Todas as companhias a voar a partir de Guadalajara (GDL) a Sacramento (SMF).

Seleccionar data do voo:
PLANEAR VOO
Voos Directos:
Diariamente 19:27 Guadalajara (GDL) 1 22:41 Sacramento (SMF) B
Aeromexico AM 788 Non-stop Boeing 737 MAX 8 (7M8) 4:14 Effective 2026-03-08 through 2026-03-28
Diariamente 19:47 Guadalajara (GDL) 1 22:55 Sacramento (SMF) B
Aeromexico AM 788 Non-stop Boeing 737 MAX 8 (7M8) 4:08 Effective 2026-03-29 through 2026-10-25
Diariamente 20:27 Guadalajara (GDL) 1 22:41 Sacramento (SMF) B
Aeromexico AM 788 Non-stop Boeing 737 MAX 8 (7M8) 4:14 Effective 2026-01-12 through 2026-01-31
Seg-Sáb 20:27 Guadalajara (GDL) 1 23:41 Sacramento (SMF) B
Aeromexico AM 788 Non-stop Boeing 737 MAX 8 (7M8) 4:14 Effective from 2026-10-26
Seg-Qua,Dom 20:30 Guadalajara (GDL) 1 22:44 Sacramento (SMF) B
Aeromexico AM 788 Non-stop Boeing 737 MAX 8 (7M8) 4:14 Effective 2026-02-01 through 2026-02-04
Diariamente 20:30 Guadalajara (GDL) 1 22:50 Sacramento (SMF) B
Aeromexico AM 788 Non-stop Boeing 737 MAX 8 (7M8) 4:20 Effective 2026-02-05 through 2026-03-07
Seg-Sáb 20:37 Guadalajara (GDL) 1 22:55 Sacramento (SMF) B
Aeromexico AM 788 Non-stop Boeing 737-800 (7S8) 4:18 Effective 2026-01-05 through 2026-01-10
Dom 20:37 Guadalajara (GDL) 1 22:55 Sacramento (SMF) B
Aeromexico AM 788 Non-stop Boeing 737 MAX 9 (7M9) 4:18 Operates only on 2026-01-11
Diariamente 20:40 Guadalajara (GDL) 1 22:55 Sacramento (SMF) B
Aeromexico AM 788 Non-stop Boeing 737-800 (7S8) 4:15 Valid until 2026-01-04
Diariamente 18:43 Guadalajara (GDL) 1 21:00 Sacramento (SMF) B
Aeromexico AM 1788 Non-stop Boeing 737-800 (7S8) 4:17 Valid until 2026-01-04
Seg,Qua,Sex,Dom 18:34 Guadalajara (GDL) 1 21:45 Sacramento (SMF)
Volaris Y4 1810 Non-stop Airbus A321neo (32Q) 4:11 Effective 2026-03-08 through 2026-03-27
Qua,Sex 19:24 Guadalajara (GDL) 1 21:35 Sacramento (SMF)
Volaris Y4 1810 Non-stop Airbus A321neo (32Q) 4:11 Effective 2026-01-02 through 2026-01-07
Sex,Dom 19:24 Guadalajara (GDL) 1 21:35 Sacramento (SMF)
Volaris Y4 1810 Non-stop Airbus A321 (321) 4:11 Effective 2026-01-04 through 2026-01-11
Seg 19:24 Guadalajara (GDL) 1 21:35 Sacramento (SMF)
Volaris Y4 1810 Non-stop Airbus A320 (320) 4:11 Operates only on 2026-01-05
Ter 19:24 Guadalajara (GDL) 1 21:35 Sacramento (SMF)
Volaris Y4 1810 Non-stop Airbus A320neo (32N) 4:11 Operates only on 2026-01-06
Seg,Qua,Sex,Dom 19:24 Guadalajara (GDL) 1 21:35 Sacramento (SMF)
Volaris Y4 1810 Non-stop Airbus A321neo (32Q) 4:11 Effective 2026-01-12 through 2026-01-30
Ter,Qui 19:34 Guadalajara (GDL) 1 21:45 Sacramento (SMF)
Volaris Y4 1810 Non-stop Airbus A320neo (32N) 4:11 Valid until 2026-01-01
Seg,Qua,Sex,Dom 19:34 Guadalajara (GDL) 1 21:45 Sacramento (SMF)
