Todas as companhias a voar a partir de Savannah (SAV) a Nashville (BNA).

Seleccionar data do voo:
PLANEAR VOO
Voos Directos:
Seg-Sex 16:00 Savannah (SAV) 16:35 Nashville (BNA)
Southwest Airlines WN 3472 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2026-01-06 through 2026-01-14
Ter-Sex,Dom 16:00 Savannah (SAV) 16:35 Nashville (BNA)
Southwest Airlines WN 3472 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2026-01-18 through 2026-01-23
Seg-Sex 16:00 Savannah (SAV) 16:35 Nashville (BNA)
Southwest Airlines WN 3472 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2026-01-26 through 2026-02-04
Ter,Qua,Dom 16:00 Savannah (SAV) 16:35 Nashville (BNA)
Southwest Airlines WN 3472 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2026-02-08 through 2026-02-11
Ter,Qua 16:00 Savannah (SAV) 16:35 Nashville (BNA)
Southwest Airlines WN 3472 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2026-02-18 through 2026-03-04
Sáb 17:25 Savannah (SAV) 18:00 Nashville (BNA)
Southwest Airlines WN 3472 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2026-01-10 through 2026-02-07
Sáb 18:55 Savannah (SAV) 19:35 Nashville (BNA)
Southwest Airlines WN 3472 Non-stop Boeing 737 MAX 8 (7M8) 1:40 Effective 2026-02-14 through 2026-02-28
Qui,Sex,Dom 19:20 Savannah (SAV) 20:00 Nashville (BNA)
Southwest Airlines WN 3472 Non-stop Boeing 737-800 (73H) 1:40 Effective 2026-01-11 through 2026-01-16
Seg,Dom 19:20 Savannah (SAV) 20:00 Nashville (BNA)
Southwest Airlines WN 3472 Non-stop Boeing 737-800 (73H) 1:40 Effective 2026-01-19 through 2026-01-25
Qui,Sex,Dom 19:20 Savannah (SAV) 20:00 Nashville (BNA)
Southwest Airlines WN 3472 Non-stop Boeing 737-800 (73H) 1:40 Effective 2026-02-01 through 2026-02-06
Seg,Dom 19:20 Savannah (SAV) 20:00 Nashville (BNA)
Southwest Airlines WN 3472 Non-stop Boeing 737-800 (73H) 1:40 Effective 2026-02-09 through 2026-02-15
Seg,Ter,Qui 19:20 Savannah (SAV) 20:00 Nashville (BNA)
Southwest Airlines WN 3472 Non-stop Boeing 737-800 (73H) 1:40 Effective 2026-02-17 through 2026-02-23
Seg 19:20 Savannah (SAV) 20:00 Nashville (BNA)
Southwest Airlines WN 3472 Non-stop Boeing 737-800 (73H) 1:40 Operates only on 2026-03-02
Seg,Qui,Sex 20:40 Savannah (SAV) 21:15 Nashville (BNA)
Southwest Airlines WN 3472 Non-stop Boeing 737-800 (73H) 1:35 Effective 2026-02-12 through 2026-02-16
Qui,Sex,Dom 20:40 Savannah (SAV) 21:15 Nashville (BNA)
Southwest Airlines WN 3472 Non-stop Boeing 737-800 (73H) 1:35 Effective 2026-02-20 through 2026-03-01
Ter,Qua 06:45 Savannah (SAV) 07:10 Nashville (BNA)
Southwest Airlines WN 3511 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-08-04 through 2026-09-30
Seg,Qui,Sex 06:45 Savannah (SAV) 07:10 Nashville (BNA)
Southwest Airlines WN 3511 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2026-08-06 through 2026-09-28
Dom 07:15 Savannah (SAV) 07:45 Nashville (BNA)
Southwest Airlines WN 3511 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-08-09 through 2026-09-27
Seg,Qui,Sex 11:30 Savannah (SAV) 12:00 Nashville (BNA)
Southwest Airlines WN 3512 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-08-06 through 2026-09-28
Sáb 16:35 Savannah (SAV) 17:05 Nashville (BNA)
Southwest Airlines WN 3512 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-08-08 through 2026-09-26
Ter,Qua 18:40 Savannah (SAV) 19:10 Nashville (BNA)
Southwest Airlines WN 3512 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2026-08-04 through 2026-09-30
Seg,Ter,Sex,Dom 12:40 Savannah (SAV) 13:15 Nashville (BNA)
Southwest Airlines WN 3560 Non-stop Boeing 737-800 (73H) 1:35 Valid until 2026-01-04
Seg-Sex,Dom 06:45 Savannah (SAV) 07:10 Nashville (BNA)
Southwest Airlines WN 3592 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-06-04 through 2026-08-03
Sáb 20:30 Savannah (SAV) 21:00 Nashville (BNA)
Southwest Airlines WN 3593 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2026-06-06 through 2026-08-01
Seg,Qui,Sex 21:10 Savannah (SAV) 21:40 Nashville (BNA)
Southwest Airlines WN 3593 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2026-06-04 through 2026-08-03
Dom 21:10 Savannah (SAV) 21:40 Nashville (BNA)
Southwest Airlines WN 3593 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-06-07 through 2026-08-02
Seg,Qui,Sex 06:10 Savannah (SAV) 06:40 Nashville (BNA)
Southwest Airlines WN 4177 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2026-04-09 through 2026-06-01
Ter,Qua 06:40 Savannah (SAV) 07:10 Nashville (BNA)
Southwest Airlines WN 4177 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2026-04-07 through 2026-06-03
Dom 15:30 Savannah (SAV) 16:00 Nashville (BNA)
Southwest Airlines WN 4177 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2026-04-12 through 2026-05-17
Dom 15:30 Savannah (SAV) 16:00 Nashville (BNA)
Southwest Airlines WN 4177 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Operates only on 2026-05-31
Seg,Qui,Sex 12:50 Savannah (SAV) 13:25 Nashville (BNA)
Southwest Airlines WN 4178 Non-stop Boeing 737-700 (Scimitar Winglets) 1:35 Effective 2026-04-09 through 2026-06-01
Sáb 18:00 Savannah (SAV) 18:35 Nashville (BNA)
Southwest Airlines WN 4179 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2026-04-11 through 2026-05-30
Ter,Qua 19:05 Savannah (SAV) 19:40 Nashville (BNA)
Southwest Airlines WN 4179 Non-stop Boeing 737-800 (73H) 1:35 Effective 2026-04-07 through 2026-06-03
Seg,Qui,Sex 20:20 Savannah (SAV) 20:55 Nashville (BNA)
Southwest Airlines WN 4179 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2026-04-09 through 2026-06-01
Dom 20:55 Savannah (SAV) 21:30 Nashville (BNA)
Southwest Airlines WN 4179 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2026-04-12 through 2026-05-17
Dom 20:55 Savannah (SAV) 21:30 Nashville (BNA)
Southwest Airlines WN 4179 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Operates only on 2026-05-31
Dom 07:20 Savannah (SAV) 07:50 Nashville (BNA)
Southwest Airlines WN 4206 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Operates only on 2026-05-24
Seg,Qui,Sex 12:45 Savannah (SAV) 13:20 Nashville (BNA)
Southwest Airlines WN 4408 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2026-03-05 through 2026-04-06
Sáb 11:00 Savannah (SAV) 11:30 Nashville (BNA)
Southwest Airlines WN 4486 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2026-08-08 through 2026-09-26
Dom 11:10 Savannah (SAV) 11:40 Nashville (BNA)
Southwest Airlines WN 4486 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-08-09 through 2026-09-27
Dom 19:30 Savannah (SAV) 20:05 Nashville (BNA)
Southwest Airlines WN 5037 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2026-08-09 through 2026-09-27
Voos Não-Directos:
Seg,Qui,Sex 07:20 Savannah (SAV) 12:35 Nashville (BNA)
Southwest Airlines WN 1110 2-stop Boeing 737-700 (Scimitar Winglets) 6:15 Effective 2026-06-04 through 2026-08-03
prev   1 2


