Toutes les compagnies reliant Vancouver (YVR) à Shanghai Pudong (PVG).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Tous les jours 10:50 Vancouver (YVR) M 14:05 Shanghai Pudong (PVG) 2
Air Canada AC 25 Non-stop Boeing 787-9 (789) 12:15 Effective 2026-03-28 through 2026-06-17
The flight arrives 1 day after departure.
Tous les jours 10:50 Vancouver (YVR) M 14:05 Shanghai Pudong (PVG) 2
Air Canada AC 25 Non-stop Boeing 787-9 (789) 12:15 Effective 2026-09-08 through 2026-10-23
The flight arrives 1 day after departure.
Tous les jours 11:15 Vancouver (YVR) M 16:00 Shanghai Pudong (PVG) 2
Air Canada AC 25 Non-stop Boeing 787-9 (789) 12:45 Valid until 2026-01-19
The flight arrives 1 day after departure.
Lun,Mer-Sam 11:15 Vancouver (YVR) M 16:00 Shanghai Pudong (PVG) 2
Air Canada AC 25 Non-stop Boeing 787-9 (789) 12:45 Effective 2026-01-21 through 2026-01-31
The flight arrives 1 day after departure.
Mar-Dim 11:15 Vancouver (YVR) M 16:00 Shanghai Pudong (PVG) 2
Air Canada AC 25 Non-stop Boeing 787-9 (789) 12:45 Effective 2026-02-01 through 2026-02-08
The flight arrives 1 day after departure.
Tous les jours 11:15 Vancouver (YVR) M 16:00 Shanghai Pudong (PVG) 2
Air Canada AC 25 Non-stop Boeing 787-9 (789) 12:45 Effective 2026-02-09 through 2026-02-15
The flight arrives 1 day after departure.
Tous les jours 11:15 Vancouver (YVR) M 16:00 Shanghai Pudong (PVG) 2
Air Canada AC 25 Non-stop Boeing 787-9 (789) 12:45 Effective 2026-02-17 through 2026-02-28
The flight arrives 1 day after departure.
Tous les jours 11:15 Vancouver (YVR) M 14:05 Shanghai Pudong (PVG) 2
Air Canada AC 25 Non-stop Boeing 787-9 (789) 11:50 Effective 2026-06-18 through 2026-09-07
The flight arrives 1 day after departure.
Tous les jours 11:30 Vancouver (YVR) M 16:00 Shanghai Pudong (PVG) 2
Air Canada AC 25 Non-stop Boeing 787-9 (789) 12:30 Effective 2026-03-01 through 2026-03-07
The flight arrives 1 day after departure.
Tous les jours 12:15 Vancouver (YVR) M 16:00 Shanghai Pudong (PVG) 2
Air Canada AC 25 Non-stop Boeing 787-9 (789) 12:45 Effective from 2026-10-24
The flight arrives 1 day after departure.
Tous les jours 12:30 Vancouver (YVR) M 16:00 Shanghai Pudong (PVG) 2
Air Canada AC 25 Non-stop Boeing 787-9 (789) 12:30 Effective 2026-03-08 through 2026-03-27
The flight arrives 1 day after departure.
Lun,Jeu 11:50 Vancouver (YVR) M 16:40 Shanghai Pudong (PVG) 1
China Eastern MU 582 Non-stop Airbus A350-900 (359) 12:50 Valid until 2026-03-05
The flight arrives 1 day after departure.
Lun,Jeu 12:50 Vancouver (YVR) M 16:40 Shanghai Pudong (PVG) 1
China Eastern MU 582 Non-stop Airbus A350-900 (359) 12:50 Effective 2026-03-09 through 2026-03-26
The flight arrives 1 day after departure.
Lun,Jeu 12:50 Vancouver (YVR) M 16:15 Shanghai Pudong (PVG) 1
China Eastern MU 582 Non-stop Airbus A350-900 (359) 12:25 Effective 2026-03-30 through 2026-10-22
The flight arrives 1 day after departure.
Lun,Jeu 12:50 Vancouver (YVR) M 16:40 Shanghai Pudong (PVG) 1
China Eastern MU 582 Non-stop Airbus A350-900 (359) 12:50 Effective 2026-10-26 through 2026-10-29
The flight arrives 1 day after departure.
Vols directs en partage de code:
Tous les jours 10:50 Vancouver (YVR) M 14:05 Shanghai Pudong (PVG) 2
Air China CA 7456 Non-stop Boeing 787-9 (789) 12:15 Effective 2026-03-28 through 2026-06-17
Codeshare flight, operated by Air Canada.(AC 25)
The flight arrives 1 day after departure.
Tous les jours 10:50 Vancouver (YVR) M 14:05 Shanghai Pudong (PVG) 2
Air China CA 7456 Non-stop Boeing 787-9 (789) 12:15 Effective 2026-09-08 through 2026-10-23
Codeshare flight, operated by Air Canada.(AC 25)
The flight arrives 1 day after departure.
Tous les jours 11:15 Vancouver (YVR) M 16:00 Shanghai Pudong (PVG) 2
Air China CA 7456 Non-stop Boeing 787-9 (789) 12:45 Valid until 2026-01-19
Codeshare flight, operated by Air Canada.(AC 25)
The flight arrives 1 day after departure.
Lun,Mer-Sam 11:15 Vancouver (YVR) M 16:00 Shanghai Pudong (PVG) 2
Air China CA 7456 Non-stop Boeing 787-9 (789) 12:45 Effective 2026-01-21 through 2026-01-31
Codeshare flight, operated by Air Canada.(AC 25)
The flight arrives 1 day after departure.
Mar-Dim 11:15 Vancouver (YVR) M 16:00 Shanghai Pudong (PVG) 2
Air China CA 7456 Non-stop Boeing 787-9 (789) 12:45 Effective 2026-02-01 through 2026-02-08
Codeshare flight, operated by Air Canada.(AC 25)
The flight arrives 1 day after departure.
Tous les jours 11:15 Vancouver (YVR) M 16:00 Shanghai Pudong (PVG) 2
Air China CA 7456 Non-stop Boeing 787-9 (789) 12:45 Effective 2026-02-09 through 2026-02-15
Codeshare flight, operated by Air Canada.(AC 25)
The flight arrives 1 day after departure.
Tous les jours 11:15 Vancouver (YVR) M 16:00 Shanghai Pudong (PVG) 2
Air China CA 7456 Non-stop Boeing 787-9 (789) 12:45 Effective 2026-02-17 through 2026-02-28
Codeshare flight, operated by Air Canada.(AC 25)
The flight arrives 1 day after departure.
Tous les jours 11:15 Vancouver (YVR) M 14:05 Shanghai Pudong (PVG) 2
Air China CA 7456 Non-stop Boeing 787-9 (789) 11:50 Effective 2026-06-18 through 2026-09-07
Codeshare flight, operated by Air Canada.(AC 25)
The flight arrives 1 day after departure.
Tous les jours 11:30 Vancouver (YVR) M 16:00 Shanghai Pudong (PVG) 2
Air China CA 7456 Non-stop Boeing 787-9 (789) 12:30 Effective 2026-03-01 through 2026-03-07
Codeshare flight, operated by Air Canada.(AC 25)
The flight arrives 1 day after departure.
Tous les jours 12:15 Vancouver (YVR) M 16:00 Shanghai Pudong (PVG) 2
Air China CA 7456 Non-stop Boeing 787-9 (789) 12:45 Effective from 2026-10-24
Codeshare flight, operated by Air Canada.(AC 25)
The flight arrives 1 day after departure.
Tous les jours 12:30 Vancouver (YVR) M 16:00 Shanghai Pudong (PVG) 2
Air China CA 7456 Non-stop Boeing 787-9 (789) 12:30 Effective 2026-03-08 through 2026-03-27
Codeshare flight, operated by Air Canada.(AC 25)
The flight arrives 1 day after departure.