Volaris Y4 1810 Non-stop Airbus A321neo (32Q) 4:11 Effective 2026-02-01 through 2026-03-06
Seg,Qua,Sex,Dom 19:46 Guadalajara (GDL) 1 22:44 Sacramento (SMF)
Volaris Y4 1810 Non-stop Airbus A320 (320) 3:58 Effective from 2026-03-29
Seg-Sex,Dom 20:04 Guadalajara (GDL) 1 23:15 Sacramento (SMF)
Volaris Y4 1812 Non-stop Airbus A320 (320) 4:11 Effective 2026-03-08 through 2026-03-27
Seg-Sex,Dom 20:51 Guadalajara (GDL) 1 23:49 Sacramento (SMF)
Volaris Y4 1812 Non-stop Airbus A320 (320) 3:58 Effective from 2026-03-29
Seg-Sex,Dom 21:04 Guadalajara (GDL) 1 23:15 Sacramento (SMF)
Volaris Y4 1812 Non-stop Airbus A321neo (32Q) 4:11 Valid until 2026-01-06
Ter,Qua,Dom 21:04 Guadalajara (GDL) 1 23:15 Sacramento (SMF)
Volaris Y4 1812 Non-stop Airbus A321 (321) 4:11 Effective 2026-01-07 through 2026-01-14
Seg,Qui,Sex 21:04 Guadalajara (GDL) 1 23:15 Sacramento (SMF)
Volaris Y4 1812 Non-stop Airbus A321neo (32Q) 4:11 Effective 2026-01-08 through 2026-01-12
Ter-Sex 21:04 Guadalajara (GDL) 1 23:15 Sacramento (SMF)
Volaris Y4 1812 Non-stop Airbus A321 (321) 4:11 Effective 2026-01-15 through 2026-01-22
Seg,Sex,Dom 21:04 Guadalajara (GDL) 1 23:15 Sacramento (SMF)
Volaris Y4 1812 Non-stop Airbus A321neo (32Q) 4:11 Effective 2026-01-18 through 2026-01-26
Seg,Ter,Sex,Dom 21:04 Guadalajara (GDL) 1 23:15 Sacramento (SMF)
Volaris Y4 1812 Non-stop Airbus A321neo (32Q) 4:11 Effective 2026-01-27 through 2026-02-03
Qua,Qui 21:04 Guadalajara (GDL) 1 23:15 Sacramento (SMF)
Volaris Y4 1812 Non-stop Airbus A321 (321) 4:11 Effective 2026-01-28 through 2026-01-29
Seg-Sex,Dom 21:04 Guadalajara (GDL) 1 23:15 Sacramento (SMF)
Volaris Y4 1812 Non-stop Airbus A321neo (32Q) 4:11 Effective 2026-02-04 through 2026-03-06
Sáb 18:20 Guadalajara (GDL) 1 21:31 Sacramento (SMF)
Volaris Y4 1814 Non-stop Airbus A320 (320) 4:11 Effective 2026-03-14 through 2026-03-28
Sáb 19:20 Guadalajara (GDL) 1 21:31 Sacramento (SMF)
Volaris Y4 1814 Non-stop Airbus A320neo (32N) 4:11 Valid until 2026-01-03
Sáb 19:20 Guadalajara (GDL) 1 21:31 Sacramento (SMF)
Volaris Y4 1814 Non-stop Airbus A320 (320) 4:11 Operates only on 2026-01-10
Sáb 19:20 Guadalajara (GDL) 1 21:31 Sacramento (SMF)
Volaris Y4 1814 Non-stop Airbus A321neo (32Q) 4:11 Effective 2026-01-17 through 2026-03-07
Sáb 19:31 Guadalajara (GDL) 1 22:29 Sacramento (SMF)
Volaris Y4 1814 Non-stop Airbus A320neo (32N) 3:58 Effective from 2026-04-04
Ter 20:22 Guadalajara (GDL) 1 22:33 Sacramento (SMF)
Volaris Y4 5734 Non-stop Airbus A321 (321) 4:11 Operates only on 2026-01-06
Qui 19:34 Guadalajara (GDL) 1 21:45 Sacramento (SMF)
Volaris Y4 5796 Non-stop Airbus A320 (320) 4:11 Operates only on 2026-01-08
Voos Codeshare Directos:
Seg,Qua,Sex,Dom 18:34 Guadalajara (GDL) 21:45 Sacramento (SMF)
