| フライト時刻表 |
|---|
| 直行-コードシェア便: |
| 月,火,金,日
22:25
Rome Leonardo da Vinci Fiumicino (FCO) 3
04:50
Doha (DOH) Virgin Australia VA 6276 Non-stop Boeing 787-8 (788) 5:25 Effective 2026-07-24 through 2026-07-31 Codeshare flight, operated by Qatar Airways.(QR 114) The flight arrives 1 day after departure. |
| 月-木,土,日
22:25
Rome Leonardo da Vinci Fiumicino (FCO) 3
04:50
Doha (DOH) Virgin Australia VA 6276 Non-stop Airbus A350-900 (359) 5:25 Effective 2026-07-29 through 2026-08-06 Codeshare flight, operated by Qatar Airways.(QR 114) The flight arrives 1 day after departure. |
| 月,火,木-日
22:25
Rome Leonardo da Vinci Fiumicino (FCO) 3
04:50
Doha (DOH) Virgin Australia VA 6276 Non-stop Airbus A350-900 (359) 5:25 Effective 2026-08-07 through 2026-08-18 Codeshare flight, operated by Qatar Airways.(QR 114) The flight arrives 1 day after departure. |
| 水
22:25
Rome Leonardo da Vinci Fiumicino (FCO) 3
04:50
Doha (DOH) Virgin Australia VA 6276 Non-stop Boeing 787-8 (788) 5:25 Operates only on 2026-08-12 Codeshare flight, operated by Qatar Airways.(QR 114) The flight arrives 1 day after departure. |
| 日々
22:25
Rome Leonardo da Vinci Fiumicino (FCO) 3
04:50
Doha (DOH) Virgin Australia VA 6276 Non-stop Airbus A350-900 (359) 5:25 Effective 2026-08-19 through 2026-08-30 Codeshare flight, operated by Qatar Airways.(QR 114) The flight arrives 1 day after departure. |
| 月
22:25
Rome Leonardo da Vinci Fiumicino (FCO) 3
04:50
Doha (DOH) Virgin Australia VA 6276 Non-stop Boeing 787-8 (788) 5:25 Operates only on 2026-08-31 Codeshare flight, operated by Qatar Airways.(QR 114) The flight arrives 1 day after departure. |
| 月-土
22:25
Rome Leonardo da Vinci Fiumicino (FCO) 3
04:50
Doha (DOH) Virgin Australia VA 6276 Non-stop Airbus A350-900 (359) 5:25 Effective 2026-09-01 through 2026-09-12 Codeshare flight, operated by Qatar Airways.(QR 114) The flight arrives 1 day after departure. |
| 日
22:25
Rome Leonardo da Vinci Fiumicino (FCO) 3
04:50
Doha (DOH) Virgin Australia VA 6276 Non-stop Airbus A350-1000 (351) 5:25 Operates only on 2026-09-06 Codeshare flight, operated by Qatar Airways.(QR 114) The flight arrives 1 day after departure. |
| 月,火,木-日
22:25
Rome Leonardo da Vinci Fiumicino (FCO) 3
04:50
Doha (DOH) Virgin Australia VA 6276 Non-stop Airbus A350-900 (359) 5:25 Effective 2026-09-13 through 2026-09-22 Codeshare flight, operated by Qatar Airways.(QR 114) The flight arrives 1 day after departure. |
| 水
22:25
Rome Leonardo da Vinci Fiumicino (FCO) 3
04:50
Doha (DOH) Virgin Australia VA 6276 Non-stop Boeing 787-8 (788) 5:25 Operates only on 2026-09-16 Codeshare flight, operated by Qatar Airways.(QR 114) The flight arrives 1 day after departure. |
| 日々
22:25
Rome Leonardo da Vinci Fiumicino (FCO) 3
04:50
Doha (DOH) Virgin Australia VA 6276 Non-stop Airbus A350-900 (359) 5:25 Effective 2026-09-23 through 2026-10-01 Codeshare flight, operated by Qatar Airways.(QR 114) The flight arrives 1 day after departure. |
| 金
22:25
Rome Leonardo da Vinci Fiumicino (FCO) 3
04:50
Doha (DOH) Virgin Australia VA 6276 Non-stop Boeing 787-8 (788) 5:25 Operates only on 2026-10-02 Codeshare flight, operated by Qatar Airways.(QR 114) The flight arrives 1 day after departure. |
| 日々
22:25
Rome Leonardo da Vinci Fiumicino (FCO) 3
04:50
Doha (DOH) Virgin Australia VA 6276 Non-stop Airbus A350-900 (359) 5:25 Effective 2026-10-03 through 2026-10-18 Codeshare flight, operated by Qatar Airways.(QR 114) The flight arrives 1 day after departure. |
| 水,木,土
22:25
Rome Leonardo da Vinci Fiumicino (FCO) 3
04:50
Doha (DOH) Virgin Australia VA 6276 Non-stop Airbus A350-900 (359) 5:25 Effective 2026-10-21 through 2026-10-24 Codeshare flight, operated by Qatar Airways.(QR 114) The flight arrives 1 day after departure. |
1
2