すべての航空会社がTampa (TPA)から出発、Minneapolis/Saint Paul (MSP)に到着.

搭乗日を選択
フライト時刻表
直行便:
土 06:15 Tampa (TPA) 08:51 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 212 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-21
日 06:30 Tampa (TPA) 09:06 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 212 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-22
金 07:00 Tampa (TPA) 09:36 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 212 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-06
金 07:05 Tampa (TPA) 09:36 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 212 Non-stop Boeing 737-800 (738) 3:31 Operates only on 2026-02-13
金 07:05 Tampa (TPA) 09:41 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 212 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-04-03
月 07:15 Tampa (TPA) 09:51 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 212 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-09
日 07:15 Tampa (TPA) 09:51 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 212 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-29
土 07:45 Tampa (TPA) 10:18 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 212 Non-stop Boeing 737-800 (738) 3:33 Operates only on 2026-02-28
土 08:00 Tampa (TPA) 10:36 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 212 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-07
土 08:15 Tampa (TPA) 10:46 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 212 Non-stop Boeing 737-800 (738) 3:31 Operates only on 2026-02-14
日 08:30 Tampa (TPA) 10:57 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 212 Non-stop Boeing 737-800 (738) 3:27 Operates only on 2026-01-04
土 08:45 Tampa (TPA) 11:21 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 212 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-14
土 09:00 Tampa (TPA) 11:36 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 212 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-28
月 09:15 Tampa (TPA) 11:51 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 212 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-02-23
月 19:56 Tampa (TPA) 22:29 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 212 Non-stop Boeing 737-800 (738) 3:33 Operates only on 2026-03-30
土 10:24 Tampa (TPA) 13:00 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-02-28
土 10:30 Tampa (TPA) 13:06 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-28
土 10:31 Tampa (TPA) 13:07 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-21
土 10:38 Tampa (TPA) 13:14 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-02-21
日 10:38 Tampa (TPA) 13:14 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-15
木 10:42 Tampa (TPA) 13:18 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-02-26
金 10:42 Tampa (TPA) 13:18 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-13
土 10:50 Tampa (TPA) 13:21 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:31 Operates only on 2026-02-07
日 10:51 Tampa (TPA) 13:27 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-08
金,日 10:51 Tampa (TPA) 13:27 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Effective 2026-03-20 through 2026-03-22
土 10:53 Tampa (TPA) 13:24 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:31 Operates only on 2026-01-10
金 10:54 Tampa (TPA) 13:30 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-02-20
木 10:54 Tampa (TPA) 13:30 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-12
木-土 11:00 Tampa (TPA) 13:36 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Effective 2026-03-05 through 2026-03-07
木 11:00 Tampa (TPA) 13:36 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-26
月 11:02 Tampa (TPA) 13:38 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-23
金 11:05 Tampa (TPA) 13:27 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:22 Operates only on 2026-07-17
木 11:05 Tampa (TPA) 13:27 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:22 Operates only on 2026-08-06
日 11:06 Tampa (TPA) 13:42 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-02-22
月 11:06 Tampa (TPA) 13:42 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-16
金 11:12 Tampa (TPA) 13:48 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-02-27
木 11:12 Tampa (TPA) 13:48 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-19
水 11:18 Tampa (TPA) 13:54 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-03-25
木 11:21 Tampa (TPA) 13:51 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:30 Operates only on 2026-04-16
月,金 11:21 Tampa (TPA) 13:51 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:30 Effective 2026-04-24 through 2026-04-27
月,日 11:24 Tampa (TPA) 14:00 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Effective 2026-03-29 through 2026-03-30
金,土 11:28 Tampa (TPA) 13:58 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:30 Effective 2026-04-11 through 2026-04-17
月 11:28 Tampa (TPA) 13:58 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:30 Operates only on 2026-04-20
土 11:29 Tampa (TPA) 14:00 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:31 Operates only on 2026-01-31
土 11:29 Tampa (TPA) 14:00 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:31 Operates only on 2026-02-14
月 11:29 Tampa (TPA) 13:51 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:22 Operates only on 2026-07-06
月 11:29 Tampa (TPA) 13:51 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:22 Operates only on 2026-08-17
月,日 11:30 Tampa (TPA) 14:06 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Effective 2026-03-01 through 2026-03-02
木,土 11:30 Tampa (TPA) 14:06 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:36 Effective 2026-04-02 through 2026-04-04
金 11:34 Tampa (TPA) 14:04 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 214 Non-stop Boeing 737-800 (738) 3:30 Operates only on 2026-04-10
1 2 3 4 5 6 7   next


