Todas as companhias a voar a partir de Istanbul (IST) a Mexico City Benito Juarez (MEX).

Seleccionar data do voo:
PLANEAR VOO
Voos Directos:
Seg,Qui,Sáb 01:45 Istanbul (IST) 07:00 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 181 Non-stop Boeing 787-9 (789) 14:15 Effective 2026-03-30 through 2026-06-06
Seg 01:45 Istanbul (IST) 07:00 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 181 Non-stop Boeing 777-300ER (77W) 14:15 Operates only on 2026-06-08
Seg,Qui,Sáb 01:45 Istanbul (IST) 07:00 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 181 Non-stop Boeing 787-9 (789) 14:15 Effective 2026-06-11 through 2026-10-24
Seg,Qui,Sáb 01:50 Istanbul (IST) 07:35 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 181 Non-stop Boeing 787-9 (789) 14:45 Effective from 2026-10-26
Seg,Qui,Sáb 02:15 Istanbul (IST) 08:00 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 181 Non-stop Boeing 787-9 (789) 14:45 Valid until 2026-03-28
Ter 01:45 Istanbul (IST) 07:00 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 182 Non-stop Boeing 787-9 (789) 14:15 Effective 2026-03-31 through 2026-06-02
Ter 01:45 Istanbul (IST) 07:00 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 182 Non-stop Boeing 777-300ER (77W) 14:15 Operates only on 2026-06-09
Ter 01:45 Istanbul (IST) 07:00 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 182 Non-stop Boeing 787-9 (789) 14:15 Effective 2026-06-16 through 2026-10-20
Ter 01:50 Istanbul (IST) 07:35 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 182 Non-stop Boeing 787-9 (789) 14:45 Effective from 2026-10-27
Ter 02:15 Istanbul (IST) 08:00 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 182 Non-stop Boeing 787-9 (789) 14:45 Valid until 2026-03-24
Qua,Sex,Dom 01:45 Istanbul (IST) 07:00 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 184 Non-stop Boeing 787-9 (789) 14:15 Effective 2026-04-01 through 2026-06-07
Qua 01:45 Istanbul (IST) 07:00 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 184 Non-stop Boeing 777-300ER (77W) 14:15 Operates only on 2026-06-10
Qua,Sex,Dom 01:45 Istanbul (IST) 07:00 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 184 Non-stop Boeing 787-9 (789) 14:15 Effective 2026-06-12 through 2026-10-25
Qua,Sex,Dom 01:50 Istanbul (IST) 07:35 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 184 Non-stop Boeing 787-9 (789) 14:45 Effective from 2026-10-28
Qua,Sex,Dom 02:15 Istanbul (IST) 08:00 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 184 Non-stop Boeing 787-9 (789) 14:45 Valid until 2026-03-29
Qua 20:25 Istanbul (IST) 01:40 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 189 Non-stop Boeing 777-300ER (77W) 14:15 Operates only on 2026-06-10
The flight arrives 1 day after departure.
Sex,Dom 20:35 Istanbul (IST) 01:50 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 189 Non-stop Boeing 787-9 (789) 14:15 Effective 2026-03-29 through 2026-10-23
The flight arrives 1 day after departure.
Qua,Dom 22:00 Istanbul (IST) 03:45 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 189 Non-stop Boeing 787-9 (789) 14:45 Valid until 2026-03-25
The flight arrives 1 day after departure.
Qua,Dom 22:00 Istanbul (IST) 03:45 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 189 Non-stop Boeing 787-9 (789) 14:45 Effective from 2026-10-25
The flight arrives 1 day after departure.
Seg 20:15 Istanbul (IST) 01:35 Mexico City Benito Juarez (MEX) 1
Turkish Airlines TK 190 Non-stop Boeing 777-300ER (77W) 14:20 Operates only on 2026-06-08
The flight arrives 1 day after departure.
Voos Não-Directos:
Ter 17:10 Istanbul (IST) 02:50 Mexico City Benito Juarez (MEX)
Turkish Airlines TK 6361 1-stop Boeing 777-200 Freighter (77X) 18:40
The flight arrives 1 day after departure.
This is a Scheduled Cargo flight.
Dom 16:35 Istanbul (IST) 02:15 Mexico City Benito Juarez (MEX)
Turkish Airlines TK 6435 1-stop Boeing 777-200 Freighter (77X) 18:40 Effective from 2026-01-04
The flight arrives 1 day after departure.
This is a Scheduled Cargo flight.


