| フライト時刻表 |
|---|
| 直行-コードシェア便: |
| 水,日
15:05
Lagos (LOS) 2I
23:55
Doha (DOH) VA 6257 Non-stop Boeing 787-9 (789) 6:50 Effective 2026-03-29 through 2026-04-15 Codeshare flight, operated by Qatar Airways.(QR 1406) |
| 金
15:05
Lagos (LOS) 2I
23:55
Doha (DOH) VA 6257 Non-stop Boeing 787-8 (788) 6:50 Effective 2026-04-03 through 2026-04-10 Codeshare flight, operated by Qatar Airways.(QR 1406) |
| 水,金,日
15:05
Lagos (LOS) 2I
23:55
Doha (DOH) VA 6257 Non-stop Boeing 787-9 (789) 6:50 Effective 2026-04-17 through 2026-04-29 Codeshare flight, operated by Qatar Airways.(QR 1406) |
| 水,金,日
15:05
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-9 (789) 7:20 Effective 2026-05-01 through 2026-06-17 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 水-日
15:05
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-9 (789) 7:20 Effective 2026-06-18 through 2026-09-06 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 日々
15:05
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-9 (789) 7:20 Effective 2026-09-07 through 2026-09-30 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 日々
15:05
Lagos (LOS) 2I
00:10
Doha (DOH) VA 6257 Non-stop Boeing 787-9 (789) 7:05 Effective 2026-10-01 through 2026-10-24 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 火-土
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-9 (789) 6:55 Valid until 2026-01-01 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 月,金-日
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-8 (788) 6:55 Valid until 2026-01-05 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 月-水,土,日
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-8 (788) 6:55 Effective 2026-01-06 through 2026-01-12 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 火,木,金
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-9 (789) 6:55 Effective 2026-01-08 through 2026-01-15 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 月-水,金
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-8 (788) 6:55 Effective 2026-01-14 through 2026-01-23 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 木,土,日
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-9 (789) 6:55 Effective 2026-01-17 through 2026-01-22 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 月,水,土,日
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-8 (788) 6:55 Effective 2026-01-24 through 2026-01-28 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 火,木-土
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-9 (789) 6:55 Effective 2026-01-27 through 2026-02-05 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 月,水,金,日
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-8 (788) 6:55 Effective 2026-02-01 through 2026-02-27 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 火,木,土
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-9 (789) 6:55 Effective 2026-02-07 through 2026-02-17 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 火,日
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-9 (789) 6:55 Effective 2026-02-24 through 2026-03-03 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 月
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-8 (788) 6:55 Effective 2026-03-02 through 2026-03-09 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 火,水,金,日
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-9 (789) 6:55 Effective 2026-03-04 through 2026-03-11 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 月,金,日
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-8 (788) 6:55 Effective 2026-03-13 through 2026-03-23 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 火,水,土
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-9 (789) 6:55 Effective 2026-03-17 through 2026-03-24 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 水,金
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-8 (788) 6:55 Effective 2026-03-25 through 2026-03-27 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 木,土
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-9 (789) 6:55 Effective 2026-03-26 through 2026-03-28 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |
| 水,金,日
15:30
Lagos (LOS) 2I
00:25
Doha (DOH) VA 6257 Non-stop Boeing 787-9 (789) 6:55 Effective from 2026-10-25 Codeshare flight, operated by Qatar Airways.(QR 1406) The flight arrives 1 day after departure. |