すべての航空会社がTampa (TPA)から出発、Minneapolis/Saint Paul (MSP)に到着.
搭乗日を選択
フライト時刻表
直行便:

Operates only on 2026-03-21

-

-

-

-

-


-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-22

-

-

-

-

-

-

Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-06

-

-

-

-


-

-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-02-13

-

-

-

-


-

-
Duration: 3:31, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-04-03

-

-

-

-


-

-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-09


-

-

-

-

-

-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-29

-

-

-

-

-

-

Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-02-28

-

-

-

-

-


-
Duration: 3:33, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-07

-

-

-

-

-


-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-02-14

-

-

-

-

-


-
Duration: 3:31, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-01-04

-

-

-

-

-

-

Duration: 3:27, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-14

-

-

-

-

-


-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-28

-

-

-

-

-


-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-02-23


-

-

-

-

-

-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-30


-

-

-

-

-

-
Duration: 3:33, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-02-28

-

-

-

-

-


-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-28

-

-

-

-

-


-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-21

-

-

-

-

-


-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-02-21

-

-

-

-

-


-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-15

-

-

-

-

-

-

Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-02-26

-

-

-


-

-

-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-13

-

-

-

-


-

-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-02-07

-

-

-

-

-


-
Duration: 3:31, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-08

-

-

-

-

-

-

Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-03-20 through 2026-03-22

-

-

-

-


-

Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-01-10

-

-

-

-

-


-
Duration: 3:31, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-02-20

-

-

-

-


-

-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-12

-

-

-


-

-

-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-03-05 through 2026-03-07

-

-

-




-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-26

-

-

-


-

-

-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-23


-

-

-

-

-

-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-07-17

-

-

-

-


-

-
Duration: 3:22, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-08-06

-

-

-


-

-

-
Duration: 3:22, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-02-22

-

-

-

-

-

-

Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-16


-

-

-

-

-

-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-02-27

-

-

-

-


-

-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-19

-

-

-


-

-

-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-25

-

-


-

-

-

-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-04-16

-

-

-


-

-

-
Duration: 3:30, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-04-24 through 2026-04-27


-

-

-


-

-
Duration: 3:30, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-03-29 through 2026-03-30


-

-

-

-

-

Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-04-11 through 2026-04-17

-

-

-

-



-
Duration: 3:30, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-04-20


-

-

-

-

-

-
Duration: 3:30, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-01-31

-

-

-

-

-


-
Duration: 3:31, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-02-14

-

-

-

-

-


-
Duration: 3:31, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-07-06


-

-

-

-

-

-
Duration: 3:22, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-08-17


-

-

-

-

-

-
Duration: 3:22, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-03-01 through 2026-03-02


-

-

-

-

-

Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-04-02 through 2026-04-04

-

-

-


-


-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-04-10

-

-

-

-


-

-
Duration: 3:30, non-stop
Boeing 737-800 (738)
Page 1 / 7        next
  • 国内線 Tampa (TPA)空港から出発、 Minneapolis/Saint Paul (MSP)空港に到着。
  • この飛行距離は1307 マイルか 2103キロメートルです。
  • 出発地のタイムゾーンは UTC-5 , 目的地のタイムゾーンは UTC-6 . 出発地の現地時間が(loading...)に、目的地の現地時間が(loading...)です。 出発地と目的地の時差は(loading...)時間です。
  • 直行便で最短フライト時間は 3:22 と最長フライト時間は3:37です。