Qatar Airways フライト QR 7160: Multiple routes

搭乗日を選択
フライト時刻表
直行-コードシェア便:
月-土 00:40 Darwin (DRW) 06:25 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 4:15 Valid until 2026-01-13
Codeshare flight, operated by Virgin Australia.(VA 1456)
月,火,木,土 00:40 Darwin (DRW) 06:25 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 4:15 Effective 2026-01-15 through 2026-01-31
Codeshare flight, operated by Virgin Australia.(VA 1456)
土 00:40 Darwin (DRW) 06:25 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 4:15 Operates only on 2026-03-28
Codeshare flight, operated by Virgin Australia.(VA 1456)
月-土 00:40 Darwin (DRW) 06:20 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 4:10 Effective 2026-03-30 through 2026-04-04
Codeshare flight, operated by Virgin Australia.(VA 1456)
月-土 00:40 Darwin (DRW) 05:20 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 4:10 Effective 2026-04-06 through 2026-07-27
Codeshare flight, operated by Virgin Australia.(VA 1456)
月,金,土 00:40 Darwin (DRW) 05:20 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 4:10 Effective 2026-07-31 through 2026-08-24
Codeshare flight, operated by Virgin Australia.(VA 1456)
月,火,木,土 00:40 Darwin (DRW) 06:25 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737 MAX 8 (7M8) 4:15 Effective from 2026-10-26
Codeshare flight, operated by Virgin Australia.(VA 1456)
金 06:05 Gold Coast (OOL) 1 09:25 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 2:20 Effective 2026-01-30 through 2026-02-06
Codeshare flight, operated by Virgin Australia.(VA 726)
火,水 06:05 Brisbane (BNE) D 08:30 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-08-04 through 2026-09-23
Codeshare flight, operated by Virgin Australia.(VA 306)
水 06:05 Brisbane (BNE) D 08:30 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 2:25 Operates only on 2026-09-30
Codeshare flight, operated by Virgin Australia.(VA 306)
金 08:10 Canberra (CBR) 09:25 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 1:15 Operates only on 2026-10-16
Codeshare flight, operated by Virgin Australia.(VA 256)
水,木 08:20 Gold Coast (OOL) 1 11:45 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-10-07 through 2026-10-08
Codeshare flight, operated by Virgin Australia.(VA 728)
木 08:20 Gold Coast (OOL) 1 11:45 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 2:25 Operates only on 2026-10-15
Codeshare flight, operated by Virgin Australia.(VA 728)
金 09:05 Gold Coast (OOL) 1 11:30 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-09-18 through 2026-09-25
Codeshare flight, operated by Virgin Australia.(VA 730)
金 09:30 Sunshine Coast (MCY) 12:05 Sydney (SYD) 2
QR 7160 Non-stop Boeing 737-800 (73H) 1:35 Operates only on 2026-01-23
Codeshare flight, operated by Virgin Australia.(VA 484)
日 09:30 Sydney (SYD) 2 11:05 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-700 (73W) 1:35 Operates only on 2026-02-08
Codeshare flight, operated by Virgin Australia.(VA 826)
金 09:30 Sunshine Coast (MCY) 12:05 Sydney (SYD) 2
QR 7160 Non-stop Boeing 737-800 (73H) 1:35 Effective 2026-03-06 through 2026-03-20
Codeshare flight, operated by Virgin Australia.(VA 484)
金 09:40 Sunshine Coast (MCY) 12:15 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 2:35 Operates only on 2026-10-02
Codeshare flight, operated by Virgin Australia.(VA 1030)
金,日 10:20 Gold Coast (OOL) 1 12:50 Sydney (SYD) 2
QR 7160 Non-stop Boeing 737-800 (73H) 1:30 Effective from 2026-10-30
Codeshare flight, operated by Virgin Australia.(VA 516)
日 10:50 Rockhampton (ROK) 12:05 Brisbane (BNE) D
QR 7160 Non-stop Fokker 70 (F70) 1:15 Effective 2026-03-08 through 2026-03-22
Codeshare flight, operated by Virgin Australia.(VA 1238)
日 11:00 Rockhampton (ROK) 12:10 Brisbane (BNE) D
QR 7160 Non-stop Fokker 100 (100) 1:10 Operates only on 2026-03-29
Codeshare flight, operated by Virgin Australia.(VA 1238)
日 11:00 Rockhampton (ROK) 12:10 Brisbane (BNE) D
QR 7160 Non-stop Fokker 100 (100) 1:10 Effective 2026-04-12 through 2026-10-18
Codeshare flight, operated by Virgin Australia.(VA 1238)
月 12:45 Darwin (DRW) 17:40 Sydney (SYD) 2
QR 7160 Non-stop Boeing 737 MAX 8 (7M8) 4:25 Operates only on 2026-09-28
Codeshare flight, operated by Virgin Australia.(VA 1350)
