Iberia 항공 IB 5445: 멀티 루트

비행 날짜 선택:
비행시간표
직항 공동운항:
토 09:45 Barcelona (BCN) 1 12:20 Tenerife North (TFN)
IB 5445 Non-stop Airbus A320 (320) 3:35 Operates only on 2026-02-14
Vueling 공동운항편(VY 3208)
수 15:15 Barcelona (BCN) 1 16:50 Nantes (NTE)
IB 5445 Non-stop Airbus A320 (320) 1:35 Effective 2026-04-01 through 2026-06-10
Vueling 공동운항편(VY 2976)
월 15:15 Barcelona (BCN) 1 16:50 Nantes (NTE)
IB 5445 Non-stop Airbus A321 (321) 1:35 Operates only on 2026-06-15
Vueling 공동운항편(VY 2976)
월,금 17:00 Barcelona (BCN) 1 19:25 Tenerife North (TFN)
IB 5445 Non-stop Airbus A320 (320) 3:25 Valid until 2026-03-27
Vueling 공동운항편(VY 3208)
화-목 17:05 Barcelona (BCN) 1 19:30 Tenerife North (TFN)
IB 5445 Non-stop Airbus A321 (321) 3:25 Valid until 2026-01-07
Vueling 공동운항편(VY 3208)
일 17:05 Barcelona (BCN) 1 19:30 Tenerife North (TFN)
IB 5445 Non-stop Airbus A320 (320) 3:25 Effective 2026-01-11 through 2026-01-18
Vueling 공동운항편(VY 3208)
수,일 17:10 Barcelona (BCN) 1 19:35 Tenerife North (TFN)
IB 5445 Non-stop Airbus A321 (321) 3:25 Valid until 2026-01-04
Vueling 공동운항편(VY 3208)
화-목 17:10 Barcelona (BCN) 1 19:35 Tenerife North (TFN)
IB 5445 Non-stop Airbus A320 (320) 3:25 Effective 2026-01-08 through 2026-03-26
Vueling 공동운항편(VY 3208)
일 17:10 Barcelona (BCN) 1 19:35 Tenerife North (TFN)
IB 5445 Non-stop Airbus A321 (321) 3:25 Operates only on 2026-02-01
Vueling 공동운항편(VY 3208)
일 17:15 Barcelona (BCN) 1 19:40 Tenerife North (TFN)
IB 5445 Non-stop Airbus A320 (320) 3:25 Operates only on 2026-01-25
Vueling 공동운항편(VY 3208)
일 17:15 Barcelona (BCN) 1 19:40 Tenerife North (TFN)
IB 5445 Non-stop Airbus A320 (320) 3:25 Effective 2026-02-08 through 2026-03-22
Vueling 공동운항편(VY 3208)
토 17:20 Barcelona (BCN) 1 19:45 Tenerife North (TFN)
IB 5445 Non-stop Airbus A320 (320) 3:25 Effective 2026-01-03 through 2026-02-07
Vueling 공동운항편(VY 3208)
토 17:20 Barcelona (BCN) 1 19:45 Tenerife North (TFN)
IB 5445 Non-stop Airbus A320 (320) 3:25 Effective 2026-02-21 through 2026-03-28
Vueling 공동운항편(VY 3208)
이 항공편의 비행루트:
Iberia 항공 IB 5445: 멀티 루트
비행 날짜 선택:
비행시간표
직항 공동운항:

Iberia IB5445
Operates only on 2026-02-14

-

-

-

-

-


-
Vueling 공동운항편 (VY 3208)
Duration: 3:35, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB5445
Effective 2026-04-01 through 2026-06-10

-

-


-

-

-

-
Vueling 공동운항편 (VY 2976)
Duration: 1:35, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB5445
Operates only on 2026-06-15


-

-

-

-

-

-
Vueling 공동운항편 (VY 2976)
Duration: 1:35, non-stop
Airbus A321 (321)

직항 공동운항:

Iberia IB5445
Valid until 2026-03-27


-

-

-


-

-
Vueling 공동운항편 (VY 3208)
Duration: 3:25, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB5445
Valid until 2026-01-07

-




-

-

-
Vueling 공동운항편 (VY 3208)
Duration: 3:25, non-stop
Airbus A321 (321)

직항 공동운항:

Iberia IB5445
Effective 2026-01-11 through 2026-01-18

-

-

-

-

-

-

Vueling 공동운항편 (VY 3208)
Duration: 3:25, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB5445
Valid until 2026-01-04

-

-


-

-

-

Vueling 공동운항편 (VY 3208)
Duration: 3:25, non-stop
Airbus A321 (321)

직항 공동운항:

Iberia IB5445
Effective 2026-01-08 through 2026-03-26

-




-

-

-
Vueling 공동운항편 (VY 3208)
Duration: 3:25, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB5445
Operates only on 2026-02-01

-

-

-

-

-

-

Vueling 공동운항편 (VY 3208)
Duration: 3:25, non-stop
Airbus A321 (321)

직항 공동운항:

Iberia IB5445
Operates only on 2026-01-25

-

-

-

-

-

-

Vueling 공동운항편 (VY 3208)
Duration: 3:25, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB5445
Effective 2026-02-08 through 2026-03-22

-

-

-

-

-

-

Vueling 공동운항편 (VY 3208)
Duration: 3:25, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB5445
Effective 2026-01-03 through 2026-02-07

-

-

-

-

-


-
Vueling 공동운항편 (VY 3208)
Duration: 3:25, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB5445
Effective 2026-02-21 through 2026-03-28

-

-

-

-

-


-
Vueling 공동운항편 (VY 3208)
Duration: 3:25, non-stop
Airbus A320 (320)
이 항공편의 비행루트:
  • Barcelona (BCN) - Nantes (NTE)
  • Barcelona (BCN) - Tenerife North (TFN)