| HORAIRES DES VOLS |
|---|
| Vols directs: |
| Lun,Dim
07:25
Tucson (TUS)
07:50
San Diego (SAN) 1 Southwest Airlines WN 4135 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-02-09 through 2026-02-15 |
| Lun,Mar,Jeu
07:25
Tucson (TUS)
07:50
San Diego (SAN) 1 Southwest Airlines WN 4135 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-02-17 through 2026-02-23 |
| Lun
07:25
Tucson (TUS)
07:50
San Diego (SAN) 1 Southwest Airlines WN 4135 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Operates only on 2026-03-02 |
| Sam
07:30
Tucson (TUS)
07:55
San Diego (SAN) 1 Southwest Airlines WN 4135 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-02-14 through 2026-02-28 |
| Sam
07:40
Tucson (TUS)
08:05
San Diego (SAN) 1 Southwest Airlines WN 4135 Non-stop Boeing 737-800 (73H) 1:25 Effective 2026-01-10 through 2026-02-07 |
| Lun-Ven
09:00
Tucson (TUS)
09:30
San Diego (SAN) 1 Southwest Airlines WN 4135 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-01-06 through 2026-01-14 |
| Mar-Ven,Dim
09:00
Tucson (TUS)
09:30
San Diego (SAN) 1 Southwest Airlines WN 4135 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-01-18 through 2026-01-23 |
| Lun-Ven
09:00
Tucson (TUS)
09:30
San Diego (SAN) 1 Southwest Airlines WN 4135 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-01-26 through 2026-02-04 |
| Mar,Mer,Dim
09:00
Tucson (TUS)
09:30
San Diego (SAN) 1 Southwest Airlines WN 4135 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-02-08 through 2026-02-11 |
| Mar,Mer
09:00
Tucson (TUS)
09:30
San Diego (SAN) 1 Southwest Airlines WN 4135 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2026-02-18 through 2026-03-04 |
| Dim
19:05
Tucson (TUS)
20:25
San Diego (SAN) 1 Southwest Airlines WN 4214 Non-stop Boeing 737-800 (73H) 1:20 Effective 2026-08-09 through 2026-09-27 |
| Lun
07:25
Tucson (TUS)
07:45
San Diego (SAN) 1 Southwest Airlines WN 4223 Non-stop Boeing 737-700 (Scimitar Winglets) 1:20 Operates only on 2026-01-05 |
| Ven,Dim
07:30
Tucson (TUS)
07:50
San Diego (SAN) 1 Southwest Airlines WN 4223 Non-stop Boeing 737-700 (Scimitar Winglets) 1:20 Effective 2026-01-02 through 2026-01-04 |
| Mer,Jeu
09:05
Tucson (TUS)
09:30
San Diego (SAN) 1 Southwest Airlines WN 4229 Non-stop Boeing 737-700 (73W) 1:25 Valid until 2026-01-01 |
| Lun
19:20
Tucson (TUS)
19:45
San Diego (SAN) 1 Southwest Airlines WN 4229 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Operates only on 2026-01-05 |
| Ven,Dim
20:05
Tucson (TUS)
20:30
San Diego (SAN) 1 Southwest Airlines WN 4229 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2026-01-02 through 2026-01-04 |
| Sam
16:25
Tucson (TUS)
17:50
San Diego (SAN) 1 Southwest Airlines WN 4281 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2026-04-11 through 2026-05-30 |
| Sam
12:45
Tucson (TUS)
13:10
San Diego (SAN) 1 Southwest Airlines WN 4508 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Operates only on 2026-01-03 |
| Mar
06:15
Tucson (TUS)
07:30
San Diego (SAN) 1 Southwest Airlines WN 5124 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2026-08-04 through 2026-09-29 |
| Vols indirects: |
| Dim
18:20
Tucson (TUS)
20:55
San Diego (SAN) 1 Southwest Airlines WN 278 1-stop Boeing 737-700 (Scimitar Winglets) 2:35 Effective 2026-06-07 through 2026-08-02 |
| Lun,Jeu,Ven
11:45
Tucson (TUS)
14:05
San Diego (SAN) 1 Southwest Airlines WN 2165 1-stop Boeing 737-700 (Scimitar Winglets) 3:20 Effective 2026-02-12 through 2026-02-16 |
| Jeu,Ven,Dim
11:45
Tucson (TUS)
14:05
San Diego (SAN) 1 Southwest Airlines WN 2165 1-stop Boeing 737-700 (Scimitar Winglets) 3:20 Effective 2026-02-20 through 2026-03-01 |
| Ven,Dim
19:05
Tucson (TUS)
21:20
San Diego (SAN) 1 Southwest Airlines WN 2174 1-stop Boeing 737-700 (Scimitar Winglets) 3:15 Effective 2026-01-02 through 2026-01-04 |
| Lun,Jeu,Ven
18:45
Tucson (TUS)
21:35
San Diego (SAN) 1 Southwest Airlines WN 2837 1-stop Boeing 737-700 (Scimitar Winglets) 2:50 Effective 2026-03-09 through 2026-04-06 |
| Jeu,Ven
19:45
Tucson (TUS)
21:35
San Diego (SAN) 1 Southwest Airlines WN 2837 1-stop Boeing 737-700 (Scimitar Winglets) 2:50 Effective 2026-03-05 through 2026-03-06 |
1
2