Gol voo G3 3016: Multiple routes

Seleccionar data do voo:
PLANEAR VOO
Voos Codeshare Directos:
Qua 10:00 Rosario (ROS) 10:55 Buenos Aires Ministro Pistarini Intl (EZE) DA
G3 3016 Non-stop Boeing 737 MAX 8 (7M8) 0:55 Operates only on 2026-02-04
Codeshare flight, operated by Aerolineas Argentinas.(AR 1719)
Ter,Sex 10:15 Viedma (VDM) 11:50 Buenos Aires Jorge Newbery Airfield (AEP)
G3 3016 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:35 Effective 2026-03-03 through 2026-03-27
Codeshare flight, operated by Aerolineas Argentinas.(AR 1627)
Qui 11:20 Buenos Aires Jorge Newbery Airfield (AEP) 13:05 Viedma (VDM)
G3 3016 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:45 Operates only on 2026-01-01
Codeshare flight, operated by Aerolineas Argentinas.(AR 1626)
Qua 11:45 Rosario (ROS) 12:40 Buenos Aires Ministro Pistarini Intl (EZE) DA
G3 3016 Non-stop Boeing 737 MAX 8 (7M8) 0:55 Operates only on 2026-01-28
Codeshare flight, operated by Aerolineas Argentinas.(AR 1719)
Dom 13:00 Cordoba (COR) 14:10 Mendoza (MDZ)
G3 3016 Non-stop Boeing 737-800 (738) 1:10 Effective 2026-03-01 through 2026-03-22
Codeshare flight, operated by Aerolineas Argentinas.(AR 1579)
Sex 15:30 Buenos Aires Jorge Newbery Airfield (AEP) 17:45 Salta (SLA)
G3 3016 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:15 Operates only on 2026-01-02
Codeshare flight, operated by Aerolineas Argentinas.(AR 1502)
Ter,Qui 15:30 Buenos Aires Jorge Newbery Airfield (AEP) 17:15 Viedma (VDM)
G3 3016 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:45 Effective 2026-01-06 through 2026-01-20
Codeshare flight, operated by Aerolineas Argentinas.(AR 1628)
Sex 15:30 Buenos Aires Jorge Newbery Airfield (AEP) 17:45 Salta (SLA)
G3 3016 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:15 Effective 2026-01-23 through 2026-02-06
Codeshare flight, operated by Aerolineas Argentinas.(AR 1502)
Ter,Qui 15:30 Buenos Aires Jorge Newbery Airfield (AEP) 17:15 Viedma (VDM)
G3 3016 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:45 Effective 2026-01-27 through 2026-02-26
Codeshare flight, operated by Aerolineas Argentinas.(AR 1628)
Sex 15:30 Buenos Aires Jorge Newbery Airfield (AEP) 17:45 Salta (SLA)
G3 3016 Non-stop Boeing 737-700 (73R) 2:15 Operates only on 2026-02-13
Codeshare flight, operated by Aerolineas Argentinas.(AR 1502)
Sex 15:30 Buenos Aires Jorge Newbery Airfield (AEP) 17:45 Salta (SLA)
G3 3016 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:15 Effective 2026-02-20 through 2026-02-27
Codeshare flight, operated by Aerolineas Argentinas.(AR 1502)
Seg 15:40 Salta (SLA) 17:45 Buenos Aires Jorge Newbery Airfield (AEP)
G3 3016 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:05 Operates only on 2026-01-19
Codeshare flight, operated by Aerolineas Argentinas.(AR 1491)
Sex 15:50 Buenos Aires Jorge Newbery Airfield (AEP) 18:05 Salta (SLA)
G3 3016 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:15 Operates only on 2026-01-16
Codeshare flight, operated by Aerolineas Argentinas.(AR 1502)
Seg 15:55 Salta (SLA) 18:00 Buenos Aires Jorge Newbery Airfield (AEP)
G3 3016 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:05 Operates only on 2026-01-05
Codeshare flight, operated by Aerolineas Argentinas.(AR 1491)
Seg 15:55 Salta (SLA) 18:00 Buenos Aires Jorge Newbery Airfield (AEP)
G3 3016 Non-stop Boeing 737-700 (73R) 2:05 Operates only on 2026-01-12
Codeshare flight, operated by Aerolineas Argentinas.(AR 1491)
Qui 16:05 Buenos Aires Jorge Newbery Airfield (AEP) 17:50 Viedma (VDM)
G3 3016 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:45 Operates only on 2026-01-22
Codeshare flight, operated by Aerolineas Argentinas.(AR 1628)
Sáb 16:50 Rosario (ROS) 17:45 Buenos Aires Ministro Pistarini Intl (EZE) DA
G3 3016 Non-stop Embraer EMB 190 / EMB 195 (E90) 0:55 Operates only on 2026-01-03
Codeshare flight, operated by Aerolineas Argentinas.(AR 1715)
Sáb 18:15 Buenos Aires Jorge Newbery Airfield (AEP) 20:30 Salta (SLA)
G3 3016 Non-stop Boeing 737-800 (738) 2:15 Effective 2026-03-07 through 2026-03-28
Codeshare flight, operated by Aerolineas Argentinas.(AR 1502)
Sáb 18:20 Mar del Plata (MDQ) 19:25 Buenos Aires Ministro Pistarini Intl (EZE) DA
G3 3016 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:05 Operates only on 2026-01-10
Codeshare flight, operated by Aerolineas Argentinas.(AR 1609)
Sáb 19:10 Buenos Aires Jorge Newbery Airfield (AEP) 23:30 Salvador (SSA)
G3 3016 Non-stop Boeing 737 MAX 8 (7M8) 4:20 Effective 2026-02-07 through 2026-02-28
Codeshare flight, operated by Aerolineas Argentinas.(AR 1222)
Sáb 20:20 Rosario (ROS) 21:15 Buenos Aires Ministro Pistarini Intl (EZE) DA
G3 3016 Non-stop Boeing 737 MAX 8 (7M8) 0:55 Operates only on 2026-01-31
Codeshare flight, operated by Aerolineas Argentinas.(AR 1719)
Sáb 21:55 Mar del Plata (MDQ) 23:00 Buenos Aires Ministro Pistarini Intl (EZE) DA
G3 3016 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:05 Operates only on 2026-01-17
Codeshare flight, operated by Aerolineas Argentinas.(AR 1613)
This flight number is listed as serving the following routes:
Gol voo G3 3016: Multiple routes
Seleccionar data do voo:
PLANEAR VOO
Voos Codeshare Directos:

Gol G33016
Operates only on 2026-02-04
Seg
-
Ter
-
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1719)
Duration: 0:55, non-stop
Boeing 737 MAX 8 (7M8)

Voos Codeshare Directos:

Gol G33016
Effective 2026-03-03 through 2026-03-27
Seg
-
Ter
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1627)
Duration: 1:35, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Gol G33016
Operates only on 2026-01-01
Seg
-
Ter
-
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1626)
Duration: 1:45, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Gol G33016
Operates only on 2026-01-28
Seg
-
Ter
-
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1719)
Duration: 0:55, non-stop
Boeing 737 MAX 8 (7M8)

Voos Codeshare Directos:

Gol G33016
Effective 2026-03-01 through 2026-03-22
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Codeshare flight, operated by Aerolineas Argentinas. (AR 1579)
Duration: 1:10, non-stop
Boeing 737-800 (738)

Voos Codeshare Directos:

Gol G33016
Operates only on 2026-01-02
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1502)
Duration: 2:15, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Gol G33016
Effective 2026-01-06 through 2026-01-20
Seg
-
Ter
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1628)
Duration: 1:45, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Gol G33016
Effective 2026-01-23 through 2026-02-06
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1502)
Duration: 2:15, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Gol G33016
Effective 2026-01-27 through 2026-02-26
Seg
-
Ter
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1628)
Duration: 1:45, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Gol G33016
Operates only on 2026-02-13
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1502)
Duration: 2:15, non-stop
Boeing 737-700 (73R)

Voos Codeshare Directos:

Gol G33016
Effective 2026-02-20 through 2026-02-27
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1502)
Duration: 2:15, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Gol G33016
Operates only on 2026-01-19
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1491)
Duration: 2:05, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Gol G33016
Operates only on 2026-01-16
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1502)
Duration: 2:15, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Gol G33016
Operates only on 2026-01-05
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1491)
Duration: 2:05, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Gol G33016
Operates only on 2026-01-12
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1491)
Duration: 2:05, non-stop
Boeing 737-700 (73R)

Voos Codeshare Directos:

Gol G33016
Operates only on 2026-01-22
Seg
-
Ter
-
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1628)
Duration: 1:45, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Gol G33016
Operates only on 2026-01-03
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1715)
Duration: 0:55, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Gol G33016
Effective 2026-03-07 through 2026-03-28
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1502)
Duration: 2:15, non-stop
Boeing 737-800 (738)

Voos Codeshare Directos:

Gol G33016
Operates only on 2026-01-10
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1609)
Duration: 1:05, non-stop
Embraer EMB 190 / EMB 195 (E90)

Voos Codeshare Directos:

Gol G33016
Effective 2026-02-07 through 2026-02-28
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1222)
Duration: 4:20, non-stop
Boeing 737 MAX 8 (7M8)

Voos Codeshare Directos:

Gol G33016
Operates only on 2026-01-31
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1719)
Duration: 0:55, non-stop
Boeing 737 MAX 8 (7M8)

Voos Codeshare Directos:

Gol G33016
Operates only on 2026-01-17
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1613)
Duration: 1:05, non-stop
Embraer EMB 190 / EMB 195 (E90)
This flight number is listed as serving the following routes:
  • Buenos Aires Jorge Newbery Airfield (AEP) - Salta (SLA)
  • Buenos Aires Jorge Newbery Airfield (AEP) - Salvador (SSA)
  • Cordoba (COR) - Mendoza (MDZ)
  • Mar del Plata (MDQ) - Buenos Aires Ministro Pistarini Intl (EZE)
  • Rosario (ROS) - Buenos Aires Ministro Pistarini Intl (EZE)
  • Viedma (VDM) - Buenos Aires Jorge Newbery Airfield (AEP)