Iberia 항공 IB 3711: London Heathrow - Newcastle

비행 날짜 선택:
비행시간표
직항 공동운항:
월,일 14:15 London Heathrow (LHR) 5 15:30 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:15 Effective 2026-03-29 through 2026-10-19
British Airways 공동운항편(BA 1334)
월 14:35 London Heathrow (LHR) 5 15:55 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:20 Operates only on 2026-01-05
British Airways 공동운항편(BA 1334)
월 14:35 London Heathrow (LHR) 5 15:55 Newcastle (NCL)
IB 3711 Non-stop Airbus A319 (319) 1:20 Operates only on 2026-01-12
British Airways 공동운항편(BA 1334)
월 14:35 London Heathrow (LHR) 5 15:55 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:20 Effective 2026-01-19 through 2026-01-26
British Airways 공동운항편(BA 1334)
월 14:35 London Heathrow (LHR) 5 15:55 Newcastle (NCL)
IB 3711 Non-stop Airbus A319 (319) 1:20 Operates only on 2026-02-02
British Airways 공동운항편(BA 1334)
월 14:35 London Heathrow (LHR) 5 15:55 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:20 Operates only on 2026-02-09
British Airways 공동운항편(BA 1334)
월 14:35 London Heathrow (LHR) 5 15:55 Newcastle (NCL)
IB 3711 Non-stop Airbus A321neo (32Q) 1:20 Operates only on 2026-02-23
British Airways 공동운항편(BA 1334)
월 14:35 London Heathrow (LHR) 5 15:55 Newcastle (NCL)
IB 3711 Non-stop Airbus A319 (319) 1:20 Operates only on 2026-03-02
British Airways 공동운항편(BA 1334)
월 14:35 London Heathrow (LHR) 5 15:55 Newcastle (NCL)
IB 3711 Non-stop Airbus A320 (320) 1:20 Operates only on 2026-03-09
British Airways 공동운항편(BA 1334)
월 14:35 London Heathrow (LHR) 5 15:55 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:20 Operates only on 2026-03-16
British Airways 공동운항편(BA 1334)
월 14:35 London Heathrow (LHR) 5 15:55 Newcastle (NCL)
IB 3711 Non-stop Airbus A320 (320) 1:20 Operates only on 2026-03-23
British Airways 공동운항편(BA 1334)
월 14:35 London Heathrow (LHR) 5 15:55 Newcastle (NCL)
IB 3711 Non-stop Airbus A320 (320) 1:20 Effective from 2026-10-26
British Airways 공동운항편(BA 1334)
화,목,금,일 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:20 Valid until 2026-01-01
British Airways 공동운항편(BA 1334)
금 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A319 (319) 1:20 Operates only on 2026-01-02
British Airways 공동운항편(BA 1334)
화-목,토,일 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:20 Effective 2026-01-03 through 2026-01-10
British Airways 공동운항편(BA 1334)
금,일 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320 (320) 1:20 Effective 2026-01-09 through 2026-01-11
British Airways 공동운항편(BA 1334)
화,목,토 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:20 Effective 2026-01-13 through 2026-01-17
British Airways 공동운항편(BA 1334)
화,수 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A319 (319) 1:20 Effective 2026-01-14 through 2026-01-20
British Airways 공동운항편(BA 1334)
금 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A321neo (32Q) 1:20 Operates only on 2026-01-16
British Airways 공동운항편(BA 1334)
일 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320 (320) 1:20 Effective 2026-01-18 through 2026-01-25
British Airways 공동운항편(BA 1334)
화-토 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:20 Effective 2026-01-21 through 2026-01-28
British Airways 공동운항편(BA 1334)
목 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A319 (319) 1:20 Effective 2026-01-29 through 2026-02-05
