Todas as companhias a voar a partir de Nashville (BNA) a Savannah (SAV).

Seleccionar data do voo:
PLANEAR VOO
Voos Directos:
Ter,Qua 10:00 Nashville (BNA) 12:30 Savannah (SAV)
Southwest Airlines WN 2087 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-04-07 through 2026-06-03
Sáb 09:35 Nashville (BNA) 12:05 Savannah (SAV)
Southwest Airlines WN 2446 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-04-11 through 2026-05-30
Dom 09:40 Nashville (BNA) 12:10 Savannah (SAV)
Southwest Airlines WN 2446 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-04-12 through 2026-05-17
Dom 09:40 Nashville (BNA) 12:10 Savannah (SAV)
Southwest Airlines WN 2446 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Operates only on 2026-05-31
Dom 11:05 Nashville (BNA) 13:30 Savannah (SAV)
Southwest Airlines WN 2446 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Operates only on 2026-05-24
Seg 16:30 Nashville (BNA) 18:55 Savannah (SAV)
Southwest Airlines WN 2655 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2026-01-05
Seg,Qui,Sex 15:15 Nashville (BNA) 17:40 Savannah (SAV)
Southwest Airlines WN 2894 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2026-08-06 through 2026-09-28
Qui,Sex,Dom 14:10 Nashville (BNA) 16:40 Savannah (SAV)
Southwest Airlines WN 3027 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-01-11 through 2026-01-16
Seg,Dom 14:10 Nashville (BNA) 16:40 Savannah (SAV)
Southwest Airlines WN 3027 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-01-19 through 2026-01-25
Qui,Sex,Dom 14:10 Nashville (BNA) 16:40 Savannah (SAV)
Southwest Airlines WN 3027 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-02-01 through 2026-02-06
Seg,Dom 14:10 Nashville (BNA) 16:40 Savannah (SAV)
Southwest Airlines WN 3027 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-02-09 through 2026-02-15
Seg,Ter,Qui 14:10 Nashville (BNA) 16:40 Savannah (SAV)
Southwest Airlines WN 3027 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-02-17 through 2026-02-23
Seg 14:10 Nashville (BNA) 16:40 Savannah (SAV)
Southwest Airlines WN 3027 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Operates only on 2026-03-02
Ter,Qua 15:00 Nashville (BNA) 17:30 Savannah (SAV)
Southwest Airlines WN 3101 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2026-03-10 through 2026-04-01
Ter,Qua 09:45 Nashville (BNA) 12:15 Savannah (SAV)
Southwest Airlines WN 3276 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-03-10 through 2026-04-01
Seg,Qui,Sex 16:40 Nashville (BNA) 19:05 Savannah (SAV)
Southwest Airlines WN 3276 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2026-03-05 through 2026-04-06
Ter,Qua 15:00 Nashville (BNA) 17:25 Savannah (SAV)
Southwest Airlines WN 3312 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-04-07 through 2026-06-03
Seg,Qui,Sex 16:00 Nashville (BNA) 18:25 Savannah (SAV)
Southwest Airlines WN 3312 Non-stop Boeing 737-800 (73H) 1:25 Effective 2026-04-09 through 2026-06-01
Dom 21:00 Nashville (BNA) 23:30 Savannah (SAV)
Southwest Airlines WN 3321 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-06-07 through 2026-08-02
Dom 16:25 Nashville (BNA) 18:50 Savannah (SAV)
Southwest Airlines WN 3534 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2026-04-12 through 2026-05-17
Dom 16:25 Nashville (BNA) 18:50 Savannah (SAV)
Southwest Airlines WN 3534 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2026-05-31
Sáb 15:30 Nashville (BNA) 17:55 Savannah (SAV)
Southwest Airlines WN 3573 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2026-08-08 through 2026-09-26
Ter,Qua 16:55 Nashville (BNA) 19:25 Savannah (SAV)
Southwest Airlines WN 3573 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-08-04 through 2026-09-30
Seg,Qui,Sex 19:20 Nashville (BNA) 21:50 Savannah (SAV)
Southwest Airlines WN 3573 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2026-08-06 through 2026-09-28
Dom 10:50 Nashville (BNA) 13:15 Savannah (SAV)
Southwest Airlines WN 4319 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-06-07 through 2026-08-02
Seg,Qui,Sex 16:15 Nashville (BNA) 18:40 Savannah (SAV)
Southwest Airlines WN 4529 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-02-12 through 2026-02-16
Qui,Sex,Dom 16:15 Nashville (BNA) 18:40 Savannah (SAV)
Southwest Airlines WN 4529 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-02-20 through 2026-03-01
Sáb 15:35 Nashville (BNA) 18:00 Savannah (SAV)
Southwest Airlines WN 4780 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-01-10 through 2026-02-07
Seg-Sex 16:45 Nashville (BNA) 19:10 Savannah (SAV)
Southwest Airlines WN 4780 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-01-06 through 2026-01-14
Ter-Sex,Dom 16:45 Nashville (BNA) 19:10 Savannah (SAV)
Southwest Airlines WN 4780 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-01-18 through 2026-01-23
Seg-Sex 16:45 Nashville (BNA) 19:10 Savannah (SAV)
Southwest Airlines WN 4780 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-01-26 through 2026-02-04
Ter,Qua,Dom 16:45 Nashville (BNA) 19:10 Savannah (SAV)
Southwest Airlines WN 4780 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-02-08 through 2026-02-11
Ter,Qua 16:45 Nashville (BNA) 19:10 Savannah (SAV)
Southwest Airlines WN 4780 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-02-18 through 2026-03-04
Qui,Sex,Dom 17:30 Nashville (BNA) 20:00 Savannah (SAV)
Southwest Airlines WN 4780 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-01-11 through 2026-01-16
Seg,Dom 17:30 Nashville (BNA) 20:00 Savannah (SAV)
Southwest Airlines WN 4780 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-01-19 through 2026-01-25
Qui,Sex,Dom 17:30 Nashville (BNA) 20:00 Savannah (SAV)
Southwest Airlines WN 4780 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-02-01 through 2026-02-06
Seg,Dom 17:30 Nashville (BNA) 20:00 Savannah (SAV)
Southwest Airlines WN 4780 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-02-09 through 2026-02-15
Seg,Ter,Qui 17:30 Nashville (BNA) 20:00 Savannah (SAV)
Southwest Airlines WN 4780 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-02-17 through 2026-02-23
Seg 17:30 Nashville (BNA) 20:00 Savannah (SAV)
Southwest Airlines WN 4780 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Operates only on 2026-03-02
Sáb 18:55 Nashville (BNA) 21:25 Savannah (SAV)
Southwest Airlines WN 4780 Non-stop Boeing 737-800 (73H) 1:30 Effective 2026-02-14 through 2026-02-28
Seg,Qui,Sex 20:15 Nashville (BNA) 22:40 Savannah (SAV)
Southwest Airlines WN 4780 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-02-12 through 2026-02-16
Qui,Sex,Dom 20:15 Nashville (BNA) 22:40 Savannah (SAV)
Southwest Airlines WN 4780 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-02-20 through 2026-03-01
Dom 15:30 Nashville (BNA) 17:55 Savannah (SAV)
Southwest Airlines WN 5022 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-08-09 through 2026-09-27
prev   1 2


