TUI Airways voos de Nottingham (EMA) a Gran Canaria (LPA).

Seleccionar data do voo:
PLANEAR VOO
Voos Directos:
Qui 10:00 Nottingham (EMA) 14:25 Gran Canaria (LPA)
TUI Airways TOM 5430 Non-stop Boeing 737-800 (7S8) 4:25 Operates only on 2026-04-30
This is a Charter flight.
Seg 07:40 Nottingham (EMA) 12:00 Gran Canaria (LPA)
TUI Airways TOM 7100 Non-stop Boeing 737-800 (7S8) 4:20 Operates only on 2026-03-30
This is a Charter flight.
Seg 07:40 Nottingham (EMA) 12:00 Gran Canaria (LPA)
TUI Airways TOM 7100 Non-stop Boeing 737 MAX 8 (7M8) 4:20 Effective 2026-04-06 through 2026-04-20
This is a Charter flight.
Seg 07:40 Nottingham (EMA) 12:00 Gran Canaria (LPA)
TUI Airways TOM 7100 Non-stop Boeing 737-800 (7S8) 4:20 Operates only on 2026-04-27
This is a Charter flight.
Seg 08:55 Nottingham (EMA) 13:15 Gran Canaria (LPA)
TUI Airways TOM 7100 Non-stop Boeing 737-800 (7S8) 4:20 Operates only on 2026-01-05
This is a Charter flight.
Seg 08:55 Nottingham (EMA) 13:15 Gran Canaria (LPA)
TUI Airways TOM 7100 Non-stop Boeing 737 MAX 8 (7M8) 4:20 Operates only on 2026-01-12
This is a Charter flight.
Seg 08:55 Nottingham (EMA) 13:15 Gran Canaria (LPA)
TUI Airways TOM 7100 Non-stop Boeing 737-800 (7S8) 4:20 Operates only on 2026-01-19
This is a Charter flight.
Seg 08:55 Nottingham (EMA) 13:15 Gran Canaria (LPA)
TUI Airways TOM 7100 Non-stop Boeing 737 MAX 8 (7M8) 4:20 Effective 2026-01-26 through 2026-03-02
This is a Charter flight.
Seg 08:55 Nottingham (EMA) 13:15 Gran Canaria (LPA)
TUI Airways TOM 7100 Non-stop Boeing 737-800 (7S8) 4:20 Effective 2026-03-09 through 2026-03-16
This is a Charter flight.
Seg 08:55 Nottingham (EMA) 13:15 Gran Canaria (LPA)
TUI Airways TOM 7100 Non-stop Boeing 737 MAX 8 (7M8) 4:20 Operates only on 2026-03-23
This is a Charter flight.
Seg 16:30 Nottingham (EMA) 20:55 Gran Canaria (LPA)
TUI Airways TOM 7100 Non-stop Boeing 737 MAX 8 (7M8) 4:25 Effective 2026-05-04 through 2026-05-18
This is a Charter flight.
Seg 16:30 Nottingham (EMA) 20:55 Gran Canaria (LPA)
TUI Airways TOM 7100 Non-stop Boeing 737-800 (7S8) 4:25 Effective 2026-05-25 through 2026-09-28
This is a Charter flight.
Seg 16:30 Nottingham (EMA) 20:55 Gran Canaria (LPA)
TUI Airways TOM 7100 Non-stop Boeing 737 MAX 8 (7M8) 4:25 Effective 2026-10-05 through 2026-10-26
This is a Charter flight.
Qui 15:35 Nottingham (EMA) 20:00 Gran Canaria (LPA)
TUI Airways TOM 7462 Non-stop Boeing 737 MAX 8 (7M8) 4:25 Effective 2026-05-07 through 2026-10-29
This is a Charter flight.
Sáb 13:20 Nottingham (EMA) 17:45 Gran Canaria (LPA)
TUI Airways TOM 7620 Non-stop Boeing 737 MAX 8 (7M8) 4:25 Effective 2026-04-04 through 2026-04-18
This is a Charter flight.
Sáb 13:25 Nottingham (EMA) 17:45 Gran Canaria (LPA)
TUI Airways TOM 7620 Non-stop Boeing 737-800 (7S8) 4:20 Effective 2026-01-03 through 2026-01-31
This is a Charter flight.
Sáb 13:25 Nottingham (EMA) 17:45 Gran Canaria (LPA)
TUI Airways TOM 7620 Non-stop Boeing 737 MAX 8 (7M8) 4:20 Effective 2026-02-07 through 2026-03-14
This is a Charter flight.
Sáb 13:25 Nottingham (EMA) 17:45 Gran Canaria (LPA)
TUI Airways TOM 7620 Non-stop Boeing 737-800 (7S8) 4:20 Operates only on 2026-03-21
This is a Charter flight.
Sáb 13:25 Nottingham (EMA) 17:45 Gran Canaria (LPA)
TUI Airways TOM 7620 Non-stop Boeing 737 MAX 8 (7M8) 4:20 Operates only on 2026-03-28
This is a Charter flight.


