PLANEAR VOO |
---|
Voos Codeshare Directos: |
Seg
08:55
Shenyang (SHE)
11:15
Jinan (TNA) CA 8718 Non-stop Boeing 737-800 (738) 2:20 Effective 2024-09-30 through 2024-10-07 Codeshare flight, operated by Shandong Airlines.(SC 8448) |
Ter-Dom
09:25
Shenyang (SHE)
11:20
Jinan (TNA) CA 8718 Non-stop Boeing 737-800 (738) 1:55 Valid until 2024-10-26 Codeshare flight, operated by Shandong Airlines.(SC 8448) |
Seg
09:25
Shenyang (SHE)
11:15
Jinan (TNA) CA 8718 Non-stop Boeing 737-800 (738) 1:50 Effective 2024-09-02 through 2024-09-23 Codeshare flight, operated by Shandong Airlines.(SC 8448) |
Seg
09:25
Shenyang (SHE)
11:15
Jinan (TNA) CA 8718 Non-stop Boeing 737-800 (738) 1:50 Effective 2024-10-14 through 2024-10-21 Codeshare flight, operated by Shandong Airlines.(SC 8448) |
Seg
12:15
Jinan (TNA)
14:15
Fuzhou (FOC) CA 8718 Non-stop Boeing 737-800 (738) 2:00 Effective 2024-09-02 through 2024-10-21 Codeshare flight, operated by Shandong Airlines.(SC 8448) |
Ter-Dom
12:20
Jinan (TNA)
14:30
Fuzhou (FOC) CA 8718 Non-stop Boeing 737-800 (738) 2:10 Valid until 2024-10-26 Codeshare flight, operated by Shandong Airlines.(SC 8448) |
Voos Codeshare Não-Directos: |
Seg
08:55
Shenyang (SHE)
14:15
Fuzhou (FOC) CA 8718 1-stop Boeing 737-800 (738) 5:20 Effective 2024-09-30 through 2024-10-07 Codeshare flight, operated by Shandong Airlines.(SC 8448) |
Ter-Dom
09:25
Shenyang (SHE)
14:30
Fuzhou (FOC) CA 8718 1-stop Boeing 737-800 (738) 5:05 Valid until 2024-10-26 Codeshare flight, operated by Shandong Airlines.(SC 8448) |
Seg
09:25
Shenyang (SHE)
14:15
Fuzhou (FOC) CA 8718 1-stop Boeing 737-800 (738) 4:50 Effective 2024-09-02 through 2024-09-23 Codeshare flight, operated by Shandong Airlines.(SC 8448) |
Seg
09:25
Shenyang (SHE)
14:15
Fuzhou (FOC) CA 8718 1-stop Boeing 737-800 (738) 4:50 Effective 2024-10-14 through 2024-10-21 Codeshare flight, operated by Shandong Airlines.(SC 8448) |