Frontier Airlines F9 6810 Non-stop Airbus A321 (321) 4:11 Effective 2026-03-08 through 2026-03-27
Codeshare flight, operated by Volaris.(Y4 1810)
Qua,Sex,Dom 19:24 Guadalajara (GDL) 21:35 Sacramento (SMF)
Frontier Airlines F9 6810 Non-stop Airbus A321 (321) 4:11 Effective 2026-01-02 through 2026-01-11
Codeshare flight, operated by Volaris.(Y4 1810)
Seg,Ter 19:24 Guadalajara (GDL) 21:35 Sacramento (SMF)
Frontier Airlines F9 6810 Non-stop Airbus A320 (320) 4:11 Effective 2026-01-05 through 2026-01-06
Codeshare flight, operated by Volaris.(Y4 1810)
Seg,Qua,Sex,Dom 19:24 Guadalajara (GDL) 21:35 Sacramento (SMF)
Frontier Airlines F9 6810 Non-stop Airbus A321 (321) 4:11 Effective 2026-01-12 through 2026-01-30
Codeshare flight, operated by Volaris.(Y4 1810)
Ter,Qui 19:34 Guadalajara (GDL) 21:45 Sacramento (SMF)
Frontier Airlines F9 6810 Non-stop Airbus A320 (320) 4:11 Valid until 2026-01-01
Codeshare flight, operated by Volaris.(Y4 1810)
Seg,Qua,Sex,Dom 19:34 Guadalajara (GDL) 21:45 Sacramento (SMF)
Frontier Airlines F9 6810 Non-stop Airbus A321 (321) 4:11 Effective 2026-02-01 through 2026-03-06
Codeshare flight, operated by Volaris.(Y4 1810)
Seg,Qua,Sex,Dom 19:46 Guadalajara (GDL) 22:44 Sacramento (SMF)
Frontier Airlines F9 6810 Non-stop Airbus A320 (320) 3:58 Effective 2026-03-29 through 2026-04-13
Codeshare flight, operated by Volaris.(Y4 1810)
Seg-Sex,Dom 20:04 Guadalajara (GDL) 23:15 Sacramento (SMF)
Frontier Airlines F9 6812 Non-stop Airbus A320 (320) 4:11 Effective 2026-03-08 through 2026-03-27
Codeshare flight, operated by Volaris.(Y4 1812)
Seg-Sex,Dom 20:51 Guadalajara (GDL) 23:49 Sacramento (SMF)
Frontier Airlines F9 6812 Non-stop Airbus A320 (320) 3:58 Effective 2026-03-29 through 2026-04-13
Codeshare flight, operated by Volaris.(Y4 1812)
Seg-Sex,Dom 21:04 Guadalajara (GDL) 23:15 Sacramento (SMF)
Frontier Airlines F9 6812 Non-stop Airbus A321 (321) 4:11 Valid until 2026-03-06
Codeshare flight, operated by Volaris.(Y4 1812)
Sáb 18:20 Guadalajara (GDL) 21:31 Sacramento (SMF)
Frontier Airlines F9 6814 Non-stop Airbus A320 (320) 4:11 Effective 2026-03-14 through 2026-03-28
Codeshare flight, operated by Volaris.(Y4 1814)
Sáb 19:20 Guadalajara (GDL) 21:31 Sacramento (SMF)
Frontier Airlines F9 6814 Non-stop Airbus A320 (320) 4:11 Valid until 2026-01-10
Codeshare flight, operated by Volaris.(Y4 1814)
Sáb 19:20 Guadalajara (GDL) 21:31 Sacramento (SMF)
Frontier Airlines F9 6814 Non-stop Airbus A321 (321) 4:11 Effective 2026-01-17 through 2026-03-07
Codeshare flight, operated by Volaris.(Y4 1814)
Sáb 19:31 Guadalajara (GDL) 22:29 Sacramento (SMF)
Frontier Airlines F9 6814 Non-stop Airbus A320 (320) 3:58 Effective 2026-04-04 through 2026-04-11
Codeshare flight, operated by Volaris.(Y4 1814)
1 2   next


