Southwest Airlines voos de Las Vegas Harry Reid (LAS) a Austin (AUS).

Seleccionar data do voo:
PLANEAR VOO
Voos Directos:
Seg,Qui-Sáb 19:25 Las Vegas Harry Reid (LAS) 1 00:05 Austin (AUS)
Southwest Airlines WN 3569 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Effective 2026-06-04 through 2026-08-03
The flight arrives 1 day after departure.
Dom 19:45 Las Vegas Harry Reid (LAS) 1 00:25 Austin (AUS)
Southwest Airlines WN 3569 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Effective 2026-06-07 through 2026-08-02
The flight arrives 1 day after departure.
Seg,Qui,Sex 16:10 Las Vegas Harry Reid (LAS) 1 20:55 Austin (AUS)
Southwest Airlines WN 3871 Non-stop Boeing 737-700 (Scimitar Winglets) 2:45 Effective 2026-04-09 through 2026-06-01
Ter,Qua 16:45 Las Vegas Harry Reid (LAS) 1 21:25 Austin (AUS)
Southwest Airlines WN 3871 Non-stop Boeing 737-700 (Scimitar Winglets) 2:40 Effective 2026-04-07 through 2026-06-03
Ter,Qua 18:45 Las Vegas Harry Reid (LAS) 1 23:35 Austin (AUS)
Southwest Airlines WN 4047 Non-stop Boeing 737-800 (73H) 2:50 Effective 2026-06-09 through 2026-07-29
Seg,Qui,Sex 15:50 Las Vegas Harry Reid (LAS) 1 20:25 Austin (AUS)
Southwest Airlines WN 4060 Non-stop Boeing 737-700 (Scimitar Winglets) 2:35 Effective 2026-02-12 through 2026-02-16
Qui,Sex,Dom 15:50 Las Vegas Harry Reid (LAS) 1 20:25 Austin (AUS)
Southwest Airlines WN 4060 Non-stop Boeing 737-700 (Scimitar Winglets) 2:35 Effective 2026-02-20 through 2026-03-01
Ter,Qua 11:05 Las Vegas Harry Reid (LAS) 1 15:55 Austin (AUS)
Southwest Airlines WN 4096 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2026-08-04 through 2026-09-30
Dom 11:30 Las Vegas Harry Reid (LAS) 1 16:15 Austin (AUS)
Southwest Airlines WN 4096 Non-stop Boeing 737 MAX 8 (7M8) 2:45 Effective 2026-08-09 through 2026-09-27
Ter,Qua 16:30 Las Vegas Harry Reid (LAS) 1 21:10 Austin (AUS)
Southwest Airlines WN 4210 Non-stop Boeing 737-800 (73H) 2:40 Effective 2026-03-10 through 2026-04-01
Dom 17:15 Las Vegas Harry Reid (LAS) 1 21:55 Austin (AUS)
Southwest Airlines WN 4210 Non-stop Boeing 737-800 (73H) 2:40 Effective 2026-03-08 through 2026-04-05
Sáb 07:00 Las Vegas Harry Reid (LAS) 1 11:35 Austin (AUS)
Southwest Airlines WN 4217 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2026-02-14 through 2026-02-28
Seg,Qui,Sex 07:40 Las Vegas Harry Reid (LAS) 1 12:15 Austin (AUS)
Southwest Airlines WN 4217 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2026-02-12 through 2026-02-16
Qui,Sex,Dom 07:40 Las Vegas Harry Reid (LAS) 1 12:15 Austin (AUS)
Southwest Airlines WN 4217 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2026-02-20 through 2026-03-01
Dom 19:15 Las Vegas Harry Reid (LAS) 1 23:55 Austin (AUS)
Southwest Airlines WN 4232 Non-stop Boeing 737-700 (Scimitar Winglets) 2:40 Operates only on 2026-05-24
Seg,Qui,Sex 16:50 Las Vegas Harry Reid (LAS) 1 21:25 Austin (AUS)
Southwest Airlines WN 4267 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2026-02-12 through 2026-02-16
