Non-stop Boeing 737-800 (738) 1:40 Operates only on 2026-07-04
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Tue 11:20 Mendoza (MDZ) 13:00 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7606 Non-stop Boeing 737-800 (738) 1:40 Operates only on 2026-06-30
Codeshare flight, operated by Aerolineas Argentinas.(AR 1407)
Thu 11:20 Mendoza (MDZ) 13:00 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7606 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-07-09 through 2026-08-27
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Thu 11:30 Mendoza (MDZ) 13:10 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7606 Non-stop Boeing 737-200 Combi (73M) 1:40 Operates only on 2026-07-02
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Thu 11:40 Mendoza (MDZ) 13:20 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7606 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-06-04 through 2026-06-25
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Sat 11:40 Mendoza (MDZ) 13:20 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7606 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-06-06 through 2026-06-27
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Tue 11:40 Mendoza (MDZ) 13:20 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7606 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-08-04 through 2026-08-25
Codeshare flight, operated by Aerolineas Argentinas.(AR 1407)
Wed 11:50 Mendoza (MDZ) 13:30 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7606 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2026-07-01
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Wed 11:50 Mendoza (MDZ) 13:30 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7606 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-08-05 through 2026-08-26
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Tue 12:00 Mendoza (MDZ) 13:40 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7606 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-09-01 through 2026-10-20
Codeshare flight, operated by Aerolineas Argentinas.(AR 1407)
Sun 19:00 Mendoza (MDZ) 20:40 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7606 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-03-01 through 2026-03-22
Codeshare flight, operated by Aerolineas Argentinas.(AR 1421)
Mon 19:20 Mendoza (MDZ) 21:00 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7607 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-02-02 through 2026-02-16
Codeshare flight, operated by Aerolineas Argentinas.(AR 1421)
Sun 11:20 Mendoza (MDZ) 13:00 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7608 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-05-31 through 2026-06-28
Codeshare flight, operated by Aerolineas Argentinas.(AR 1419)
Sun 18:30 Mendoza (MDZ) 20:10 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7608 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2026-01-25
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Sun 18:45 Mendoza (MDZ) 20:25 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7608 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-01-04 through 2026-01-11
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Tue 19:15 Mendoza (MDZ) 20:55 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7608 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-01-06 through 2026-01-13
Codeshare flight, operated by Aerolineas Argentinas.(AR 1421)
Mon 19:20 Mendoza (MDZ) 21:00 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7608 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-01-05 through 2026-01-26
Codeshare flight, operated by Aerolineas Argentinas.(AR 1421)
Sun 11:40 Mendoza (MDZ) 13:20 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7609 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-07-12 through 2026-08-02
Codeshare flight, operated by Aerolineas Argentinas.(AR 1419)
Thu 11:40 Mendoza (MDZ) 13:20 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7609 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-09-03 through 2026-10-22
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Mon 11:45 Mendoza (MDZ) 13:25 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7609 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-08-03 through 2026-08-31
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Mon 11:50 Mendoza (MDZ) 13:30 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7609 Non-stop Boeing 737-800 (738) 1:40 Operates only on 2026-06-29
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Tue 12:00 Mendoza (MDZ) 13:40 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7609 Non-stop Boeing 737-800 (738) 1:40 Effective from 2026-10-27
Codeshare flight, operated by Aerolineas Argentinas.(AR 1407)
Fri 15:30 Mendoza (MDZ) 17:10 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7609 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2026-07-03
Codeshare flight, operated by Aerolineas Argentinas.(AR 1413)
Tue 19:15 Mendoza (MDZ) 20:55 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7609 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2026-02-24
Codeshare flight, operated by Aerolineas Argentinas.(AR 1421)
Sun 11:40 Mendoza (MDZ) 13:20 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7610 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-08-09 through 2026-08-30
Codeshare flight, operated by Aerolineas Argentinas.(AR 1419)
Thu 11:40 Mendoza (MDZ) 13:20 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7610 Non-stop Boeing 737-800 (738) 1:40 Effective from 2026-10-29
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Mon 11:45 Mendoza (MDZ) 13:25 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7610 Non-stop Boeing 737-800 (738) 1:40 Effective from 2026-09-07
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Wed 11:50 Mendoza (MDZ) 13:30 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7610 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective from 2026-09-02
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Wed 18:50 Mendoza (MDZ) 20:30 Buenos Aires Ministro Pistarini Intl (EZE) DA
Delta Air Lines DL 7610 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-01-07 through 2026-02-25
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
1 2   next


Delta Air Lines flights from Mendoza (MDZ) to Buenos Aires Ministro Pistarini Intl (EZE).
Select flight date:
FLIGHT SCHEDULE
Direct Codeshare Flights:

Effective 2026-01-20 through 2026-01-27
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1421)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Operates only on 2026-01-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1421)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective 2026-01-03 through 2026-01-17
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1421)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Operates only on 2026-01-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1421)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Operates only on 2026-01-01
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1421)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Operates only on 2026-02-22
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-01-08 through 2026-02-26
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Operates only on 2026-02-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Operates only on 2026-02-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-02-21 through 2026-02-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1421)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective 2026-04-02 through 2026-05-28
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective 2026-04-04 through 2026-05-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-03-01 through 2026-03-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Aerolineas Argentinas. (AR 1415)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective 2026-01-02 through 2026-02-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-03-04 through 2026-03-25
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-03-06 through 2026-03-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1417)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective 2026-03-05 through 2026-03-26
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1421)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective from 2026-10-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1419)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective 2026-02-03 through 2026-02-17
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1421)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-03-09 through 2026-03-23
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1421)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-07-11 through 2026-08-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Boeing 737-700 (73R)

Direct Codeshare Flights:

Operates only on 2026-07-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Operates only on 2026-06-30
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1407)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective 2026-07-09 through 2026-08-27
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Operates only on 2026-07-02
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Boeing 737-200 Combi (73M)

Direct Codeshare Flights:

Effective 2026-06-04 through 2026-06-25
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective 2026-06-06 through 2026-06-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-08-04 through 2026-08-25
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1407)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Operates only on 2026-07-01
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-08-05 through 2026-08-26
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-09-01 through 2026-10-20
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1407)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective 2026-03-01 through 2026-03-22
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Aerolineas Argentinas. (AR 1421)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective 2026-02-02 through 2026-02-16
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1421)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-05-31 through 2026-06-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Aerolineas Argentinas. (AR 1419)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Operates only on 2026-01-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-01-04 through 2026-01-11
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-01-06 through 2026-01-13
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1421)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-01-05 through 2026-01-26
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1421)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-07-12 through 2026-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Aerolineas Argentinas. (AR 1419)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective 2026-09-03 through 2026-10-22
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective 2026-08-03 through 2026-08-31
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Operates only on 2026-06-29
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective from 2026-10-27
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1407)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Operates only on 2026-07-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1413)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Operates only on 2026-02-24
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1421)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-08-09 through 2026-08-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Aerolineas Argentinas. (AR 1419)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective from 2026-10-29
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective from 2026-09-07
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Direct Codeshare Flights:

Effective from 2026-09-02
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Direct Codeshare Flights:

Effective 2026-01-07 through 2026-02-25
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Boeing 737-800 (738)
Page 1 / 2        next
  • A domestic route departing from the Mendoza airport (MDZ) and arriving at Buenos Aires Ministro Pistarini Intl airport (EZE).
  • The flight distance is 604 miles, or 972 km.
  • The timezone of both the departure and the arrival airports is UTC-3 . Current time at both airports is (loading...).
  • For direct flights, the flight time is 1:40.