Todas as companhias a voar a partir de Guadalajara (GDL) a Sacramento (SMF).
Seleccionar data do voo:
PLANEAR VOO
Voos Directos:

Effective 2026-03-08 through 2026-03-28
Seg
Ter
Qua
Qui
Sex
Sáb
Dom
Duration: 4:14, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-03-29 through 2026-10-25
Seg
Ter
Qua
Qui
Sex
Sáb
Dom
Duration: 4:08, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-01-12 through 2026-01-31
Seg
Ter
Qua
Qui
Sex
Sáb
Dom
Duration: 4:14, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective from 2026-10-26
Seg
Ter
Qua
Qui
Sex
Sáb
Dom
-
Duration: 4:14, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-02-01 through 2026-02-04
Seg
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
Duration: 4:14, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-02-05 through 2026-03-07
Seg
Ter
Qua
Qui
Sex
Sáb
Dom
Duration: 4:20, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-01-05 through 2026-01-10
Seg
Ter
Qua
Qui
Sex
Sáb
Dom
-
Duration: 4:18, non-stop
Boeing 737-800 (7S8)

Voos Directos:

Operates only on 2026-01-11
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 4:18, non-stop
Boeing 737 MAX 9 (7M9)

Voos Directos:

Valid until 2026-01-04
Seg
Ter
Qua
Qui
Sex
Sáb
Dom
Duration: 4:15, non-stop
Boeing 737-800 (7S8)

Voos Directos:

Valid until 2026-01-04
Seg
Ter
Qua
Qui
Sex
Sáb
Dom
Duration: 4:17, non-stop
Boeing 737-800 (7S8)

Voos Directos:

Effective 2026-03-08 through 2026-03-27
Seg
Ter
-
Qua
Qui
-
Sex
Sáb
-
Dom
Duration: 4:11, non-stop
Airbus A321neo (32Q)

Voos Directos:

Effective 2026-01-02 through 2026-01-07
Seg
-
Ter
-
Qua
Qui
-
Sex
Sáb
-
Dom
-
Duration: 4:11, non-stop
Airbus A321neo (32Q)

Voos Directos:

Effective 2026-01-04 through 2026-01-11
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
Duration: 4:11, non-stop
Airbus A321 (321)

Voos Directos:

Operates only on 2026-01-05
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:11, non-stop
Airbus A320 (320)

Voos Directos:

Operates only on 2026-01-06
Seg
-
Ter
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:11, non-stop
Airbus A320neo (32N)

Voos Directos:

Effective 2026-01-12 through 2026-01-30
Seg
Ter
-
Qua
Qui
-
Sex
Sáb
-
Dom
Duration: 4:11, non-stop
Airbus A321neo (32Q)

Voos Directos:

Valid until 2026-01-01
Seg
-
Ter
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Duration: 4:11, non-stop
Airbus A320neo (32N)

Voos Directos:

Effective 2026-02-01 through 2026-03-06
Seg
Ter
-
Qua
Qui
-
Sex
Sáb
-
Dom
Duration: 4:11, non-stop
Airbus A321neo (32Q)

Voos Directos:

Effective from 2026-03-29
Seg
Ter
-
Qua
Qui
-
Sex
Sáb
-
Dom
Duration: 3:58, non-stop
Airbus A320 (320)

Voos Directos:

Effective 2026-03-08 through 2026-03-27
Seg
Ter
Qua
Qui
Sex
Sáb
-
Dom
Duration: 4:11, non-stop
Airbus A320 (320)

Voos Directos:

Effective from 2026-03-29
Seg
Ter
Qua
Qui
Sex
Sáb
-
Dom
Duration: 3:58, non-stop
Airbus A320 (320)

Voos Directos:

Valid until 2026-01-06
Seg
Ter
Qua
Qui
Sex
Sáb
-
Dom
Duration: 4:11, non-stop
Airbus A321neo (32Q)

Voos Directos:

Effective 2026-01-07 through 2026-01-14
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
Duration: 4:11, non-stop
Airbus A321 (321)

Voos Directos:

Effective 2026-01-08 through 2026-01-12
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 4:11, non-stop
Airbus A321neo (32Q)

Voos Directos:

Effective 2026-01-15 through 2026-01-22
Seg
-
Ter
Qua
Qui
Sex
Sáb
-
Dom
-
Duration: 4:11, non-stop
Airbus A321 (321)

Voos Directos:

Effective 2026-01-18 through 2026-01-26
Seg
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
Duration: 4:11, non-stop
Airbus A321neo (32Q)

Voos Directos:

Effective 2026-01-27 through 2026-02-03
Seg
Ter
Qua
-
Qui
-
Sex
Sáb
-
Dom
Duration: 4:11, non-stop
Airbus A321neo (32Q)

Voos Directos:

Effective 2026-01-28 through 2026-01-29
Seg
-
Ter
-
Qua
Qui
Sex
-
Sáb
-
Dom
-
Duration: 4:11, non-stop
Airbus A321 (321)

Voos Directos:

Effective 2026-02-04 through 2026-03-06
Seg
Ter
Qua
Qui
Sex
Sáb
-
Dom
Duration: 4:11, non-stop
Airbus A321neo (32Q)

Voos Directos:

Effective 2026-03-14 through 2026-03-28
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 4:11, non-stop
Airbus A320 (320)

Voos Directos:

Valid until 2026-01-03
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 4:11, non-stop
Airbus A320neo (32N)

Voos Directos:

Operates only on 2026-01-10
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 4:11, non-stop
Airbus A320 (320)

Voos Directos:

Effective 2026-01-17 through 2026-03-07
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 4:11, non-stop
Airbus A321neo (32Q)

Voos Directos:

Effective from 2026-04-04
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 3:58, non-stop
Airbus A320neo (32N)

Voos Directos:

Operates only on 2026-01-06
Seg
-
Ter
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:11, non-stop
Airbus A321 (321)

Voos Directos:

Operates only on 2026-01-08
Seg
-
Ter
-
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Duration: 4:11, non-stop
Airbus A320 (320)

Voos Codeshare Directos:

Effective 2026-03-08 through 2026-03-27
Seg
Ter
-
Qua
Qui
-
Sex
Sáb
-
Dom
Codeshare flight, operated by Volaris. (Y4 1810)
Duration: 4:11, non-stop
Airbus A321 (321)

Voos Codeshare Directos:

Effective 2026-01-02 through 2026-01-11
Seg
-
Ter
-
Qua
Qui
-
Sex
Sáb
-
Dom
Codeshare flight, operated by Volaris. (Y4 1810)
Duration: 4:11, non-stop
Airbus A321 (321)

Voos Codeshare Directos:

Effective 2026-01-05 through 2026-01-06
Seg
Ter
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Volaris. (Y4 1810)
Duration: 4:11, non-stop
Airbus A320 (320)

Voos Codeshare Directos:

Effective 2026-01-12 through 2026-01-30
Seg
Ter
-
Qua
Qui
-
Sex
Sáb
-
Dom
Codeshare flight, operated by Volaris. (Y4 1810)
Duration: 4:11, non-stop
Airbus A321 (321)

Voos Codeshare Directos:

Valid until 2026-01-01
Seg
-
Ter
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Volaris. (Y4 1810)
Duration: 4:11, non-stop
Airbus A320 (320)

Voos Codeshare Directos:

Effective 2026-02-01 through 2026-03-06
Seg
Ter
-
Qua
Qui
-
Sex
Sáb
-
Dom
Codeshare flight, operated by Volaris. (Y4 1810)
Duration: 4:11, non-stop
Airbus A321 (321)

Voos Codeshare Directos:

Effective 2026-03-29 through 2026-04-13
Seg
Ter
-
Qua
Qui
-
Sex
Sáb
-
Dom
Codeshare flight, operated by Volaris. (Y4 1810)
Duration: 3:58, non-stop
Airbus A320 (320)

Voos Codeshare Directos:

Effective 2026-03-08 through 2026-03-27
Seg
Ter
Qua
Qui
Sex
Sáb
-
Dom
Codeshare flight, operated by Volaris. (Y4 1812)
Duration: 4:11, non-stop
Airbus A320 (320)

Voos Codeshare Directos:

Effective 2026-03-29 through 2026-04-13
Seg
Ter
Qua
Qui
Sex
Sáb
-
Dom
Codeshare flight, operated by Volaris. (Y4 1812)
Duration: 3:58, non-stop
Airbus A320 (320)

Voos Codeshare Directos:

Valid until 2026-03-06
Seg
Ter
Qua
Qui
Sex
Sáb
-
Dom
Codeshare flight, operated by Volaris. (Y4 1812)
Duration: 4:11, non-stop
Airbus A321 (321)

Voos Codeshare Directos:

Effective 2026-03-14 through 2026-03-28
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Codeshare flight, operated by Volaris. (Y4 1814)
Duration: 4:11, non-stop
Airbus A320 (320)

Voos Codeshare Directos:

Valid until 2026-01-10
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Codeshare flight, operated by Volaris. (Y4 1814)
Duration: 4:11, non-stop
Airbus A320 (320)

Voos Codeshare Directos:

Effective 2026-01-17 through 2026-03-07
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Codeshare flight, operated by Volaris. (Y4 1814)
Duration: 4:11, non-stop
Airbus A321 (321)

Voos Codeshare Directos:

Effective 2026-04-04 through 2026-04-11
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Codeshare flight, operated by Volaris. (Y4 1814)
Duration: 3:58, non-stop
Airbus A320 (320)
Page 1 / 2        next
  • Uma rota internacional com partida no aeroporto Guadalajara, Mexico (GDL), e chegada no aeroporto Sacramento, United States (SMF).
  • O voo tem uma distância de 1660 milhas, ou 2672 km.
  • O fuso horário no aeroporto de partida é UTC-6 , e o fuso horário do aeroporto de chegada é UTC-8 . A hora atual no ponto de partida é (loading...), e (loading...) no ponto de chegada. Há uma diferença horária de (loading...) horas entre os aeroportos.
  • Para voos diretos, o tempo de voo varia entre 3:58 e 4:20.