Southwest Airlines フライト WN 2676: Multiple routes

搭乗日を選択
フライト時刻表
直行便:
土 05:30 Sacramento (SMF) B 06:55 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
WN 2676 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2024-01-06
月,日 05:40 Sacramento (SMF) B 07:05 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
WN 2676 Non-stop Boeing 737-800 (73H) 1:25 Valid until 2024-01-01
水-金,日 05:40 Sacramento (SMF) B 07:05 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
WN 2676 Non-stop Boeing 737-800 (73H) 1:25 Effective 2024-01-03 through 2024-01-07
火-金 05:55 Sacramento (SMF) B 07:20 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
WN 2676 Non-stop Boeing 737-800 (73H) 1:25 Valid until 2024-01-02
土 07:20 Oakland (OAK) 2 10:45 Denver (DEN)
WN 2676 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-03-09 through 2024-04-06
土 07:55 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 12:30 Austin (AUS)
WN 2676 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Operates only on 2024-01-06
土 08:00 Louisville (SDF) 08:20 Midway, Chicago (MDW)
WN 2676 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-01-13 through 2024-03-02
日 08:55 Midway, Chicago (MDW) 11:15 Pittsburgh (PIT)
WN 2676 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-04-14 through 2024-05-19
日 08:55 Midway, Chicago (MDW) 11:15 Pittsburgh (PIT)
WN 2676 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Operates only on 2024-06-02
日 09:00 Midway, Chicago (MDW) 11:20 Pittsburgh (PIT)
WN 2676 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Operates only on 2024-05-26
月,木,金 09:05 Sacramento (SMF) B 10:25 Ontario, Los Angeles (ONT) 4
WN 2676 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-06-06 through 2024-07-01
日 09:05 Sacramento (SMF) B 10:25 Ontario, Los Angeles (ONT) 4
WN 2676 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-06-09 through 2024-08-04
月,木,金 09:05 Sacramento (SMF) B 10:25 Ontario, Los Angeles (ONT) 4
WN 2676 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-07-08 through 2024-08-02
土 09:15 Midway, Chicago (MDW) 11:45 Love Field, Dallas (DAL) 1
WN 2676 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2024-01-13 through 2024-03-02
火,水 09:45 Sacramento (SMF) B 11:05 Ontario, Los Angeles (ONT) 4
WN 2676 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-06-04 through 2024-07-31
木 09:50 Sacramento (SMF) B 11:10 Ontario, Los Angeles (ONT) 4
WN 2676 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2024-07-04
火,水 11:20 Edward L. Logan, Boston (BOS) B 12:50 Baltimore (BWI)
WN 2676 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2024-04-09 through 2024-05-29
月,木,金 11:50 Edward L. Logan, Boston (BOS) B 13:20 Baltimore (BWI)
WN 2676 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-04-11 through 2024-06-03
土 11:50 Edward L. Logan, Boston (BOS) B 13:20 Baltimore (BWI)
WN 2676 Non-stop Boeing 737-800 (738) 1:30 Effective 2024-04-13 through 2024-06-01
土 12:40 Love Field, Dallas (DAL) 1 13:40 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
WN 2676 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2024-01-13 through 2024-03-02
日 12:55 Love Field, Dallas (DAL) 1 14:00 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
WN 2676 Non-stop Boeing 737 MAX 8 (7M8) 3:05 Effective 2024-01-14 through 2024-03-03
日 15:50 Nashville (BNA) 17:40 Denver (DEN)
WN 2676 Non-stop Boeing 737-800 (73H) 2:50 Operates only on 2024-09-01
日 16:40 Nashville (BNA) 18:30 Denver (DEN)
WN 2676 Non-stop Boeing 737-800 (73H) 2:50 Effective 2024-08-11 through 2024-08-25
日 16:40 Nashville (BNA) 18:30 Denver (DEN)
WN 2676 Non-stop Boeing 737-800 (73H) 2:50 Effective 2024-09-08 through 2024-09-29
火,水 17:10 Nashville (BNA) 19:00 Denver (DEN)
WN 2676 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2024-08-06 through 2024-10-02
月,木,金 17:25 Nashville (BNA) 19:15 Denver (DEN)
WN 2676 Non-stop Boeing 737-700 (73W) 2:50 Effective 2024-08-05 through 2024-09-30
日 20:00 Oakland (OAK) 2 23:25 Denver (DEN)
WN 2676 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-03-10 through 2024-04-07
火,水 21:10 Oakland (OAK) 2 00:30 Denver (DEN)
WN 2676 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-03-12 through 2024-04-03
The flight arrives 1 day after departure.
月,木,金 21:30 Oakland (OAK) 2 00:50 Denver (DEN)
WN 2676 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-03-07 through 2024-04-08
The flight arrives 1 day after departure.
乗継便:
土 05:30 Sacramento (SMF) B 12:30 Austin (AUS)
WN 2676 1-stop Boeing 737 MAX 8 (7M8) 5:00 Operates only on 2024-01-06
土 08:00 Louisville (SDF) 11:45 Love Field, Dallas (DAL) 1
WN 2676 1-stop Boeing 737 MAX 8 (7M8) 4:45 Effective 2024-01-13 through 2024-03-02
土 09:15 Midway, Chicago (MDW) 13:40 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
WN 2676 1-stop Boeing 737 MAX 8 (7M8) 6:25 Effective 2024-01-13 through 2024-03-02
土 08:00 Louisville (SDF) 13:40 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
WN 2676 2-stop Boeing 737 MAX 8 (7M8) 8:40 Effective 2024-01-13 through 2024-03-02
This flight number is listed as serving the following routes:
Southwest Airlines フライト WN 2676: Multiple routes
搭乗日を選択
フライト時刻表
直行便:

Southwest Airlines WN2676
Operates only on 2024-01-06

-

-

-

-

-


-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Valid until 2024-01-01


-

-

-

-

-

Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2676
Effective 2024-01-03 through 2024-01-07

-

-




-

Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2676
Valid until 2024-01-02

-





-

-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2676
07:20

10:45
Effective 2024-03-09 through 2024-04-06

-

-

-

-

-


-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Operates only on 2024-01-06

-

-

-

-

-


-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Effective 2024-01-13 through 2024-03-02

-

-

-

-

-


-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Effective 2024-04-14 through 2024-05-19

-

-

-

-

-

-

Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Operates only on 2024-06-02

-

-

-

-

-

-

Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Operates only on 2024-05-26

-

-

-

-

-

-

Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Effective 2024-06-06 through 2024-07-01


-

-



-

-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2676
Effective 2024-06-09 through 2024-08-04

-

-

-

-

-

-

Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Effective 2024-07-08 through 2024-08-02


-

-



-

-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2676
Effective 2024-01-13 through 2024-03-02

-

-

-

-

-


-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Effective 2024-06-04 through 2024-07-31

-



-

-

-

-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Operates only on 2024-07-04

-

-

-


-

-

-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2676
Effective 2024-04-09 through 2024-05-29

-



-

-

-

-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Effective 2024-04-11 through 2024-06-03


-

-



-

-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2676
Effective 2024-04-13 through 2024-06-01

-

-

-

-

-


-
Duration: 1:30, non-stop
Boeing 737-800 (738)

Southwest Airlines WN2676
Effective 2024-01-13 through 2024-03-02

-

-

-

-

-


-
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Effective 2024-01-14 through 2024-03-03

-

-

-

-

-

-

Duration: 3:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Operates only on 2024-09-01

-

-

-

-

-

-

Duration: 2:50, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2676
Effective 2024-08-11 through 2024-08-25

-

-

-

-

-

-

Duration: 2:50, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2676
Effective 2024-09-08 through 2024-09-29

-

-

-

-

-

-

Duration: 2:50, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2676
Effective 2024-08-06 through 2024-10-02

-



-

-

-

-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Effective 2024-08-05 through 2024-09-30


-

-



-

-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2676
20:00

23:25
Effective 2024-03-10 through 2024-04-07

-

-

-

-

-

-

Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
21:10

00:30(+1)
Effective 2024-03-12 through 2024-04-03

-



-

-

-

-
Duration: 2:20, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN2676
21:30

00:50(+1)
Effective 2024-03-07 through 2024-04-08


-

-



-

-
Duration: 2:20, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

乗継便:

Southwest Airlines WN2676
Operates only on 2024-01-06

-

-

-

-

-


-
Duration: 5:00, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Effective 2024-01-13 through 2024-03-02

-

-

-

-

-


-
Duration: 4:45, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Effective 2024-01-13 through 2024-03-02

-

-

-

-

-


-
Duration: 6:25, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2676
Effective 2024-01-13 through 2024-03-02

-

-

-

-

-


-
Duration: 8:40, 2-stop
Boeing 737 MAX 8 (7M8)
This flight number is listed as serving the following routes:
  • Edward L. Logan, Boston (BOS) - Baltimore (BWI)
  • HARRY REID INTL AIRPORT, Las Vegas (LAS) - Austin (AUS)
  • Louisville (SDF) - HARRY REID INTL AIRPORT, Las Vegas (LAS)
  • Louisville (SDF) - Love Field, Dallas (DAL)
  • Louisville (SDF) - Midway, Chicago (MDW)
  • Love Field, Dallas (DAL) - HARRY REID INTL AIRPORT, Las Vegas (LAS)
  • Midway, Chicago (MDW) - HARRY REID INTL AIRPORT, Las Vegas (LAS)
  • Midway, Chicago (MDW) - Love Field, Dallas (DAL)
  • Midway, Chicago (MDW) - Pittsburgh (PIT)
  • Nashville (BNA) - Denver (DEN)
  • Oakland (OAK) - Denver (DEN)
  • Sacramento (SMF) - Austin (AUS)
  • Sacramento (SMF) - HARRY REID INTL AIRPORT, Las Vegas (LAS)
  • Sacramento (SMF) - Ontario, Los Angeles (ONT)