| フライト時刻表 |
|---|
| 直行-コードシェア便: |
| 月,水,金-日
21:25
Kuala Lumpur (KUL) 1
00:30
Muscat (MCT) GA 9430 Non-stop Boeing 737 MAX 8 (7M8) 7:05 Valid until 2026-01-19 Codeshare flight, operated by Oman Air.(WY 824) The flight arrives 1 day after departure. |
| 木
21:25
Kuala Lumpur (KUL) 1
00:30
Muscat (MCT) GA 9430 Non-stop Boeing 787-9 (789) 7:05 Valid until 2026-01-22 Codeshare flight, operated by Oman Air.(WY 824) The flight arrives 1 day after departure. |
| 月,金,日
21:25
Kuala Lumpur (KUL) 1
00:30
Muscat (MCT) GA 9430 Non-stop Boeing 737 MAX 8 (7M8) 7:05 Effective 2026-01-23 through 2026-02-06 Codeshare flight, operated by Oman Air.(WY 824) The flight arrives 1 day after departure. |
| 木,土
21:25
Kuala Lumpur (KUL) 1
00:30
Muscat (MCT) GA 9430 Non-stop Boeing 787-9 (789) 7:05 Effective 2026-01-24 through 2026-02-05 Codeshare flight, operated by Oman Air.(WY 824) The flight arrives 1 day after departure. |
| 月,金-日
21:25
Kuala Lumpur (KUL) 1
00:30
Muscat (MCT) GA 9430 Non-stop Boeing 737 MAX 8 (7M8) 7:05 Effective 2026-02-07 through 2026-02-16 Codeshare flight, operated by Oman Air.(WY 824) The flight arrives 1 day after departure. |
| 木
21:25
Kuala Lumpur (KUL) 1
00:30
Muscat (MCT) GA 9430 Non-stop Boeing 787-9 (789) 7:05 Operates only on 2026-02-12 Codeshare flight, operated by Oman Air.(WY 824) The flight arrives 1 day after departure. |
| 月,木,金,日
21:25
Kuala Lumpur (KUL) 1
00:30
Muscat (MCT) GA 9430 Non-stop Boeing 737 MAX 8 (7M8) 7:05 Effective 2026-02-19 through 2026-02-23 Codeshare flight, operated by Oman Air.(WY 824) The flight arrives 1 day after departure. |
| 木,土
21:25
Kuala Lumpur (KUL) 1
00:30
Muscat (MCT) GA 9430 Non-stop Boeing 787-9 (789) 7:05 Effective 2026-02-21 through 2026-02-26 Codeshare flight, operated by Oman Air.(WY 824) The flight arrives 1 day after departure. |
| 月,木-日
21:25
Kuala Lumpur (KUL) 1
00:30
Muscat (MCT) GA 9430 Non-stop Boeing 737 MAX 8 (7M8) 7:05 Effective 2026-02-27 through 2026-03-15 Codeshare flight, operated by Oman Air.(WY 824) The flight arrives 1 day after departure. |
| 月,木
21:25
Kuala Lumpur (KUL) 1
00:30
Muscat (MCT) GA 9430 Non-stop Boeing 787-9 (789) 7:05 Effective 2026-03-16 through 2026-03-19 Codeshare flight, operated by Oman Air.(WY 824) The flight arrives 1 day after departure. |
| 月,金-日
21:25
Kuala Lumpur (KUL) 1
00:30
Muscat (MCT) GA 9430 Non-stop Boeing 737 MAX 8 (7M8) 7:05 Effective 2026-03-20 through 2026-03-28 Codeshare flight, operated by Oman Air.(WY 824) The flight arrives 1 day after departure. |
| 木
21:25
Kuala Lumpur (KUL) 1
00:30
Muscat (MCT) GA 9430 Non-stop Boeing 787-9 (789) 7:05 Operates only on 2026-03-26 Codeshare flight, operated by Oman Air.(WY 824) The flight arrives 1 day after departure. |