すべての航空会社がOrlando (MCO)から出発、Minneapolis/Saint Paul (MSP)に到着.

搭乗日を選択
フライト時刻表
直行便:
日 10:52 Orlando (MCO) B 13:36 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:44 Operates only on 2026-03-15
木,金 10:52 Orlando (MCO) B 13:48 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:56 Effective 2026-03-26 through 2026-03-27
土 10:55 Orlando (MCO) B 13:36 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:41 Operates only on 2026-01-31
土 10:56 Orlando (MCO) B 13:42 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:46 Operates only on 2026-04-04
日 10:58 Orlando (MCO) B 13:42 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:44 Operates only on 2026-03-29
土 11:01 Orlando (MCO) B 13:37 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-01-03
木,金 11:02 Orlando (MCO) B 13:48 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:46 Effective 2026-02-19 through 2026-02-20
月 11:08 Orlando (MCO) B 13:54 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:46 Operates only on 2026-02-23
木 11:08 Orlando (MCO) B 13:54 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:46 Operates only on 2026-03-05
日 11:10 Orlando (MCO) B 13:54 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:44 Effective 2026-02-22 through 2026-03-01
木 11:12 Orlando (MCO) B 13:58 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:46 Operates only on 2026-02-26
木-土 11:13 Orlando (MCO) B 13:54 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:41 Effective 2026-02-12 through 2026-02-14
月,金 11:14 Orlando (MCO) B 13:54 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:40 Effective 2026-04-13 through 2026-04-20
月 11:14 Orlando (MCO) B 13:54 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:40 Operates only on 2026-04-27
金,日 11:18 Orlando (MCO) B 13:58 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:40 Effective 2026-04-24 through 2026-04-26
土 11:19 Orlando (MCO) B 14:00 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:41 Operates only on 2026-01-24
月 11:20 Orlando (MCO) B 14:06 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:46 Effective 2026-03-02 through 2026-03-23
月 11:20 Orlando (MCO) B 14:06 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:46 Operates only on 2026-04-06
日 11:22 Orlando (MCO) B 14:06 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:44 Operates only on 2026-04-05
土 11:24 Orlando (MCO) B 14:04 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:40 Operates only on 2026-04-25
月 11:26 Orlando (MCO) B 14:12 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:46 Operates only on 2026-03-30
木,日 11:27 Orlando (MCO) B 14:01 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:34 Effective 2026-04-16 through 2026-04-19
金 11:32 Orlando (MCO) B 14:18 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:46 Operates only on 2026-04-03
日 11:32 Orlando (MCO) B 13:59 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:27 Operates only on 2026-06-28
木 11:32 Orlando (MCO) B 13:59 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:27 Operates only on 2026-07-09
月 11:34 Orlando (MCO) B 14:08 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:34 Operates only on 2026-05-25
日 11:36 Orlando (MCO) B 14:12 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:36 Operates only on 2026-01-04
土 11:37 Orlando (MCO) B 14:18 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:41 Operates only on 2026-01-10
金 11:37 Orlando (MCO) B 14:10 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:33 Operates only on 2026-08-28
金 11:38 Orlando (MCO) B 14:24 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:46 Operates only on 2026-03-20
木,土 11:38 Orlando (MCO) B 14:18 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:40 Effective 2026-04-18 through 2026-04-23
火,水 11:39 Orlando (MCO) B 14:18 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:39 Effective 2026-04-08 through 2026-04-28
月,水 11:39 Orlando (MCO) B 14:13 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:34 Effective 2026-05-04 through 2026-05-06
月 11:42 Orlando (MCO) B 14:09 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:27 Operates only on 2026-06-22
日 11:43 Orlando (MCO) B 14:24 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:41 Operates only on 2026-01-11
月 11:43 Orlando (MCO) B 14:24 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:41 Operates only on 2026-01-19
月,水-金,日 11:43 Orlando (MCO) B 14:24 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:41 Effective 2026-02-01 through 2026-02-06
月 11:43 Orlando (MCO) B 14:24 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:41 Effective 2026-02-09 through 2026-02-16
火 11:44 Orlando (MCO) B 14:25 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:41 Operates only on 2026-02-03
水 11:44 Orlando (MCO) B 14:30 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:46 Effective 2026-02-18 through 2026-02-25
火,水 11:44 Orlando (MCO) B 14:30 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:46 Effective 2026-03-03 through 2026-04-01
火 11:44 Orlando (MCO) B 14:27 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:43 Operates only on 2026-04-07
火,水,金,土 11:44 Orlando (MCO) B 14:18 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:34 Effective 2026-04-29 through 2026-05-05
月-木,土 11:44 Orlando (MCO) B 14:18 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:34 Effective 2026-05-09 through 2026-05-16
火,水,土,日 11:44 Orlando (MCO) B 14:18 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:34 Effective 2026-05-19 through 2026-05-24
水 11:44 Orlando (MCO) B 14:18 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:34 Operates only on 2026-05-27
火 11:47 Orlando (MCO) B 14:30 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:43 Operates only on 2026-02-24
金 11:47 Orlando (MCO) B 14:14 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:27 Operates only on 2026-06-26
月 11:47 Orlando (MCO) B 14:20 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:33 Operates only on 2026-08-31
月,金 11:49 Orlando (MCO) B 14:30 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 342 Non-stop Boeing 737-800 (738) 3:41 Effective 2026-01-09 through 2026-01-16
prev   1 2 3 4 5 ... 11 12 13   next