Toutes les compagnies reliant Vancouver (YVR) à Shanghai Pudong (PVG).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Effective 2026-03-28 through 2026-06-17
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 12:15, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-09-08 through 2026-10-23
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 12:15, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs:

Valid until 2026-01-19
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 12:45, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-01-21 through 2026-01-31
Lun
Mar
-
Mer
Jeu
Ven
Sam
Dim
-
Duration: 12:45, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-02-01 through 2026-02-08
Lun
-
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 12:45, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-02-09 through 2026-02-15
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 12:45, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-02-17 through 2026-02-28
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 12:45, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-06-18 through 2026-09-07
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 11:50, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-03-01 through 2026-03-07
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 12:30, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs:

Effective from 2026-10-24
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 12:45, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-03-08 through 2026-03-27
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 12:30, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs:

Valid until 2026-03-05
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 12:50, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-03-09 through 2026-03-26
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 12:50, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-03-30 through 2026-10-22
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 12:25, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-10-26 through 2026-10-29
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 12:50, non-stop
Airbus A350-900 (359)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-03-28 through 2026-06-17
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Air Canada. (AC 25)
Duration: 12:15, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-09-08 through 2026-10-23
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Air Canada. (AC 25)
Duration: 12:15, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Valid until 2026-01-19
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Air Canada. (AC 25)
Duration: 12:45, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-01-21 through 2026-01-31
Lun
Mar
-
Mer
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Air Canada. (AC 25)
Duration: 12:45, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-02-01 through 2026-02-08
Lun
-
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Air Canada. (AC 25)
Duration: 12:45, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-02-09 through 2026-02-15
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Air Canada. (AC 25)
Duration: 12:45, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-02-17 through 2026-02-28
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Air Canada. (AC 25)
Duration: 12:45, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-06-18 through 2026-09-07
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Air Canada. (AC 25)
Duration: 11:50, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-03-01 through 2026-03-07
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Air Canada. (AC 25)
Duration: 12:30, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective from 2026-10-24
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Air Canada. (AC 25)
Duration: 12:45, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-03-08 through 2026-03-27
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Air Canada. (AC 25)
Duration: 12:30, non-stop
Boeing 787-9 (789)
The flight arrives 1 day after departure.
  • Il s'agit d'une ligne internationale au départ de l'aéroport de Vancouver, Canada (YVR) et à destination de l'aéroport de Shanghai Pudong, China (PVG).
  • La distance est de 9011 km.
  • Le fuseau horaire de l'aéroport de départ est UTC-8 , et le fuseau horaire de l'aéroport d'arrivée est UTC+8 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.
  • Pour les vols directs, le temps de vol varie entre 11:50 et 12:50.