Qui,Sex,Dom 16:50 Las Vegas Harry Reid (LAS) 1 21:25 Austin (AUS)
Southwest Airlines WN 4267 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2026-02-20 through 2026-03-01
Sáb 17:00 Las Vegas Harry Reid (LAS) 1 21:35 Austin (AUS)
Southwest Airlines WN 4267 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2026-02-14 through 2026-02-28
Dom 19:55 Las Vegas Harry Reid (LAS) 1 00:35 Austin (AUS)
Southwest Airlines WN 4787 Non-stop Boeing 737-800 (73H) 2:40 Effective 2026-04-12 through 2026-05-17
The flight arrives 1 day after departure.
Dom 19:55 Las Vegas Harry Reid (LAS) 1 00:35 Austin (AUS)
Southwest Airlines WN 4787 Non-stop Boeing 737-800 (73H) 2:40 Operates only on 2026-05-31
The flight arrives 1 day after departure.
Voos Não-Directos:
Ter,Qua 07:45 Las Vegas Harry Reid (LAS) 1 13:40 Austin (AUS)
Southwest Airlines WN 121 1-stop Boeing 737-700 (Scimitar Winglets) 3:55 Effective 2026-06-09 through 2026-07-29
Seg,Qui,Sex 10:45 Las Vegas Harry Reid (LAS) 1 16:40 Austin (AUS)
Southwest Airlines WN 188 1-stop Boeing 737-700 (Scimitar Winglets) 3:55 Effective 2026-04-09 through 2026-06-01
Sáb 16:35 Las Vegas Harry Reid (LAS) 1 22:25 Austin (AUS)
Southwest Airlines WN 224 1-stop Boeing 737-700 (Scimitar Winglets) 3:50 Operates only on 2026-01-03
Seg,Qui,Sex 14:15 Las Vegas Harry Reid (LAS) 1 21:10 Austin (AUS)
Southwest Airlines WN 255 1-stop Boeing 737-800 (73H) 4:55 Effective 2026-06-04 through 2026-08-03
Ter,Qua 08:10 Las Vegas Harry Reid (LAS) 1 14:55 Austin (AUS)
Southwest Airlines WN 406 1-stop Boeing 737-700 (Scimitar Winglets) 4:45 Effective 2026-06-09 through 2026-07-29
Sáb 09:10 Las Vegas Harry Reid (LAS) 1 15:15 Austin (AUS)
Southwest Airlines WN 544 1-stop Boeing 737-800 (73H) 4:05 Effective 2026-04-11 through 2026-05-30
Sáb 09:10 Las Vegas Harry Reid (LAS) 1 15:35 Austin (AUS)
Southwest Airlines WN 662 1-stop Boeing 737-700 (Scimitar Winglets) 4:25 Effective 2026-03-07 through 2026-04-04
Sex,Dom 09:45 Las Vegas Harry Reid (LAS) 1 17:05 Austin (AUS)
Southwest Airlines WN 970 1-stop Boeing 737-700 (Scimitar Winglets) 5:20 Effective 2026-01-02 through 2026-01-04
Sáb 09:45 Las Vegas Harry Reid (LAS) 1 15:35 Austin (AUS)
Southwest Airlines WN 1348 1-stop Boeing 737-700 (Scimitar Winglets) 3:50 Operates only on 2026-01-03
Dom 08:50 Las Vegas Harry Reid (LAS) 1 16:25 Austin (AUS)
Southwest Airlines WN 1811 1-stop Boeing 737-700 (Scimitar Winglets) 5:35 Effective 2026-06-07 through 2026-08-02
Seg,Qui,Sex 09:35 Las Vegas Harry Reid (LAS) 1 16:05 Austin (AUS)
Southwest Airlines WN 1821 1-stop Boeing 737-700 (Scimitar Winglets) 4:30 Effective 2026-02-12 through 2026-02-16
Qui,Sex,Dom 09:35 Las Vegas Harry Reid (LAS) 1 16:05 Austin (AUS)
Southwest Airlines WN 1821 1-stop Boeing 737-700 (Scimitar Winglets) 4:30 Effective 2026-02-20 through 2026-03-01
Dom 15:15 Las Vegas Harry Reid (LAS) 1 21:15 Austin (AUS)
