| フライト時刻表 |
|---|
| 直行-コードシェア便: |
| 木,土
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-05-10 through 2025-05-15 Codeshare flight, operated by Saudia.(SV 803) |
| 月,土
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777 (777) 6:55 Effective 2025-05-12 through 2025-05-17 Codeshare flight, operated by Saudia.(SV 803) |
| 月,火,日
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-05-18 through 2025-05-20 Codeshare flight, operated by Saudia.(SV 803) |
| 木
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777 (777) 6:55 Operates only on 2025-05-22 Codeshare flight, operated by Saudia.(SV 803) |
| 月-水,金-日
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-06-01 through 2025-06-09 Codeshare flight, operated by Saudia.(SV 803) |
| 火-木
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777 (777) 6:55 Effective 2025-06-05 through 2025-06-11 Codeshare flight, operated by Saudia.(SV 803) |
| 火-木,日
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-06-12 through 2025-06-19 Codeshare flight, operated by Saudia.(SV 803) |
| 月,金,土
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777 (777) 6:55 Effective 2025-06-13 through 2025-06-16 Codeshare flight, operated by Saudia.(SV 803) |
| 日々
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-06-20 through 2025-06-28 Codeshare flight, operated by Saudia.(SV 803) |
| 日
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777 (777) 6:55 Effective 2025-06-29 through 2025-07-06 Codeshare flight, operated by Saudia.(SV 803) |
| 月-土
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-06-30 through 2025-07-07 Codeshare flight, operated by Saudia.(SV 803) |
| 火
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777 (777) 6:55 Operates only on 2025-07-08 Codeshare flight, operated by Saudia.(SV 803) |
| 日々
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-07-09 through 2025-07-19 Codeshare flight, operated by Saudia.(SV 803) |
| 水,日
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777 (777) 6:55 Effective 2025-07-20 through 2025-07-23 Codeshare flight, operated by Saudia.(SV 803) |
| 月,火,木-日
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-07-21 through 2025-07-29 Codeshare flight, operated by Saudia.(SV 803) |
| 月,水-日
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-07-30 through 2025-08-18 Codeshare flight, operated by Saudia.(SV 803) |
| 火
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777 (777) 6:55 Effective 2025-08-05 through 2025-08-12 Codeshare flight, operated by Saudia.(SV 803) |
| 日々
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-08-19 through 2025-08-31 Codeshare flight, operated by Saudia.(SV 803) |
| 月,火
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777 (777) 6:55 Effective 2025-09-01 through 2025-09-02 Codeshare flight, operated by Saudia.(SV 803) |
| 月,水-日
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-09-03 through 2025-09-15 Codeshare flight, operated by Saudia.(SV 803) |
| 火
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777 (777) 6:55 Operates only on 2025-09-09 Codeshare flight, operated by Saudia.(SV 803) |
| 日々
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-09-16 through 2025-09-22 Codeshare flight, operated by Saudia.(SV 803) |
| 火
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777 (777) 6:55 Operates only on 2025-09-23 Codeshare flight, operated by Saudia.(SV 803) |
| 日々
02:15
Dhaka (DAC) 1
06:10
Jeddah (JED) 1 ITA Airways AZ 5217 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-09-24 through 2025-10-25 Codeshare flight, operated by Saudia.(SV 803) |
| 金,日
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-05-09 through 2025-05-11 Codeshare flight, operated by Saudia.(SV 809) |
| 金
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777 (777) 6:55 Operates only on 2025-05-16 Codeshare flight, operated by Saudia.(SV 809) |
| 水
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777-300 (773) 6:55 Operates only on 2025-05-21 Codeshare flight, operated by Saudia.(SV 809) |
| 金,日
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777 (777) 6:55 Effective 2025-06-01 through 2025-06-06 Codeshare flight, operated by Saudia.(SV 809) |
| 月-木,土,日
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-06-02 through 2025-06-09 Codeshare flight, operated by Saudia.(SV 809) |
| 火,土
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777 (777) 6:55 Effective 2025-06-10 through 2025-06-14 Codeshare flight, operated by Saudia.(SV 809) |
| 月-金,日
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-06-11 through 2025-06-17 Codeshare flight, operated by Saudia.(SV 809) |
| 月-金
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777 (777) 6:55 Effective 2025-06-18 through 2025-06-24 Codeshare flight, operated by Saudia.(SV 809) |
| 水-日
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-06-21 through 2025-06-29 Codeshare flight, operated by Saudia.(SV 809) |
| 月,水,木,日
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777 (777) 6:55 Effective 2025-06-30 through 2025-07-06 Codeshare flight, operated by Saudia.(SV 809) |
| 月,火,金,土
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-07-01 through 2025-07-08 Codeshare flight, operated by Saudia.(SV 809) |
| 日々
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-07-09 through 2025-07-17 Codeshare flight, operated by Saudia.(SV 809) |
| 月,木,金
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777 (777) 6:55 Effective 2025-07-18 through 2025-07-24 Codeshare flight, operated by Saudia.(SV 809) |
| 火,水,金-日
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-07-19 through 2025-07-27 Codeshare flight, operated by Saudia.(SV 809) |
| 月-水,金-日
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-07-28 through 2025-08-08 Codeshare flight, operated by Saudia.(SV 809) |
| 木
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777 (777) 6:55 Effective 2025-07-31 through 2025-08-07 Codeshare flight, operated by Saudia.(SV 809) |
| 土
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777 (777) 6:55 Operates only on 2025-08-09 Codeshare flight, operated by Saudia.(SV 809) |
| 日々
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-08-10 through 2025-08-22 Codeshare flight, operated by Saudia.(SV 809) |
| 水,金,土
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777 (777) 6:55 Effective 2025-08-23 through 2025-08-29 Codeshare flight, operated by Saudia.(SV 809) |
| 月,火,木,土,日
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-08-24 through 2025-09-02 Codeshare flight, operated by Saudia.(SV 809) |
| 月-木,土,日
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-09-03 through 2025-09-10 Codeshare flight, operated by Saudia.(SV 809) |
| 木,金
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777 (777) 6:55 Effective 2025-09-05 through 2025-09-11 Codeshare flight, operated by Saudia.(SV 809) |
| 日々
12:50
Dhaka (DAC) 1
16:45
Jeddah (JED) 1 ITA Airways AZ 5431 Non-stop Boeing 777-300 (773) 6:55 Effective 2025-09-12 through 2025-10-25 Codeshare flight, operated by Saudia.(SV 809) |