| フライト時刻表 |
|---|
| 直行-コードシェア便: |
| 月,金,土
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A350-900 (359) 2:25 Valid until 2026-01-03 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 水
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:25 Valid until 2026-01-07 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 木
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A330-300 (333) 2:25 Operates only on 2026-01-01 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 土,日
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 777-300ER (77W) 2:25 Effective 2026-01-04 through 2026-01-11 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月,火,木
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A350-1000 (351) 2:25 Effective 2026-01-05 through 2026-01-08 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月,火,金
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A350-900 (359) 2:25 Effective 2026-01-09 through 2026-01-16 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月,水,日
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 777-300ER (77W) 2:25 Effective 2026-01-14 through 2026-01-21 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 木
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:25 Effective 2026-01-15 through 2026-01-22 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 金,土
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A350-1000 (351) 2:25 Effective 2026-01-17 through 2026-01-23 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 火,日
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A350-900 (359) 2:25 Effective 2026-01-20 through 2026-01-25 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 金,土
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 777-300ER (77W) 2:25 Effective 2026-01-24 through 2026-01-31 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:25 Operates only on 2026-01-26 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月,火
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 787-9 (789) 2:25 Effective 2026-01-27 through 2026-02-02 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 水,日
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A350-900 (359) 2:25 Effective 2026-01-28 through 2026-02-04 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 火,木
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A350-1000 (351) 2:25 Effective 2026-01-29 through 2026-02-03 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 木
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:25 Operates only on 2026-02-05 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 木,金
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A350-1000 (351) 2:25 Effective 2026-02-06 through 2026-02-12 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 火,金-日
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A350-900 (359) 2:25 Effective 2026-02-07 through 2026-02-13 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 787-9 (789) 2:25 Operates only on 2026-02-09 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月,水
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 777-300ER (77W) 2:25 Effective 2026-02-11 through 2026-02-16 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 土
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A350-1000 (351) 2:25 Operates only on 2026-02-14 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 火,水,日
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A350-900 (359) 2:25 Effective 2026-02-15 through 2026-02-22 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 木
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A330-300 (333) 2:25 Operates only on 2026-02-19 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 火,木,土
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:25 Effective 2026-02-21 through 2026-03-03 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 水
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 777-300ER (77W) 2:25 Operates only on 2026-02-25 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 日
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A350-1000 (351) 2:25 Operates only on 2026-03-01 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 火-木,土
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:25 Effective 2026-03-04 through 2026-03-10 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 日
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 777-300ER (77W) 2:25 Operates only on 2026-03-08 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 水
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 787-9 (789) 2:25 Operates only on 2026-03-11 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 木
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:25 Operates only on 2026-03-12 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 土
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A330-300 (333) 2:25 Operates only on 2026-03-14 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 火-日
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A320 (320) 2:25 Effective 2026-03-15 through 2026-03-22 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月-土
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Airbus A320 (320) 2:25 Effective 2026-03-23 through 2026-03-28 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 火-木,土,日
02:30
Doha (DOH)
06:55
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:25 Effective from 2026-10-25 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 日
02:40
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-9 (789) 2:35 Operates only on 2026-06-14 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 日々
02:40
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:35 Effective 2026-06-15 through 2026-07-05 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月
02:40
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-9 (789) 2:35 Operates only on 2026-07-06 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 日々
02:40
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:35 Effective 2026-07-07 through 2026-07-24 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 水,土
02:40
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-9 (789) 2:35 Effective 2026-07-25 through 2026-07-29 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月,火,木-日
02:40
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:35 Effective 2026-07-26 through 2026-08-04 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 火-木,土,日
02:40
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:35 Effective 2026-08-05 through 2026-08-16 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月,金
02:40
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-9 (789) 2:35 Effective 2026-08-07 through 2026-08-14 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月-土
02:40
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:35 Effective 2026-08-17 through 2026-08-22 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月,土,日
02:40
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-9 (789) 2:35 Effective 2026-08-23 through 2026-08-30 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月-金
02:40
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:35 Effective 2026-08-25 through 2026-09-03 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 金
02:40
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-9 (789) 2:35 Operates only on 2026-09-04 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 日々
02:40
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:35 Effective 2026-09-05 through 2026-09-13 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月
02:40
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-9 (789) 2:35 Operates only on 2026-09-14 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 火-日
02:40
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:35 Effective 2026-09-15 through 2026-09-24 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 火-木,土,日
02:40
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:35 Effective 2026-09-26 through 2026-10-24 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月,水-日
02:50
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:25 Effective 2026-03-29 through 2026-04-06 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 火
02:50
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Airbus A330-300 (333) 2:25 Operates only on 2026-03-31 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 火-木,土,日
02:50
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:25 Effective 2026-04-07 through 2026-04-12 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 金
02:50
Doha (DOH)
07:15
Karachi (KHI) M BA 6180 Non-stop Airbus A350-900 (359) 2:25 Operates only on 2026-04-10 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月-金,日
03:15
Doha (DOH)
07:50
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:35 Effective 2026-05-01 through 2026-05-08 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 土
03:15
Doha (DOH)
07:50
Karachi (KHI) M BA 6180 Non-stop Boeing 787-9 (789) 2:35 Effective 2026-05-02 through 2026-05-09 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 日
03:15
Doha (DOH)
07:50
Karachi (KHI) M BA 6180 Non-stop Airbus A330-300 (333) 2:35 Operates only on 2026-05-10 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 日々
03:15
Doha (DOH)
07:50
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:35 Effective 2026-05-11 through 2026-05-21 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 火,金
03:15
Doha (DOH)
07:50
Karachi (KHI) M BA 6180 Non-stop Boeing 787-9 (789) 2:35 Effective 2026-05-22 through 2026-05-26 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月,水-日
03:15
Doha (DOH)
07:50
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:35 Effective 2026-05-23 through 2026-06-01 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 日々
03:15
Doha (DOH)
07:50
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:35 Effective 2026-06-02 through 2026-06-13 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月-水,金
03:25
Doha (DOH)
07:50
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:25 Effective 2026-04-13 through 2026-04-22 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 木,土,日
03:25
Doha (DOH)
07:50
Karachi (KHI) M BA 6180 Non-stop Boeing 787-9 (789) 2:25 Effective 2026-04-16 through 2026-04-19 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 月-金,日
03:25
Doha (DOH)
07:50
Karachi (KHI) M BA 6180 Non-stop Boeing 787-8 (788) 2:25 Effective 2026-04-23 through 2026-04-30 Codeshare flight, operated by Qatar Airways.(QR 610) |
| 土
03:25
Doha (DOH)
07:50
Karachi (KHI) M BA 6180 Non-stop Boeing 787-9 (789) 2:25 Operates only on 2026-04-25 Codeshare flight, operated by Qatar Airways.(QR 610) |