Toutes les compagnies reliant Sacramento (SMF) à Guadalajara (GDL).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Dim 00:21 Sacramento (SMF) B 06:13 Guadalajara (GDL) 1
Aeromexico AM 789 Non-stop Boeing 737 MAX 8 (7M8) 3:52 Operates only on 2026-03-08
Tous les jours 00:21 Sacramento (SMF) B 05:13 Guadalajara (GDL) 1
Aeromexico AM 789 Non-stop Boeing 737 MAX 8 (7M8) 3:52 Effective 2026-03-09 through 2026-03-28
Tous les jours 00:21 Sacramento (SMF) B 05:13 Guadalajara (GDL) 1
Aeromexico AM 789 Non-stop Boeing 737 MAX 8 (7M8) 3:52 Effective from 2026-10-26
Tous les jours 00:30 Sacramento (SMF) B 06:21 Guadalajara (GDL) 1
Aeromexico AM 789 Non-stop Boeing 737 MAX 8 (7M8) 3:51 Effective 2026-02-05 through 2026-03-07
Tous les jours 00:35 Sacramento (SMF) B 06:29 Guadalajara (GDL) 1
Aeromexico AM 789 Non-stop Boeing 737-800 (7S8) 3:54 Valid until 2026-01-11
Lun 00:35 Sacramento (SMF) B 06:27 Guadalajara (GDL) 1
Aeromexico AM 789 Non-stop Boeing 737 MAX 9 (7M9) 3:52 Operates only on 2026-01-12
Tous les jours 00:35 Sacramento (SMF) B 06:27 Guadalajara (GDL) 1
Aeromexico AM 789 Non-stop Boeing 737 MAX 8 (7M8) 3:52 Effective 2026-01-13 through 2026-02-04
Tous les jours 00:35 Sacramento (SMF) B 05:33 Guadalajara (GDL) 1
Aeromexico AM 789 Non-stop Boeing 737 MAX 8 (7M8) 3:58 Effective 2026-03-29 through 2026-10-25
Tous les jours 22:40 Sacramento (SMF) B 04:34 Guadalajara (GDL) 1
Aeromexico AM 1789 Non-stop Boeing 737-800 (7S8) 3:54 Valid until 2026-01-04
The flight arrives 1 day after departure.
Mer,Ven 23:05 Sacramento (SMF) 04:49 Guadalajara (GDL) 1
Volaris Y4 1811 Non-stop Airbus A321neo (32Q) 3:44 Effective 2026-01-02 through 2026-01-07
The flight arrives 1 day after departure.
Ven,Dim 23:05 Sacramento (SMF) 04:49 Guadalajara (GDL) 1
Volaris Y4 1811 Non-stop Airbus A321 (321) 3:44 Effective 2026-01-04 through 2026-01-11
The flight arrives 1 day after departure.
Lun 23:05 Sacramento (SMF) 04:49 Guadalajara (GDL) 1
Volaris Y4 1811 Non-stop Airbus A320 (320) 3:44 Operates only on 2026-01-05
The flight arrives 1 day after departure.
Mar 23:05 Sacramento (SMF) 04:49 Guadalajara (GDL) 1
Volaris Y4 1811 Non-stop Airbus A320neo (32N) 3:44 Operates only on 2026-01-06
The flight arrives 1 day after departure.
Lun,Mer,Ven,Dim 23:05 Sacramento (SMF) 04:49 Guadalajara (GDL) 1
Volaris Y4 1811 Non-stop Airbus A321neo (32Q) 3:44 Effective 2026-01-12 through 2026-01-30
The flight arrives 1 day after departure.
Mar,Jeu 23:15 Sacramento (SMF) 04:59 Guadalajara (GDL) 1
Volaris Y4 1811 Non-stop Airbus A320neo (32N) 3:44 Valid until 2026-01-01
The flight arrives 1 day after departure.
Lun,Mer,Ven,Dim 23:15 Sacramento (SMF) 04:59 Guadalajara (GDL) 1
Volaris Y4 1811 Non-stop Airbus A321neo (32Q) 3:44 Effective 2026-02-01 through 2026-03-06
The flight arrives 1 day after departure.