Southwest Airlines WN 1862 1-stop Boeing 737-700 (Scimitar Winglets) 4:00 Effective 2026-03-08 through 2026-04-05
Seg,Qui,Sex 08:20 Las Vegas Harry Reid (LAS) 1 14:10 Austin (AUS)
Southwest Airlines WN 1896 1-stop Boeing 737-700 (Scimitar Winglets) 3:50 Effective 2026-04-09 through 2026-06-01
Seg,Qui,Sex 13:20 Las Vegas Harry Reid (LAS) 1 19:50 Austin (AUS)
Southwest Airlines WN 2052 1-stop Boeing 737-700 (Scimitar Winglets) 4:30 Effective 2026-03-05 through 2026-04-06
Qui,Sex 08:35 Las Vegas Harry Reid (LAS) 1 14:40 Austin (AUS)
Southwest Airlines WN 2096 1-stop Boeing 737-800 (73H) 4:05 Effective 2026-06-04 through 2026-07-31
Seg 08:35 Las Vegas Harry Reid (LAS) 1 14:40 Austin (AUS)
Southwest Airlines WN 2096 1-stop Boeing 737 MAX 8 (7M8) 4:05 Effective 2026-06-08 through 2026-08-03
Seg,Qui,Sex 13:50 Las Vegas Harry Reid (LAS) 1 21:15 Austin (AUS)
Southwest Airlines WN 2104 1-stop Boeing 737-700 (Scimitar Winglets) 5:25 Effective 2026-06-04 through 2026-08-03
Dom 14:20 Las Vegas Harry Reid (LAS) 1 20:55 Austin (AUS)
Southwest Airlines WN 2145 1-stop Boeing 737-700 (Scimitar Winglets) 4:35 Operates only on 2026-05-24
Seg,Qui,Sex 07:10 Las Vegas Harry Reid (LAS) 1 14:00 Austin (AUS)
Southwest Airlines WN 2251 1-stop Boeing 737 MAX 8 (7M8) 4:50 Effective 2026-06-04 through 2026-08-03
Sáb 06:00 Las Vegas Harry Reid (LAS) 1 12:50 Austin (AUS)
Southwest Airlines WN 2255 1-stop Boeing 737-700 (Scimitar Winglets) 4:50 Effective 2026-06-06 through 2026-08-01
Seg,Qui,Sex 12:55 Las Vegas Harry Reid (LAS) 1 19:45 Austin (AUS)
Southwest Airlines WN 2328 1-stop Boeing 737 MAX 8 (7M8) 4:50 Effective 2026-06-04 through 2026-08-03
Dom 15:45 Las Vegas Harry Reid (LAS) 1 21:40 Austin (AUS)
Southwest Airlines WN 2400 1-stop Boeing 737-700 (Scimitar Winglets) 3:55 Operates only on 2026-05-24
Seg,Qui,Sex 14:15 Las Vegas Harry Reid (LAS) 1 21:05 Austin (AUS)
Southwest Airlines WN 2658 1-stop Boeing 737-800 (73H) 4:50 Effective 2026-03-05 through 2026-04-06
Seg,Qui,Sex 09:05 Las Vegas Harry Reid (LAS) 1 16:20 Austin (AUS)
Southwest Airlines WN 2722 1-stop Boeing 737-800 (73H) 5:15 Effective 2026-04-09 through 2026-06-01
Dom 11:05 Las Vegas Harry Reid (LAS) 1 17:00 Austin (AUS)
Southwest Airlines WN 3154 1-stop Boeing 737-700 (Scimitar Winglets) 3:55 Effective 2026-03-08 through 2026-04-05
Seg,Ter,Sex,Dom 05:30 Las Vegas Harry Reid (LAS) 1 13:05 Austin (AUS)
Southwest Airlines WN 3222 1-stop Boeing 737 MAX 8 (7M8) 5:35 Valid until 2026-01-04
Seg 12:30 Las Vegas Harry Reid (LAS) 1 18:35 Austin (AUS)
Southwest Airlines WN 3251 1-stop Boeing 737-700 (Scimitar Winglets) 4:05 Operates only on 2026-01-05
Seg 08:25 Las Vegas Harry Reid (LAS) 1 14:40 Austin (AUS)
Southwest Airlines WN 3338 1-stop Boeing 737-700 (Scimitar Winglets) 4:15 Operates only on 2026-01-05
Ter,Qua 09:20 Las Vegas Harry Reid (LAS) 1 16:40 Austin (AUS)
Southwest Airlines WN 3377 1-stop Boeing 737-800 (73H) 5:20 Effective 2026-03-10 through 2026-04-01
prev   1 2 3 4 5 6   next


