ITA Airways voos de Frankfurt (FRA) a Trieste (TRS).

Seleccionar data do voo:
PLANEAR VOO
Voos Codeshare Directos:
Diariamente 12:30 Frankfurt (FRA) 1 13:55 Trieste (TRS)
ITA Airways AZ 7427 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-03-29 through 2026-10-24
Codeshare flight, operated by Air Dolomiti.(EN 8818)
Ter 12:35 Frankfurt (FRA) 1 14:00 Trieste (TRS)
ITA Airways AZ 7427 Non-stop Embraer EMB 195 (E95) 1:25 Effective 2026-01-06 through 2026-02-10
Codeshare flight, operated by Air Dolomiti.(EN 8818)
Ter,Qua 12:35 Frankfurt (FRA) 1 14:00 Trieste (TRS)
ITA Airways AZ 7427 Non-stop Embraer EMB 195 (E95) 1:25 Effective 2026-02-11 through 2026-02-17
Codeshare flight, operated by Air Dolomiti.(EN 8818)
Seg 12:35 Frankfurt (FRA) 1 14:00 Trieste (TRS)
ITA Airways AZ 7427 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-02-16 through 2026-03-23
Codeshare flight, operated by Air Dolomiti.(EN 8818)
Ter 12:35 Frankfurt (FRA) 1 14:00 Trieste (TRS)
ITA Airways AZ 7427 Non-stop Embraer EMB 195 (E95) 1:25 Effective 2026-02-24 through 2026-03-03
Codeshare flight, operated by Air Dolomiti.(EN 8818)
Ter,Qua 12:35 Frankfurt (FRA) 1 14:00 Trieste (TRS)
ITA Airways AZ 7427 Non-stop Embraer EMB 195 (E95) 1:25 Effective 2026-03-04 through 2026-03-25
Codeshare flight, operated by Air Dolomiti.(EN 8818)
Sex-Dom 12:40 Frankfurt (FRA) 1 14:05 Trieste (TRS)
ITA Airways AZ 7427 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Valid until 2026-01-02
Codeshare flight, operated by Air Dolomiti.(EN 8818)
Sáb 12:40 Frankfurt (FRA) 1 14:05 Trieste (TRS)
ITA Airways AZ 7427 Non-stop Embraer EMB 195 (E95) 1:25 Effective 2026-01-03 through 2026-01-24
Codeshare flight, operated by Air Dolomiti.(EN 8818)
Dom 12:40 Frankfurt (FRA) 1 14:05 Trieste (TRS)
ITA Airways AZ 7427 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-01-04 through 2026-01-25
Codeshare flight, operated by Air Dolomiti.(EN 8818)
Sáb,Dom 12:40 Frankfurt (FRA) 1 14:05 Trieste (TRS)
ITA Airways AZ 7427 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-01-31 through 2026-02-01
Codeshare flight, operated by Air Dolomiti.(EN 8818)
Sáb 12:40 Frankfurt (FRA) 1 14:05 Trieste (TRS)
ITA Airways AZ 7427 Non-stop Embraer EMB 195 (E95) 1:25 Operates only on 2026-02-07
Codeshare flight, operated by Air Dolomiti.(EN 8818)
Sex,Dom 12:40 Frankfurt (FRA) 1 14:05 Trieste (TRS)
ITA Airways AZ 7427 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-02-08 through 2026-02-15
Codeshare flight, operated by Air Dolomiti.(EN 8818)
Dom 12:40 Frankfurt (FRA) 1 14:05 Trieste (TRS)
ITA Airways AZ 7427 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-02-22 through 2026-03-01
Codeshare flight, operated by Air Dolomiti.(EN 8818)
Qui,Sex,Dom 12:40 Frankfurt (FRA) 1 14:05 Trieste (TRS)
ITA Airways AZ 7427 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-03-05 through 2026-03-27
Codeshare flight, operated by Air Dolomiti.(EN 8818)
Sáb 12:40 Frankfurt (FRA) 1 14:05 Trieste (TRS)
ITA Airways AZ 7427 Non-stop Embraer EMB 195 (E95) 1:25 Effective 2026-03-07 through 2026-03-28
Codeshare flight, operated by Air Dolomiti.(EN 8818)
Qui 12:45 Frankfurt (FRA) 1 14:10 Trieste (TRS)
