Todas as companhias a voar a partir de Orlando (MCO) a Minneapolis/Saint Paul (MSP).

Seleccionar data do voo:
PLANEAR VOO
Voos Directos:
Seg 20:59 Orlando (MCO) B 23:43 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 348 Non-stop Boeing 737-800 (738) 3:44 Operates only on 2025-03-31
Seg,Qui,Sex 21:00 Orlando (MCO) B 23:38 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 348 Non-stop Boeing 737-800 (738) 3:38 Effective 2025-01-30 through 2025-02-03
Dom 21:07 Orlando (MCO) B 23:51 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 348 Non-stop Boeing 737-800 (738) 3:44 Operates only on 2025-02-23
Qui 21:07 Orlando (MCO) B 23:51 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 348 Non-stop Boeing 737-800 (738) 3:44 Operates only on 2025-03-20
Seg,Sex 21:10 Orlando (MCO) B 23:48 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 348 Non-stop Boeing 737-800 (738) 3:38 Effective 2025-01-13 through 2025-01-17
Qua,Qui 21:10 Orlando (MCO) B 23:54 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 348 Non-stop Boeing 737-800 (738) 3:44 Effective 2025-02-20 through 2025-02-26
Qua 21:15 Orlando (MCO) B 23:59 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 348 Non-stop Boeing 737-800 (738) 3:44 Operates only on 2025-02-19
Sáb,Dom 21:15 Orlando (MCO) B 23:59 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 348 Non-stop Boeing 737-800 (738) 3:44 Effective 2025-04-05 through 2025-04-06
Qua 21:16 Orlando (MCO) B 23:52 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 348 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2024-12-25
Sex 21:20 Orlando (MCO) B 00:04 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 348 Non-stop Boeing 737-800 (738) 3:44 Effective 2025-02-21 through 2025-02-28
The flight arrives 1 day after departure.
Sex 21:20 Orlando (MCO) B 00:04 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 348 Non-stop Boeing 737-800 (738) 3:44 Operates only on 2025-03-28
The flight arrives 1 day after departure.
Dom 21:21 Orlando (MCO) B 23:59 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 348 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2025-02-09
Sex 21:27 Orlando (MCO) B 00:05 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 348 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2025-01-24
The flight arrives 1 day after departure.
Sex 21:27 Orlando (MCO) B 00:05 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 348 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2025-02-14
The flight arrives 1 day after departure.
Sex 21:27 Orlando (MCO) B 00:11 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 348 Non-stop Boeing 737-800 (738) 3:44 Operates only on 2025-03-14
The flight arrives 1 day after departure.
Sex 21:50 Orlando (MCO) B 00:34 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 348 Non-stop Boeing 737-800 (738) 3:44 Operates only on 2025-03-21
The flight arrives 1 day after departure.
Seg 06:50 Orlando (MCO) B 09:31 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:41 Operates only on 2025-02-03
Qui,Sex 06:57 Orlando (MCO) B 09:38 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:41 Effective 2025-01-31 through 2025-02-06
Qua,Sex,Dom 06:57 Orlando (MCO) B 09:38 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:41 Effective 2025-02-09 through 2025-02-14
Ter 06:57 Orlando (MCO) B 09:38 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:41 Operates only on 2025-02-18
Sex,Sáb 06:59 Orlando (MCO) B 09:47 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:48 Effective 2025-02-21 through 2025-02-22
Sex 06:59 Orlando (MCO) B 09:47 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:48 Operates only on 2025-03-14
Sex 06:59 Orlando (MCO) B 09:47 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:48 Operates only on 2025-03-28
Seg 07:00 Orlando (MCO) B 09:36 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2024-12-23
Ter,Qui 07:00 Orlando (MCO) B 09:41 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:41 Effective 2025-02-11 through 2025-02-13
Seg,Qui 07:00 Orlando (MCO) B 09:48 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:48 Effective 2025-02-20 through 2025-02-24
Sex,Sáb 07:00 Orlando (MCO) B 09:48 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:48 Effective 2025-03-01 through 2025-03-08
Dom 07:08 Orlando (MCO) B 09:44 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2024-12-29
Sáb,Dom 07:10 Orlando (MCO) B 09:46 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:36 Effective 2024-12-21 through 2024-12-22
Dom 07:10 Orlando (MCO) B 09:58 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:48 Operates only on 2025-02-23
Sáb,Dom 07:10 Orlando (MCO) B 09:58 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:48 Effective 2025-03-09 through 2025-03-15
Sáb 07:10 Orlando (MCO) B 09:58 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:48 Effective 2025-03-22 through 2025-03-29
Sáb 07:15 Orlando (MCO) B 09:56 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:41 Operates only on 2025-02-08
Seg,Dom 07:15 Orlando (MCO) B 10:03 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:48 Effective 2025-03-10 through 2025-03-16
Seg,Dom 07:15 Orlando (MCO) B 10:03 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:48 Effective 2025-03-23 through 2025-03-24
Seg 07:15 Orlando (MCO) B 10:03 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:48 Operates only on 2025-03-31
Seg 07:20 Orlando (MCO) B 10:01 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:41 Operates only on 2025-02-10
Dom 07:45 Orlando (MCO) B 10:23 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2024-12-15
Sex 07:45 Orlando (MCO) B 10:33 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:48 Operates only on 2025-02-28
Sáb 07:59 Orlando (MCO) B 10:40 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:41 Operates only on 2025-02-01
Sáb 07:59 Orlando (MCO) B 10:40 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:41 Operates only on 2025-02-15
Sex 08:00 Orlando (MCO) B 10:41 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:41 Operates only on 2025-02-07
Seg 08:00 Orlando (MCO) B 10:48 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:48 Operates only on 2025-03-03
Ter 08:25 Orlando (MCO) B 11:01 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2024-12-24
Sáb 08:30 Orlando (MCO) B 11:08 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2024-12-07
Dom 08:45 Orlando (MCO) B 11:33 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:48 Operates only on 2025-03-02
Dom 09:00 Orlando (MCO) B 11:41 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:41 Operates only on 2025-01-26
Seg 09:00 Orlando (MCO) B 11:48 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:48 Operates only on 2025-03-17
Dom 09:15 Orlando (MCO) B 11:56 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:41 Operates only on 2025-02-02
Dom 09:40 Orlando (MCO) B 12:28 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 350 Non-stop Boeing 737-800 (738) 3:48 Operates only on 2025-03-30
prev   1 2 3 ... 7 8 9 10 11 12 13 14 15 16   next