Todas as companhias a voar a partir de Nashville (BNA) a Savannah (SAV).
Seleccionar data do voo:
PLANEAR VOO
Voos Directos:

Effective 2026-04-07 through 2026-06-03
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-04-11 through 2026-05-30
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Voos Directos:

Effective 2026-04-12 through 2026-05-17
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Operates only on 2026-05-31
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Operates only on 2026-05-24
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Operates only on 2026-01-05
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-08-06 through 2026-09-28
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-01-11 through 2026-01-16
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-01-19 through 2026-01-25
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-01 through 2026-02-06
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-09 through 2026-02-15
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-17 through 2026-02-23
Seg
Ter
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Operates only on 2026-03-02
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-03-10 through 2026-04-01
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-03-10 through 2026-04-01
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-03-05 through 2026-04-06
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-04-07 through 2026-06-03
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-04-09 through 2026-06-01
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Voos Directos:

Effective 2026-06-07 through 2026-08-02
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-04-12 through 2026-05-17
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Operates only on 2026-05-31
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-08-08 through 2026-09-26
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-08-04 through 2026-09-30
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-08-06 through 2026-09-28
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-06-07 through 2026-08-02
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-12 through 2026-02-16
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-20 through 2026-03-01
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-01-10 through 2026-02-07
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-01-06 through 2026-01-14
Seg
Ter
Qua
Qui
Sex
Sáb
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-01-18 through 2026-01-23
Seg
-
Ter
Qua
Qui
Sex
Sáb
-
Dom
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-01-26 through 2026-02-04
Seg
Ter
Qua
Qui
Sex
Sáb
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-08 through 2026-02-11
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-18 through 2026-03-04
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-01-11 through 2026-01-16
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-01-19 through 2026-01-25
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-01 through 2026-02-06
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-09 through 2026-02-15
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-17 through 2026-02-23
Seg
Ter
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Operates only on 2026-03-02
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-14 through 2026-02-28
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Voos Directos:

Effective 2026-02-12 through 2026-02-16
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-20 through 2026-03-01
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-08-09 through 2026-09-27
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)
prev        Page 2 / 2
  • Uma rota doméstica com partida no aeroporto Nashville (BNA) e chegada no aeroporto Savannah (SAV).
  • O voo tem uma distância de 417 milhas, ou 672 km.
  • O fuso horário no aeroporto de partida é UTC-6 , e o fuso horário do aeroporto de chegada é UTC-5 . A hora atual no ponto de partida é (loading...), e (loading...) no ponto de chegada. Há uma diferença horária de (loading...) horas entre os aeroportos.
  • Para voos diretos, o tempo de voo varia entre 1:25 e 1:35.