| PLANEAR VOO |
|---|
| Voos Codeshare Directos: |
| Diariamente
18:40
Munich (MUC) 2
19:40
Venice Marco Polo (VCE) AZ 7485 Non-stop Embraer EMB 195 (E95) 1:00 Effective 2026-05-02 through 2026-07-31 Codeshare flight, operated by Air Dolomiti.(EN 8236) |
| Diariamente
18:40
Munich (MUC) 2
19:40
Venice Marco Polo (VCE) AZ 7485 Non-stop Embraer EMB 195 (E95) 1:00 Effective 2026-08-31 through 2026-10-24 Codeshare flight, operated by Air Dolomiti.(EN 8236) |