Todas as companhias a voar a partir de Orlando (MCO) a Minneapolis/Saint Paul (MSP).
Seleccionar data do voo:
PLANEAR VOO
Voos Directos:

Operates only on 2025-03-31
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 3:44, non-stop
Boeing 737-800 (738)

Effective 2025-01-30 through 2025-02-03
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-23
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 3:44, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-20
Seg
-
Ter
-
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Duration: 3:44, non-stop
Boeing 737-800 (738)

Effective 2025-01-13 through 2025-01-17
Seg
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 3:38, non-stop
Boeing 737-800 (738)

Effective 2025-02-20 through 2025-02-26
Seg
-
Ter
-
Qua
Qui
Sex
-
Sáb
-
Dom
-
Duration: 3:44, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-19
Seg
-
Ter
-
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 3:44, non-stop
Boeing 737-800 (738)

Effective 2025-04-05 through 2025-04-06
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
Duration: 3:44, non-stop
Boeing 737-800 (738)

Operates only on 2024-12-25
Seg
-
Ter
-
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 3:36, non-stop
Boeing 737-800 (738)

Effective 2025-02-21 through 2025-02-28
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 3:44, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Operates only on 2025-03-28
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 3:44, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Operates only on 2025-02-09
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-01-24
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 3:38, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Operates only on 2025-02-14
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 3:38, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Operates only on 2025-03-14
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 3:44, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Operates only on 2025-03-21
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 3:44, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Operates only on 2025-02-03
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 3:41, non-stop
Boeing 737-800 (738)

Effective 2025-01-31 through 2025-02-06
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 3:41, non-stop
Boeing 737-800 (738)

Effective 2025-02-09 through 2025-02-14
Seg
-
Ter
-
Qua
Qui
-
Sex
Sáb
-
Dom
Duration: 3:41, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-18
Seg
-
Ter
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 3:41, non-stop
Boeing 737-800 (738)

Effective 2025-02-21 through 2025-02-22
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
Dom
-
Duration: 3:48, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-14
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 3:48, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-28
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 3:48, non-stop
Boeing 737-800 (738)

Operates only on 2024-12-23
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 3:36, non-stop
Boeing 737-800 (738)

Effective 2025-02-11 through 2025-02-13
Seg
-
Ter
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Duration: 3:41, non-stop
Boeing 737-800 (738)

Effective 2025-02-20 through 2025-02-24
Seg
Ter
-
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Duration: 3:48, non-stop
Boeing 737-800 (738)

Effective 2025-03-01 through 2025-03-08
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
Dom
-
Duration: 3:48, non-stop
Boeing 737-800 (738)

Operates only on 2024-12-29
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 3:36, non-stop
Boeing 737-800 (738)

Effective 2024-12-21 through 2024-12-22
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
Duration: 3:36, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-23
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 3:48, non-stop
Boeing 737-800 (738)

Effective 2025-03-09 through 2025-03-15
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
Duration: 3:48, non-stop
Boeing 737-800 (738)

Effective 2025-03-22 through 2025-03-29
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 3:48, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-08
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 3:41, non-stop
Boeing 737-800 (738)

Effective 2025-03-10 through 2025-03-16
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 3:48, non-stop
Boeing 737-800 (738)

Effective 2025-03-23 through 2025-03-24
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 3:48, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-31
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 3:48, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-10
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 3:41, non-stop
Boeing 737-800 (738)

Operates only on 2024-12-15
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-28
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 3:48, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 3:41, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-15
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 3:41, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-07
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 3:41, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-03
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 3:48, non-stop
Boeing 737-800 (738)

Operates only on 2024-12-24
Seg
-
Ter
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 3:36, non-stop
Boeing 737-800 (738)

Operates only on 2024-12-07
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 3:38, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-02
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 3:48, non-stop
Boeing 737-800 (738)

Operates only on 2025-01-26
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 3:41, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-17
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 3:48, non-stop
Boeing 737-800 (738)

Operates only on 2025-02-02
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 3:41, non-stop
Boeing 737-800 (738)

Operates only on 2025-03-30
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 3:48, non-stop
Boeing 737-800 (738)
prev        Page 10 / 16        next
  • Uma rota doméstica com partida no aeroporto Orlando (MCO) e chegada no aeroporto Minneapolis/Saint Paul (MSP).
  • O voo tem uma distância de 1310 milhas, ou 2108 km.
  • O fuso horário no aeroporto de partida é UTC-5 , e o fuso horário do aeroporto de chegada é UTC-6 . A hora atual no ponto de partida é (loading...), e (loading...) no ponto de chegada. Há uma diferença horária de (loading...) horas entre os aeroportos.
  • Para voos diretos, o tempo de voo varia entre 3:27 e 3:56.