TUI Airways voos de Nottingham (EMA) a Gran Canaria (LPA).
Seleccionar data do voo:
PLANEAR VOO
Voos Directos:

Operates only on 2026-04-30
This is a Charter flight.
Seg
-
Ter
-
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Duration: 4:25, non-stop
Boeing 737-800 (7S8)

Voos Directos:

Operates only on 2026-03-30
This is a Charter flight.
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:20, non-stop
Boeing 737-800 (7S8)

Voos Directos:

Effective 2026-04-06 through 2026-04-20
This is a Charter flight.
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:20, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Operates only on 2026-04-27
This is a Charter flight.
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:20, non-stop
Boeing 737-800 (7S8)

Voos Directos:

Operates only on 2026-01-05
This is a Charter flight.
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:20, non-stop
Boeing 737-800 (7S8)

Voos Directos:

Operates only on 2026-01-12
This is a Charter flight.
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:20, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Operates only on 2026-01-19
This is a Charter flight.
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:20, non-stop
Boeing 737-800 (7S8)

Voos Directos:

Effective 2026-01-26 through 2026-03-02
This is a Charter flight.
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:20, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-03-09 through 2026-03-16
This is a Charter flight.
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:20, non-stop
Boeing 737-800 (7S8)

Voos Directos:

Operates only on 2026-03-23
This is a Charter flight.
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:20, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-05-04 through 2026-05-18
This is a Charter flight.
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:25, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-05-25 through 2026-09-28
This is a Charter flight.
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:25, non-stop
Boeing 737-800 (7S8)

Voos Directos:

Effective 2026-10-05 through 2026-10-26
This is a Charter flight.
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:25, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-05-07 through 2026-10-29
This is a Charter flight.
Seg
-
Ter
-
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Duration: 4:25, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-04-04 through 2026-04-18
This is a Charter flight.
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 4:25, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-01-03 through 2026-01-31
This is a Charter flight.
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 4:20, non-stop
Boeing 737-800 (7S8)

Voos Directos:

Effective 2026-02-07 through 2026-03-14
This is a Charter flight.
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 4:20, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Operates only on 2026-03-21
This is a Charter flight.
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 4:20, non-stop
Boeing 737-800 (7S8)

Voos Directos:

Operates only on 2026-03-28
This is a Charter flight.
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 4:20, non-stop
Boeing 737 MAX 8 (7M8)
  • Uma rota internacional com partida no aeroporto Nottingham, United Kingdom (EMA), e chegada no aeroporto Gran Canaria, Spain (LPA).
  • O voo tem uma distância de 1864 milhas, ou 2999 km.
  • O fuso horário, tanto no aeroporto de partida como no aeroporto de chegada, é UTC+0 . A hora atual em ambos os aeroportos é (loading...).
  • Para voos diretos, o tempo de voo varia entre 4:20 e 4:25.