ITA Airways AZ 7427 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-01-08 through 2026-02-05
Codeshare flight, operated by Air Dolomiti.(EN 8818)
Qua-Sáb 20:30 Frankfurt (FRA) 1 21:55 Trieste (TRS)
ITA Airways AZ 7429 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-04-01 through 2026-10-24
Codeshare flight, operated by Air Dolomiti.(EN 8820)
Seg,Ter,Dom 20:50 Frankfurt (FRA) 1 22:15 Trieste (TRS)
ITA Airways AZ 7429 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-03-29 through 2026-03-31
Codeshare flight, operated by Air Dolomiti.(EN 8820)
Seg,Ter,Dom 20:50 Frankfurt (FRA) 1 22:15 Trieste (TRS)
ITA Airways AZ 7429 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-04-06 through 2026-10-20
Codeshare flight, operated by Air Dolomiti.(EN 8820)
Seg 21:00 Frankfurt (FRA) 1 22:25 Trieste (TRS)
ITA Airways AZ 7429 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Valid until 2026-02-09
Codeshare flight, operated by Air Dolomiti.(EN 8820)
Seg 21:00 Frankfurt (FRA) 1 22:25 Trieste (TRS)
ITA Airways AZ 7429 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-02-23 through 2026-03-09
Codeshare flight, operated by Air Dolomiti.(EN 8820)
Seg 21:00 Frankfurt (FRA) 1 22:25 Trieste (TRS)
ITA Airways AZ 7429 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Operates only on 2026-03-23
Codeshare flight, operated by Air Dolomiti.(EN 8820)
Sex 21:05 Frankfurt (FRA) 1 22:30 Trieste (TRS)
ITA Airways AZ 7429 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-01-02 through 2026-02-06
Codeshare flight, operated by Air Dolomiti.(EN 8820)
Sex 21:05 Frankfurt (FRA) 1 22:30 Trieste (TRS)
ITA Airways AZ 7429 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-02-20 through 2026-03-27
Codeshare flight, operated by Air Dolomiti.(EN 8820)
Qua,Qui 21:15 Frankfurt (FRA) 1 22:40 Trieste (TRS)
ITA Airways AZ 7429 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Valid until 2026-01-07
Codeshare flight, operated by Air Dolomiti.(EN 8820)
Qua 21:15 Frankfurt (FRA) 1 22:40 Trieste (TRS)
ITA Airways AZ 7429 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-01-14 through 2026-02-11
Codeshare flight, operated by Air Dolomiti.(EN 8820)
Qua,Qui 21:15 Frankfurt (FRA) 1 22:40 Trieste (TRS)
ITA Airways AZ 7429 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-02-12 through 2026-03-05
Codeshare flight, operated by Air Dolomiti.(EN 8820)
Qua 21:15 Frankfurt (FRA) 1 22:40 Trieste (TRS)
ITA Airways AZ 7429 Non-stop Embraer EMB 195 (E95) 1:25 Operates only on 2026-03-11
Codeshare flight, operated by Air Dolomiti.(EN 8820)
Qua,Qui 21:15 Frankfurt (FRA) 1 22:40 Trieste (TRS)
ITA Airways AZ 7429 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Effective 2026-03-12 through 2026-03-19
Codeshare flight, operated by Air Dolomiti.(EN 8820)
Qua 21:15 Frankfurt (FRA) 1 22:40 Trieste (TRS)
ITA Airways AZ 7429 Non-stop Embraer EMB 195 (E95) 1:25 Operates only on 2026-03-25
Codeshare flight, operated by Air Dolomiti.(EN 8820)
Qui 21:15 Frankfurt (FRA) 1 22:40 Trieste (TRS)
ITA Airways AZ 7429 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:25 Operates only on 2026-03-26
Codeshare flight, operated by Air Dolomiti.(EN 8820)