金 13:00 Darwin (DRW) 18:40 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 4:10 Operates only on 2026-10-09
Codeshare flight, operated by Virgin Australia.(VA 1460)
金 13:00 Darwin (DRW) 18:40 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 4:10 Operates only on 2026-10-23
Codeshare flight, operated by Virgin Australia.(VA 1460)
金 13:25 Melbourne Tullamarine (MEL) 3 14:45 Hobart (HBA) D
QR 7160 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2026-09-04
Codeshare flight, operated by Virgin Australia.(VA 1324)
火,水 13:30 Sydney (SYD) 2 15:20 Launceston (LST)
QR 7160 Non-stop Boeing 737-800 (73H) 1:50 Effective 2026-07-28 through 2026-07-29
Codeshare flight, operated by Virgin Australia.(VA 1090)
日 14:50 Rockhampton (ROK) 16:00 Brisbane (BNE) D
QR 7160 Non-stop Fokker 70 (F70) 1:10 Operates only on 2026-10-25
Codeshare flight, operated by Virgin Australia.(VA 1242)
月 15:10 Brisbane (BNE) D 18:00 Canberra (CBR)
QR 7160 Non-stop Boeing 737-800 (73H) 1:50 Effective 2026-02-23 through 2026-03-02
Codeshare flight, operated by Virgin Australia.(VA 1220)
金 15:30 Sunshine Coast (MCY) 19:05 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 2:35 Operates only on 2026-03-27
Codeshare flight, operated by Virgin Australia.(VA 1042)
金 15:30 Queenstown (ZQN) 17:25 Brisbane (BNE) I
QR 7160 Non-stop Boeing 737 MAX 8 (7M8) 3:55 Operates only on 2026-08-28
Codeshare flight, operated by Virgin Australia.(VA 116)
金 16:20 Sunshine Coast (MCY) 18:55 Sydney (SYD) 2
QR 7160 Non-stop Boeing 737-800 (73H) 1:35 Operates only on 2026-01-16
Codeshare flight, operated by Virgin Australia.(VA 494)
金 16:20 Sunshine Coast (MCY) 18:55 Sydney (SYD) 2
QR 7160 Non-stop Boeing 737-800 (73H) 1:35 Operates only on 2026-02-27
Codeshare flight, operated by Virgin Australia.(VA 494)
火,土 16:25 Darwin (DRW) 22:10 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 4:15 Effective 2026-02-03 through 2026-02-10
Codeshare flight, operated by Virgin Australia.(VA 1462)
火,木,土 16:25 Darwin (DRW) 22:10 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 4:15 Effective 2026-02-12 through 2026-02-21
Codeshare flight, operated by Virgin Australia.(VA 1462)
金 16:55 Perth (PER) 1 23:30 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 3:35 Operates only on 2026-02-13
Codeshare flight, operated by Virgin Australia.(VA 700)
水 17:15 Townsville (TSV) 19:10 Brisbane (BNE) D
QR 7160 Non-stop Boeing 737-800 (73H) 1:55 Effective 2026-01-14 through 2026-01-21
Codeshare flight, operated by Virgin Australia.(VA 394)
水,日 17:15 Townsville (TSV) 19:10 Brisbane (BNE) D
QR 7160 Non-stop Boeing 737-800 (73H) 1:55 Effective 2026-03-01 through 2026-03-04
Codeshare flight, operated by Virgin Australia.(VA 394)
水 17:15 Townsville (TSV) 19:10 Brisbane (BNE) D
QR 7160 Non-stop Boeing 737-800 (73H) 1:55 Effective 2026-03-11 through 2026-03-25
Codeshare flight, operated by Virgin Australia.(VA 394)
日 17:25 Newman (ZNE) 19:10 Perth (PER) 1
QR 7160 Non-stop Airbus A320 (320) 1:45 Operates only on 2026-02-15
Codeshare flight, operated by Virgin Australia.(VA 1892)
水 17:25 Gold Coast (OOL) 1 20:50 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 2:25 Effective 2026-10-14 through 2026-10-21
Codeshare flight, operated by Virgin Australia.(VA 746)
火 18:05 Gold Coast (OOL) 1 20:30 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 2:25 Operates only on 2026-09-29
Codeshare flight, operated by Virgin Australia.(VA 748)
月 19:30 Sydney (SYD) 2 21:05 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 1:35 Effective 2026-10-05 through 2026-10-19
Codeshare flight, operated by Virgin Australia.(VA 886)
金 19:50 Melbourne Tullamarine (MEL) 3 21:10 Hobart (HBA) D
QR 7160 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2026-02-20
Codeshare flight, operated by Virgin Australia.(VA 1330)
月 20:55 Adelaide (ADL) 1 22:45 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2026-09-21
Codeshare flight, operated by Virgin Australia.(VA 246)
金 22:45 Perth (PER) 1 04:20 Melbourne Tullamarine (MEL) 3
QR 7160 Non-stop Boeing 737-800 (73H) 3:35 Operates only on 2026-09-11
Codeshare flight, operated by Virgin Australia.(VA 708)
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
Qatar Airways フライト QR 7160: Multiple routes
搭乗日を選択
フライト時刻表
直行-コードシェア便:

