Air India Express flights from Kolkata (CCU) to Bhubaneshwar (BBI).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Mon-Fri,Sun 11:25 Kolkata (CCU) 12:35 Bhubaneshwar (BBI) 1
Air India Express IX 1038 Non-stop Airbus A320neo (32N) 1:10 Effective from 2026-03-29
Sat 14:25 Kolkata (CCU) 15:35 Bhubaneshwar (BBI) 1
Air India Express IX 1038 Non-stop Airbus A320neo (32N) 1:10 Effective from 2026-04-04
Non-Direct Flights:
Sat 18:55 Kolkata (CCU) 17:20 Bhubaneshwar (BBI) 1
Air India Express IX 1134 1-stop Boeing 737 MAX 8 (7M8) 22:25 Operates only on 2026-01-31
The flight arrives 1 day after departure.


Air India Express flights from Kolkata (CCU) to Bhubaneshwar (BBI).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Effective from 2026-03-29
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
Duration: 1:10, non-stop
Airbus A320neo (32N)

Direct Flights:

Effective from 2026-04-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:10, non-stop
Airbus A320neo (32N)

Non-Direct Flights:

18:55

17:20(+1)
Operates only on 2026-01-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 22:25, 1-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.
  • A domestic route departing from the Kolkata airport (CCU) and arriving at Bhubaneshwar airport (BBI).
  • The flight distance is 237 miles, or 382 km.
  • The timezone of both the departure and the arrival airports is UTC+5.5 . Current time at both airports is (loading...).
  • For direct flights, the flight time is 1:10.