ITA Airways voos de Frankfurt (FRA) a Trieste (TRS).
Seleccionar data do voo:
PLANEAR VOO
Voos Codeshare Directos:

Effective 2026-03-29 through 2026-10-24
Seg
Ter
Qua
Qui
Sex
Sáb
Dom
Codeshare flight, operated by Air Dolomiti. (EN 8818)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Effective 2026-01-06 through 2026-02-10
Seg
-
Ter
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8818)
Duration: 1:25, non-stop
Embraer EMB 195 (E95)

Voos Codeshare Directos:

Effective 2026-02-11 through 2026-02-17
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8818)
Duration: 1:25, non-stop
Embraer EMB 195 (E95)

Voos Codeshare Directos:

Effective 2026-02-16 through 2026-03-23
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8818)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Effective 2026-02-24 through 2026-03-03
Seg
-
Ter
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8818)
Duration: 1:25, non-stop
Embraer EMB 195 (E95)

Voos Codeshare Directos:

Effective 2026-03-04 through 2026-03-25
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8818)
Duration: 1:25, non-stop
Embraer EMB 195 (E95)

Voos Codeshare Directos:

Valid until 2026-01-02
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
Dom
Codeshare flight, operated by Air Dolomiti. (EN 8818)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Effective 2026-01-03 through 2026-01-24
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8818)
Duration: 1:25, non-stop
Embraer EMB 195 (E95)

Voos Codeshare Directos:

Effective 2026-01-04 through 2026-01-25
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Codeshare flight, operated by Air Dolomiti. (EN 8818)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Effective 2026-01-31 through 2026-02-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
Codeshare flight, operated by Air Dolomiti. (EN 8818)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Operates only on 2026-02-07
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8818)
Duration: 1:25, non-stop
Embraer EMB 195 (E95)

Voos Codeshare Directos:

Effective 2026-02-08 through 2026-02-15
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
Codeshare flight, operated by Air Dolomiti. (EN 8818)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Effective 2026-02-22 through 2026-03-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Codeshare flight, operated by Air Dolomiti. (EN 8818)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Effective 2026-03-05 through 2026-03-27
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Codeshare flight, operated by Air Dolomiti. (EN 8818)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Effective 2026-03-07 through 2026-03-28
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8818)
Duration: 1:25, non-stop
Embraer EMB 195 (E95)

Voos Codeshare Directos:

Effective 2026-01-08 through 2026-02-05
Seg
-
Ter
-
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8818)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Effective 2026-04-01 through 2026-10-24
Seg
-
Ter
-
Qua
Qui
Sex
Sáb
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8820)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Effective 2026-03-29 through 2026-03-31
Seg
Ter
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Codeshare flight, operated by Air Dolomiti. (EN 8820)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Effective 2026-04-06 through 2026-10-20
Seg
Ter
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Codeshare flight, operated by Air Dolomiti. (EN 8820)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Valid until 2026-02-09
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8820)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Effective 2026-02-23 through 2026-03-09
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8820)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Operates only on 2026-03-23
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8820)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Effective 2026-01-02 through 2026-02-06
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8820)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Effective 2026-02-20 through 2026-03-27
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8820)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Valid until 2026-01-07
Seg
-
Ter
-
Qua
Qui
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8820)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Effective 2026-01-14 through 2026-02-11
Seg
-
Ter
-
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8820)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Effective 2026-02-12 through 2026-03-05
Seg
-
Ter
-
Qua
Qui
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8820)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Operates only on 2026-03-11
Seg
-
Ter
-
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8820)
Duration: 1:25, non-stop
Embraer EMB 195 (E95)

Voos Codeshare Directos:

Effective 2026-03-12 through 2026-03-19
Seg
-
Ter
-
Qua
Qui
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8820)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Operates only on 2026-03-25
Seg
-
Ter
-
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8820)
Duration: 1:25, non-stop
Embraer EMB 195 (E95)

Voos Codeshare Directos:

Operates only on 2026-03-26
Seg
-
Ter
-
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Air Dolomiti. (EN 8820)
Duration: 1:25, non-stop
Embraer EMB 190 / EMB 195 (E90)
  • Uma rota internacional com partida no aeroporto Frankfurt, Germany (FRA), e chegada no aeroporto Trieste, Italy (TRS).
  • O voo tem uma distância de 369 milhas, ou 593 km.
  • O fuso horário, tanto no aeroporto de partida como no aeroporto de chegada, é UTC+1 . A hora atual em ambos os aeroportos é (loading...).
  • Para voos diretos, o tempo de voo é 1:25.