Todas as companhias a voar a partir de Savannah (SAV) a Nashville (BNA).
Seleccionar data do voo:
PLANEAR VOO
Voos Directos:

Effective 2026-01-06 through 2026-01-14
Seg
Ter
Qua
Qui
Sex
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-01-18 through 2026-01-23
Seg
-
Ter
Qua
Qui
Sex
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-01-26 through 2026-02-04
Seg
Ter
Qua
Qui
Sex
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-08 through 2026-02-11
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-18 through 2026-03-04
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-01-10 through 2026-02-07
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-14 through 2026-02-28
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:40, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-01-11 through 2026-01-16
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Voos Directos:

Effective 2026-01-19 through 2026-01-25
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Voos Directos:

Effective 2026-02-01 through 2026-02-06
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Voos Directos:

Effective 2026-02-09 through 2026-02-15
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Voos Directos:

Effective 2026-02-17 through 2026-02-23
Seg
Ter
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Voos Directos:

Operates only on 2026-03-02
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Voos Directos:

Effective 2026-02-12 through 2026-02-16
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Voos Directos:

Effective 2026-02-20 through 2026-03-01
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Voos Directos:

Effective 2026-08-04 through 2026-09-30
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-08-06 through 2026-09-28
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-08-09 through 2026-09-27
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-08-06 through 2026-09-28
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Voos Directos:

Effective 2026-08-08 through 2026-09-26
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-08-04 through 2026-09-30
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Valid until 2026-01-04
Seg
Ter
Qua
-
Qui
-
Sex
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Voos Directos:

Effective 2026-06-04 through 2026-08-03
Seg
Ter
Qua
Qui
Sex
Sáb
-
Dom
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-06-06 through 2026-08-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-06-04 through 2026-08-03
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-06-07 through 2026-08-02
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-04-09 through 2026-06-01
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-04-07 through 2026-06-03
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-04-12 through 2026-05-17
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Operates only on 2026-05-31
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-04-09 through 2026-06-01
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-04-11 through 2026-05-30
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-04-07 through 2026-06-03
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Voos Directos:

Effective 2026-04-09 through 2026-06-01
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-04-12 through 2026-05-17
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Operates only on 2026-05-31
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Operates only on 2026-05-24
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-03-05 through 2026-04-06
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-08-08 through 2026-09-26
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-08-09 through 2026-09-27
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-08-09 through 2026-09-27
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Voos Não-Directos:

Effective 2026-06-04 through 2026-08-03
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 6:15, 2-stop
Boeing 737-700 (Scimitar Winglets)
prev        Page 2 / 2
  • Uma rota doméstica com partida no aeroporto Savannah (SAV) e chegada no aeroporto Nashville (BNA).
  • O voo tem uma distância de 417 milhas, ou 672 km.
  • O fuso horário no aeroporto de partida é UTC-5 , e o fuso horário do aeroporto de chegada é UTC-6 . A hora atual no ponto de partida é (loading...), e (loading...) no ponto de chegada. Há uma diferença horária de (loading...) horas entre os aeroportos.
  • Para voos diretos, o tempo de voo varia entre 1:25 e 1:40.