すべての航空会社がOrlando (MCO)から出発、Minneapolis/Saint Paul (MSP)に到着.
搭乗日を選択
フライト時刻表
直行便:

Operates only on 2026-03-15

-

-

-

-

-

-

Duration: 3:44, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-03-26 through 2026-03-27

-

-

-



-

-
Duration: 3:56, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-01-31

-

-

-

-

-


-
Duration: 3:41, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-04-04

-

-

-

-

-


-
Duration: 3:46, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-29

-

-

-

-

-

-

Duration: 3:44, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-01-03

-

-

-

-

-


-
Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-02-19 through 2026-02-20

-

-

-



-

-
Duration: 3:46, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-02-23


-

-

-

-

-

-
Duration: 3:46, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-05

-

-

-


-

-

-
Duration: 3:46, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-02-22 through 2026-03-01

-

-

-

-

-

-

Duration: 3:44, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-02-26

-

-

-


-

-

-
Duration: 3:46, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-02-12 through 2026-02-14

-

-

-




-
Duration: 3:41, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-04-13 through 2026-04-20


-

-

-


-

-
Duration: 3:40, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-04-27


-

-

-

-

-

-
Duration: 3:40, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-04-24 through 2026-04-26

-

-

-

-


-

Duration: 3:40, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-01-24

-

-

-

-

-


-
Duration: 3:41, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-03-02 through 2026-03-23


-

-

-

-

-

-
Duration: 3:46, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-04-06


-

-

-

-

-

-
Duration: 3:46, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-04-05

-

-

-

-

-

-

Duration: 3:44, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-04-25

-

-

-

-

-


-
Duration: 3:40, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-30


-

-

-

-

-

-
Duration: 3:46, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-04-16 through 2026-04-19

-

-

-


-

-

Duration: 3:34, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-04-03

-

-

-

-


-

-
Duration: 3:46, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-06-28

-

-

-

-

-

-

Duration: 3:27, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-07-09

-

-

-


-

-

-
Duration: 3:27, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-05-25


-

-

-

-

-

-
Duration: 3:34, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-01-04

-

-

-

-

-

-

Duration: 3:36, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-01-10

-

-

-

-

-


-
Duration: 3:41, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-08-28

-

-

-

-


-

-
Duration: 3:33, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-03-20

-

-

-

-


-

-
Duration: 3:46, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-04-18 through 2026-04-23

-

-

-


-


-
Duration: 3:40, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-04-08 through 2026-04-28

-



-

-

-

-
Duration: 3:39, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-05-04 through 2026-05-06


-


-

-

-

-
Duration: 3:34, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-06-22


-

-

-

-

-

-
Duration: 3:27, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-01-11

-

-

-

-

-

-

Duration: 3:41, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-01-19


-

-

-

-

-

-
Duration: 3:41, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-02-01 through 2026-02-06


-




-

Duration: 3:41, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-02-09 through 2026-02-16


-

-

-

-

-

-
Duration: 3:41, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-02-03

-


-

-

-

-

-
Duration: 3:41, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-02-18 through 2026-02-25

-

-


-

-

-

-
Duration: 3:46, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-03-03 through 2026-04-01

-



-

-

-

-
Duration: 3:46, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-04-07

-


-

-

-

-

-
Duration: 3:43, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-04-29 through 2026-05-05

-



-



-
Duration: 3:34, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-05-09 through 2026-05-16





-


-
Duration: 3:34, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-05-19 through 2026-05-24

-



-

-


Duration: 3:34, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-05-27

-

-


-

-

-

-
Duration: 3:34, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-02-24

-


-

-

-

-

-
Duration: 3:43, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-06-26

-

-

-

-


-

-
Duration: 3:27, non-stop
Boeing 737-800 (738)

直行便:

Operates only on 2026-08-31


-

-

-

-

-

-
Duration: 3:33, non-stop
Boeing 737-800 (738)

直行便:

Effective 2026-01-09 through 2026-01-16


-

-

-


-

-
Duration: 3:41, non-stop
Boeing 737-800 (738)
prev        Page 2 / 13        next
  • 国内線 Orlando (MCO)空港から出発、 Minneapolis/Saint Paul (MSP)空港に到着。
  • この飛行距離は1310 マイルか 2108キロメートルです。
  • 出発地のタイムゾーンは UTC-5 , 目的地のタイムゾーンは UTC-6 . 出発地の現地時間が(loading...)に、目的地の現地時間が(loading...)です。 出発地と目的地の時差は(loading...)時間です。
  • 直行便で最短フライト時間は 3:27 と最長フライト時間は3:56です。