Qatar Airways QR7160
Valid until 2026-01-13







-
Codeshare flight, operated by Virgin Australia. (VA 1456)
Duration: 4:15, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-01-15 through 2026-01-31



-


-


-
Codeshare flight, operated by Virgin Australia. (VA 1456)
Duration: 4:15, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-03-28

-

-

-

-

-


-
Codeshare flight, operated by Virgin Australia. (VA 1456)
Duration: 4:15, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-03-30 through 2026-04-04







-
Codeshare flight, operated by Virgin Australia. (VA 1456)
Duration: 4:10, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-04-06 through 2026-07-27







-
Codeshare flight, operated by Virgin Australia. (VA 1456)
Duration: 4:10, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-07-31 through 2026-08-24


-

-

-



-
Codeshare flight, operated by Virgin Australia. (VA 1456)
Duration: 4:10, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Effective from 2026-10-26



-


-


-
Codeshare flight, operated by Virgin Australia. (VA 1456)
Duration: 4:15, non-stop
Boeing 737 MAX 8 (7M8)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-01-30 through 2026-02-06

-

-

-

-


-

-
Codeshare flight, operated by Virgin Australia. (VA 726)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-08-04 through 2026-09-23

-



-

-

-

-
Codeshare flight, operated by Virgin Australia. (VA 306)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-09-30

-

-


-

-

-

-
Codeshare flight, operated by Virgin Australia. (VA 306)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-10-16

-

-

-

-


-

-
Codeshare flight, operated by Virgin Australia. (VA 256)
Duration: 1:15, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-10-07 through 2026-10-08

-

-



-

-

-
Codeshare flight, operated by Virgin Australia. (VA 728)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-10-15

-

-

-


-

-

-
Codeshare flight, operated by Virgin Australia. (VA 728)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-09-18 through 2026-09-25

-

-

-

-


-

-
Codeshare flight, operated by Virgin Australia. (VA 730)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-01-23

-

-

-

-


-

-
Codeshare flight, operated by Virgin Australia. (VA 484)
Duration: 1:35, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-02-08

-

-

-

-

-

-

Codeshare flight, operated by Virgin Australia. (VA 826)
Duration: 1:35, non-stop
Boeing 737-700 (73W)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-03-06 through 2026-03-20

-

-

-

-


-

-
Codeshare flight, operated by Virgin Australia. (VA 484)
Duration: 1:35, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-10-02

-

-

-

-


-

-
Codeshare flight, operated by Virgin Australia. (VA 1030)
Duration: 2:35, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
10:20

12:50
Effective from 2026-10-30

-

-

-

-


-

Codeshare flight, operated by Virgin Australia. (VA 516)
Duration: 1:30, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-03-08 through 2026-03-22

-

-

-

-

-

-

Codeshare flight, operated by Virgin Australia. (VA 1238)
Duration: 1:15, non-stop
Fokker 70 (F70)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-03-29

-

-

-

-

-

-

Codeshare flight, operated by Virgin Australia. (VA 1238)
Duration: 1:10, non-stop
Fokker 100 (100)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-04-12 through 2026-10-18

-

-

-

-

-

-

Codeshare flight, operated by Virgin Australia. (VA 1238)
Duration: 1:10, non-stop
Fokker 100 (100)

直行-コードシェア便:

Qatar Airways QR7160
12:45

17:40
Operates only on 2026-09-28


-

-

-

-

-

-
Codeshare flight, operated by Virgin Australia. (VA 1350)
Duration: 4:25, non-stop
Boeing 737 MAX 8 (7M8)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-10-09

-

-

-

-


-

-
Codeshare flight, operated by Virgin Australia. (VA 1460)
Duration: 4:10, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-10-23