Todas as companhias a voar a partir de Istanbul (IST) a Mexico City Benito Juarez (MEX).
Seleccionar data do voo:
PLANEAR VOO
Voos Directos:

Effective 2026-03-30 through 2026-06-06
Seg
Ter
-
Qua
-
Qui
Sex
-
Sáb
Dom
-
Duration: 14:15, non-stop
Boeing 787-9 (789)

Voos Directos:

Operates only on 2026-06-08
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 14:15, non-stop
Boeing 777-300ER (77W)

Voos Directos:

Effective 2026-06-11 through 2026-10-24
Seg
Ter
-
Qua
-
Qui
Sex
-
Sáb
Dom
-
Duration: 14:15, non-stop
Boeing 787-9 (789)

Voos Directos:

Effective from 2026-10-26
Seg
Ter
-
Qua
-
Qui
Sex
-
Sáb
Dom
-
Duration: 14:45, non-stop
Boeing 787-9 (789)

Voos Directos:

Valid until 2026-03-28
Seg
Ter
-
Qua
-
Qui
Sex
-
Sáb
Dom
-
Duration: 14:45, non-stop
Boeing 787-9 (789)

Voos Directos:

Effective 2026-03-31 through 2026-06-02
Seg
-
Ter
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 14:15, non-stop
Boeing 787-9 (789)

Voos Directos:

Operates only on 2026-06-09
Seg
-
Ter
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 14:15, non-stop
Boeing 777-300ER (77W)

Voos Directos:

Effective 2026-06-16 through 2026-10-20
Seg
-
Ter
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 14:15, non-stop
Boeing 787-9 (789)

Voos Directos:

Effective from 2026-10-27
Seg
-
Ter
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 14:45, non-stop
Boeing 787-9 (789)

Voos Directos:

Valid until 2026-03-24
Seg
-
Ter
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 14:45, non-stop
Boeing 787-9 (789)

Voos Directos:

Effective 2026-04-01 through 2026-06-07
Seg
-
Ter
-
Qua
Qui
-
Sex
Sáb
-
Dom
Duration: 14:15, non-stop
Boeing 787-9 (789)

Voos Directos:

Operates only on 2026-06-10
Seg
-
Ter
-
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 14:15, non-stop
Boeing 777-300ER (77W)

Voos Directos:

Effective 2026-06-12 through 2026-10-25
Seg
-
Ter
-
Qua
Qui
-
Sex
Sáb
-
Dom
Duration: 14:15, non-stop
Boeing 787-9 (789)

Voos Directos:

Effective from 2026-10-28
Seg
-
Ter
-
Qua
Qui
-
Sex
Sáb
-
Dom
Duration: 14:45, non-stop
Boeing 787-9 (789)

Voos Directos:

Valid until 2026-03-29
Seg
-
Ter
-
Qua
Qui
-
Sex
Sáb
-
Dom
Duration: 14:45, non-stop
Boeing 787-9 (789)

Voos Directos:

Operates only on 2026-06-10
Seg
-
Ter
-
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 14:15, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Voos Directos:

Effective 2026-03-29 through 2026-10-23
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
Duration: 14:15, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Voos Directos:

Valid until 2026-03-25
Seg
-
Ter
-
Qua
Qui
-
Sex
-
Sáb
-
Dom
Duration: 14:45, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Voos Directos:

Effective from 2026-10-25
Seg
-
Ter
-
Qua
Qui
-
Sex
-
Sáb
-
Dom
Duration: 14:45, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Voos Directos:

Operates only on 2026-06-08
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 14:20, non-stop
Boeing 777-300ER (77W)
The flight arrives 1 day after departure.

Voos Não-Directos:

This is a Scheduled Cargo flight.
Seg
-
Ter
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 18:40, 1-stop
Boeing 777-200 Freighter (77X)
The flight arrives 1 day after departure.

Voos Não-Directos:

Effective from 2026-01-04
This is a Scheduled Cargo flight.
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 18:40, 1-stop
Boeing 777-200 Freighter (77X)
The flight arrives 1 day after departure.
  • Uma rota internacional com partida no aeroporto Istanbul, Turkey (IST), e chegada no aeroporto Mexico City Benito Juarez, Mexico (MEX).
  • O voo tem uma distância de 7072 milhas, ou 11382 km.
  • O fuso horário no aeroporto de partida é UTC+3 , e o fuso horário do aeroporto de chegada é UTC-6 . A hora atual no ponto de partida é (loading...), e (loading...) no ponto de chegada. Há uma diferença horária de (loading...) horas entre os aeroportos.
  • Para voos diretos, o tempo de voo varia entre 14:15 e 14:45.