Southwest Airlines voos de Las Vegas Harry Reid (LAS) a Austin (AUS).
Seleccionar data do voo:
PLANEAR VOO
Voos Directos:

Effective 2026-06-04 through 2026-08-03
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
Dom
-
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Voos Directos:

Effective 2026-06-07 through 2026-08-02
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Voos Directos:

Effective 2026-04-09 through 2026-06-01
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 2:45, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-04-07 through 2026-06-03
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 2:40, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-06-09 through 2026-07-29
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 2:50, non-stop
Boeing 737-800 (73H)

Voos Directos:

Effective 2026-02-12 through 2026-02-16
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 2:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-20 through 2026-03-01
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 2:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-08-04 through 2026-09-30
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-08-09 through 2026-09-27
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 2:45, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-03-10 through 2026-04-01
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 2:40, non-stop
Boeing 737-800 (73H)

Voos Directos:

Effective 2026-03-08 through 2026-04-05
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 2:40, non-stop
Boeing 737-800 (73H)

Voos Directos:

Effective 2026-02-14 through 2026-02-28
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-02-12 through 2026-02-16
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-02-20 through 2026-03-01
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Operates only on 2026-05-24
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 2:40, non-stop
Boeing 737-700 (Scimitar Winglets)

Voos Directos:

Effective 2026-02-12 through 2026-02-16
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-02-20 through 2026-03-01
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-02-14 through 2026-02-28
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Voos Directos:

Effective 2026-04-12 through 2026-05-17
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 2:40, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Voos Directos:

Operates only on 2026-05-31
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 2:40, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Voos Não-Directos:

Effective 2026-06-09 through 2026-07-29
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 3:55, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Effective 2026-04-09 through 2026-06-01
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 3:55, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Operates only on 2026-01-03
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 3:50, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Effective 2026-06-04 through 2026-08-03
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 4:55, 1-stop
Boeing 737-800 (73H)

Voos Não-Directos:

Effective 2026-06-09 through 2026-07-29
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:45, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Effective 2026-04-11 through 2026-05-30
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 4:05, 1-stop
Boeing 737-800 (73H)

Voos Não-Directos:

Effective 2026-03-07 through 2026-04-04
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 4:25, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Effective 2026-01-02 through 2026-01-04
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
Duration: 5:20, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Operates only on 2026-01-03
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 3:50, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Effective 2026-06-07 through 2026-08-02
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 5:35, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Effective 2026-02-12 through 2026-02-16
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 4:30, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Effective 2026-02-20 through 2026-03-01
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 4:30, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Effective 2026-03-08 through 2026-04-05
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 4:00, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Effective 2026-04-09 through 2026-06-01
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 3:50, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Effective 2026-03-05 through 2026-04-06
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 4:30, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Effective 2026-06-04 through 2026-07-31
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 4:05, 1-stop
Boeing 737-800 (73H)

Voos Não-Directos:

Effective 2026-06-08 through 2026-08-03
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:05, 1-stop
Boeing 737 MAX 8 (7M8)

Voos Não-Directos:

Effective 2026-06-04 through 2026-08-03
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 5:25, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Operates only on 2026-05-24
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 4:35, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Effective 2026-06-04 through 2026-08-03
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 4:50, 1-stop
Boeing 737 MAX 8 (7M8)

Voos Não-Directos:

Effective 2026-06-06 through 2026-08-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 4:50, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Effective 2026-06-04 through 2026-08-03
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 4:50, 1-stop
Boeing 737 MAX 8 (7M8)

Voos Não-Directos:

Operates only on 2026-05-24
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 3:55, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Effective 2026-03-05 through 2026-04-06
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 4:50, 1-stop
Boeing 737-800 (73H)

Voos Não-Directos:

Effective 2026-04-09 through 2026-06-01
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 5:15, 1-stop
Boeing 737-800 (73H)

Voos Não-Directos:

Effective 2026-03-08 through 2026-04-05
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 3:55, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Valid until 2026-01-04
Seg
Ter
Qua
-
Qui
-
Sex
Sáb
-
Dom
Duration: 5:35, 1-stop
Boeing 737 MAX 8 (7M8)

Voos Não-Directos:

Operates only on 2026-01-05
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:05, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Operates only on 2026-01-05
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 4:15, 1-stop
Boeing 737-700 (Scimitar Winglets)

Voos Não-Directos:

Effective 2026-03-10 through 2026-04-01
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 5:20, 1-stop
Boeing 737-800 (73H)
prev        Page 5 / 6        next
  • Uma rota doméstica com partida no aeroporto Las Vegas Harry Reid (LAS) e chegada no aeroporto Austin (AUS).
  • O voo tem uma distância de 1087 milhas, ou 1750 km.
  • O fuso horário no aeroporto de partida é UTC-8 , e o fuso horário do aeroporto de chegada é UTC-6 . A hora atual no ponto de partida é (loading...), e (loading...) no ponto de chegada. Há uma diferença horária de (loading...) horas entre os aeroportos.
  • Para voos diretos, o tempo de voo varia entre 2:30 e 2:50.