-

-

-

-


-

-
Codeshare flight, operated by Virgin Australia. (VA 1460)
Duration: 4:10, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-09-04

-

-

-

-


-

-
Codeshare flight, operated by Virgin Australia. (VA 1324)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-07-28 through 2026-07-29

-



-

-

-

-
Codeshare flight, operated by Virgin Australia. (VA 1090)
Duration: 1:50, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-10-25

-

-

-

-

-

-

Codeshare flight, operated by Virgin Australia. (VA 1242)
Duration: 1:10, non-stop
Fokker 70 (F70)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-02-23 through 2026-03-02


-

-

-

-

-

-
Codeshare flight, operated by Virgin Australia. (VA 1220)
Duration: 1:50, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-03-27

-

-

-

-


-

-
Codeshare flight, operated by Virgin Australia. (VA 1042)
Duration: 2:35, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-08-28

-

-

-

-


-

-
Codeshare flight, operated by Virgin Australia. (VA 116)
Duration: 3:55, non-stop
Boeing 737 MAX 8 (7M8)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-01-16

-

-

-

-


-

-
Codeshare flight, operated by Virgin Australia. (VA 494)
Duration: 1:35, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-02-27

-

-

-

-


-

-
Codeshare flight, operated by Virgin Australia. (VA 494)
Duration: 1:35, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-02-03 through 2026-02-10

-


-

-

-


-
Codeshare flight, operated by Virgin Australia. (VA 1462)
Duration: 4:15, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-02-12 through 2026-02-21

-


-


-


-
Codeshare flight, operated by Virgin Australia. (VA 1462)
Duration: 4:15, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-02-13

-

-

-

-


-

-
Codeshare flight, operated by Virgin Australia. (VA 700)
Duration: 3:35, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-01-14 through 2026-01-21

-

-


-

-

-

-
Codeshare flight, operated by Virgin Australia. (VA 394)
Duration: 1:55, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-03-01 through 2026-03-04

-

-


-

-

-

Codeshare flight, operated by Virgin Australia. (VA 394)
Duration: 1:55, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-03-11 through 2026-03-25

-

-


-

-

-

-
Codeshare flight, operated by Virgin Australia. (VA 394)
Duration: 1:55, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
17:25

19:10
Operates only on 2026-02-15

-

-

-

-

-

-

Codeshare flight, operated by Virgin Australia. (VA 1892)
Duration: 1:45, non-stop
Airbus A320 (320)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-10-14 through 2026-10-21

-

-


-

-

-

-
Codeshare flight, operated by Virgin Australia. (VA 746)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-09-29

-


-

-

-

-

-
Codeshare flight, operated by Virgin Australia. (VA 748)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Effective 2026-10-05 through 2026-10-19


-

-

-

-

-

-
Codeshare flight, operated by Virgin Australia. (VA 886)
Duration: 1:35, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-02-20

-

-

-

-


-

-
Codeshare flight, operated by Virgin Australia. (VA 1330)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-09-21


-

-

-

-

-

-
Codeshare flight, operated by Virgin Australia. (VA 246)
Duration: 1:20, non-stop
Boeing 737-800 (73H)

直行-コードシェア便:

Qatar Airways QR7160
Operates only on 2026-09-11

-

-

-

-


-

-
Codeshare flight, operated by Virgin Australia. (VA 708)
Duration: 3:35, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
  • Adelaide (ADL) - Melbourne Tullamarine (MEL)
  • Brisbane (BNE) - Canberra (CBR)
  • Brisbane (BNE) - Melbourne Tullamarine (MEL)
  • Canberra (CBR) - Melbourne Tullamarine (MEL)
  • Darwin (DRW) - Melbourne Tullamarine (MEL)
  • Darwin (DRW) - Sydney (SYD)
  • Gold Coast (OOL) - Melbourne Tullamarine (MEL)
  • Gold Coast (OOL) - Sydney (SYD)
  • Melbourne Tullamarine (MEL) - Hobart (HBA)
  • Newman (ZNE) - Perth (PER)
  • Perth (PER) - Melbourne Tullamarine (MEL)
  • Queenstown (ZQN) - Brisbane (BNE)
  • Rockhampton (ROK) - Brisbane (BNE)
  • Sunshine Coast (MCY) - Melbourne Tullamarine (MEL)
  • Sunshine Coast (MCY) - Sydney (SYD)
  • Sydney (SYD) - Launceston (LST)
  • Sydney (SYD) - Melbourne Tullamarine (MEL)
  • Townsville (TSV) - Brisbane (BNE)