British Airways 공동운항편(BA 1334)
금,일 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A321neo (32Q) 1:20 Effective 2026-01-30 through 2026-02-01
British Airways 공동운항편(BA 1334)
화,토 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:20 Effective 2026-01-31 through 2026-02-07
British Airways 공동운항편(BA 1334)
수,금 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320 (320) 1:20 Effective 2026-02-04 through 2026-02-06
British Airways 공동운항편(BA 1334)
화,목,일 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A319 (319) 1:20 Effective 2026-02-08 through 2026-02-12
British Airways 공동운항편(BA 1334)
수,토 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:20 Effective 2026-02-11 through 2026-02-21
British Airways 공동운항편(BA 1334)
금 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320 (320) 1:20 Effective 2026-02-13 through 2026-03-06
British Airways 공동운항편(BA 1334)
화,일 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A321neo (32Q) 1:20 Effective 2026-02-15 through 2026-02-22
British Airways 공동운항편(BA 1334)
목 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A319 (319) 1:20 Operates only on 2026-02-19
British Airways 공동운항편(BA 1334)
화,일 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:20 Effective 2026-02-24 through 2026-03-03
British Airways 공동운항편(BA 1334)
수,토 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A321neo (32Q) 1:20 Effective 2026-02-25 through 2026-02-28
British Airways 공동운항편(BA 1334)
화-목 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:20 Effective 2026-03-04 through 2026-03-10
British Airways 공동운항편(BA 1334)
금,일 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320 (320) 1:20 Effective 2026-03-08 through 2026-03-13
British Airways 공동운항편(BA 1334)
수 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A321neo (32Q) 1:20 Effective 2026-03-11 through 2026-03-18
British Airways 공동운항편(BA 1334)
화,목,토,일 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:20 Effective 2026-03-12 through 2026-03-21
British Airways 공동운항편(BA 1334)
금 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320 (320) 1:20 Effective 2026-03-20 through 2026-03-27
British Airways 공동운항편(BA 1334)
일 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A321neo (32Q) 1:20 Operates only on 2026-03-22
British Airways 공동운항편(BA 1334)
화-목,토 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:20 Effective 2026-03-24 through 2026-03-28
British Airways 공동운항편(BA 1334)
화,목,토,일 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:20 Effective from 2026-10-25
British Airways 공동운항편(BA 1334)
수,금 14:40 London Heathrow (LHR) 5 16:00 Newcastle (NCL)
IB 3711 Non-stop Airbus A319 (319) 1:20 Effective from 2026-10-28
British Airways 공동운항편(BA 1334)
수 15:00 London Heathrow (LHR) 5 16:15 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:15 Effective 2026-04-01 through 2026-10-21
British Airways 공동운항편(BA 1334)
화 15:20 London Heathrow (LHR) 5 16:35 Newcastle (NCL)
IB 3711 Non-stop Airbus A319 (319) 1:15 Effective 2026-03-31 through 2026-10-20
British Airways 공동운항편(BA 1334)
목 15:25 London Heathrow (LHR) 5 16:40 Newcastle (NCL)
IB 3711 Non-stop Airbus A320neo (32N) 1:15 Effective 2026-04-02 through 2026-10-22
British Airways 공동운항편(BA 1334)
Iberia 항공 IB 3711:
London Heathrow - Newcastle
비행 날짜 선택:
비행시간표
직항 공동운항:

Iberia IB3711
Effective 2026-03-29 through 2026-10-19


-

-

-

-

-

British Airways 공동운항편 (BA 1334)
Duration: 1:15, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Operates only on 2026-01-05


-

-

-

-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Operates only on 2026-01-12


-

-

-

-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A319 (319)

직항 공동운항:

Iberia IB3711
Effective 2026-01-19 through 2026-01-26


-

-

-

-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Operates only on 2026-02-02


-

-

-

-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A319 (319)

직항 공동운항:

Iberia IB3711
Operates only on 2026-02-09


-

-

-

-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Operates only on 2026-02-23


-

-

-

-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A321neo (32Q)

직항 공동운항:

Iberia IB3711
Operates only on 2026-03-02


-

-

-

-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A319 (319)

직항 공동운항:

Iberia IB3711
Operates only on 2026-03-09


-

-

-

-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB3711
Operates only on 2026-03-16


-

-

-

-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Operates only on 2026-03-23


-

-

-

-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB3711
Effective from 2026-10-26


-

-

-

-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB3711
Valid until 2026-01-01

-


-



-

British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Operates only on 2026-01-02

-

-

-

-


-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A319 (319)

직항 공동운항:

Iberia IB3711
Effective 2026-01-03 through 2026-01-10

-




-


British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Effective 2026-01-09 through 2026-01-11

-

-

-

-


-

British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB3711
Effective 2026-01-13 through 2026-01-17

-


-


-


-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Effective 2026-01-14 through 2026-01-20

-



-

-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A319 (319)

직항 공동운항:

Iberia IB3711
Operates only on 2026-01-16

-

-

-

-


-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A321neo (32Q)

직항 공동운항:

Iberia IB3711
Effective 2026-01-18 through 2026-01-25

-

-

-

-

-

-

British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB3711
Effective 2026-01-21 through 2026-01-28

-






-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Effective 2026-01-29 through 2026-02-05

-

-

-


-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A319 (319)

직항 공동운항:

Iberia IB3711
Effective 2026-01-30 through 2026-02-01

-

-

-

-


-

British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A321neo (32Q)

직항 공동운항:

Iberia IB3711
Effective 2026-01-31 through 2026-02-07

-


-

-

-


-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Effective 2026-02-04 through 2026-02-06

-

-


-


-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB3711
Effective 2026-02-08 through 2026-02-12

-


-


-

-

British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A319 (319)

직항 공동운항:

Iberia IB3711
Effective 2026-02-11 through 2026-02-21

-

-


-

-


-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Effective 2026-02-13 through 2026-03-06

-

-

-

-


-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB3711
Effective 2026-02-15 through 2026-02-22

-


-

-

-

-

British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A321neo (32Q)

직항 공동운항:

Iberia IB3711
Operates only on 2026-02-19

-

-

-


-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A319 (319)

직항 공동운항:

Iberia IB3711
Effective 2026-02-24 through 2026-03-03

-


-

-

-

-

British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Effective 2026-02-25 through 2026-02-28

-

-


-

-


-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A321neo (32Q)

직항 공동운항:

Iberia IB3711
Effective 2026-03-04 through 2026-03-10

-




-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Effective 2026-03-08 through 2026-03-13

-

-

-

-


-

British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB3711
Effective 2026-03-11 through 2026-03-18

-

-


-

-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A321neo (32Q)

직항 공동운항:

Iberia IB3711
Effective 2026-03-12 through 2026-03-21

-


-


-


British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Effective 2026-03-20 through 2026-03-27

-

-

-

-


-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320 (320)

직항 공동운항:

Iberia IB3711
Operates only on 2026-03-22

-

-

-

-

-

-

British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A321neo (32Q)

직항 공동운항:

Iberia IB3711
Effective 2026-03-24 through 2026-03-28

-




-


-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Effective from 2026-10-25

-


-


-


British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Effective from 2026-10-28

-

-


-


-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:20, non-stop
Airbus A319 (319)

직항 공동운항:

Iberia IB3711
Effective 2026-04-01 through 2026-10-21

-

-


-

-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:15, non-stop
Airbus A320neo (32N)

직항 공동운항:

Iberia IB3711
Effective 2026-03-31 through 2026-10-20

-


-

-

-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:15, non-stop
Airbus A319 (319)

직항 공동운항:

Iberia IB3711
Effective 2026-04-02 through 2026-10-22

-

-

-


-

-

-
British Airways 공동운항편 (BA 1334)
Duration: 1:15, non-stop
Airbus A320neo (32N)
  • IB 3711 국내선입니다. London Heathrow 공항 (LHR) 출발하여, Newcastle 공항(NCL) 도착합니다.
  • 비행 거리는 252 마일, 405 킬로미터(km)입니다.
  • 출발 및 도착 공항의 타임존 UTC+0 . 두 공항 현지 시간 기준 (loading...).
  • 직항편 비행 시간은 최소 1:15에서 최대 1:20 변동될 수 있습니다.