Lun,Mer,Ven,Dim 23:15 Sacramento (SMF) 03:59 Guadalajara (GDL) 1
Volaris Y4 1811 Non-stop Airbus A321neo (32Q) 3:44 Effective 2026-03-08 through 2026-03-27
The flight arrives 1 day after departure.
Lun,Mer,Ven,Dim 23:59 Sacramento (SMF) 04:52 Guadalajara (GDL) 1
Volaris Y4 1811 Non-stop Airbus A320 (320) 3:53 Effective from 2026-03-29
The flight arrives 1 day after departure.
Lun-Sam 00:40 Sacramento (SMF) 06:24 Guadalajara (GDL) 1
Volaris Y4 1813 Non-stop Airbus A321neo (32Q) 3:44 Valid until 2026-01-07
Lun,Mer,Jeu 00:40 Sacramento (SMF) 06:24 Guadalajara (GDL) 1
Volaris Y4 1813 Non-stop Airbus A321 (321) 3:44 Effective 2026-01-08 through 2026-01-15
Mar,Ven,Sam 00:40 Sacramento (SMF) 06:24 Guadalajara (GDL) 1
Volaris Y4 1813 Non-stop Airbus A321neo (32Q) 3:44 Effective 2026-01-09 through 2026-01-13
Mer-Sam 00:40 Sacramento (SMF) 06:24 Guadalajara (GDL) 1
Volaris Y4 1813 Non-stop Airbus A321 (321) 3:44 Effective 2026-01-16 through 2026-01-23
Lun,Mar,Sam 00:40 Sacramento (SMF) 06:24 Guadalajara (GDL) 1
Volaris Y4 1813 Non-stop Airbus A321neo (32Q) 3:44 Effective 2026-01-19 through 2026-01-27
Lun-Mer,Sam 00:40 Sacramento (SMF) 06:24 Guadalajara (GDL) 1
Volaris Y4 1813 Non-stop Airbus A321neo (32Q) 3:44 Effective 2026-01-28 through 2026-02-04
Jeu,Ven 00:40 Sacramento (SMF) 06:24 Guadalajara (GDL) 1
Volaris Y4 1813 Non-stop Airbus A321 (321) 3:44 Effective 2026-01-29 through 2026-01-30
Lun-Sam 00:40 Sacramento (SMF) 06:24 Guadalajara (GDL) 1
Volaris Y4 1813 Non-stop Airbus A321neo (32Q) 3:44 Effective 2026-02-05 through 2026-03-07
Lun-Sam 00:40 Sacramento (SMF) 05:24 Guadalajara (GDL) 1
Volaris Y4 1813 Non-stop Airbus A320 (320) 3:44 Effective 2026-03-09 through 2026-03-28
Dim 00:40 Sacramento (SMF) 05:27 Guadalajara (GDL) 1
Volaris Y4 1813 Non-stop Airbus A320 (320) 3:47 Operates only on 2026-03-29
Lun-Sam 01:04 Sacramento (SMF) 05:57 Guadalajara (GDL) 1
Volaris Y4 1813 Non-stop Airbus A320 (320) 3:53 Effective from 2026-03-30
Sam 22:56 Sacramento (SMF) 04:40 Guadalajara (GDL) 1
Volaris Y4 1815 Non-stop Airbus A320neo (32N) 3:44 Valid until 2026-01-03
The flight arrives 1 day after departure.
Sam 22:56 Sacramento (SMF) 04:40 Guadalajara (GDL) 1
Volaris Y4 1815 Non-stop Airbus A320 (320) 3:44 Operates only on 2026-01-10
The flight arrives 1 day after departure.
Sam 22:56 Sacramento (SMF) 04:40 Guadalajara (GDL) 1
Volaris Y4 1815 Non-stop Airbus A321neo (32Q) 3:44 Effective 2026-01-17 through 2026-03-07
The flight arrives 1 day after departure.
Sam 22:56 Sacramento (SMF) 03:40 Guadalajara (GDL) 1
Volaris Y4 1815 Non-stop Airbus A320 (320) 3:44 Effective 2026-03-14 through 2026-03-21
The flight arrives 1 day after departure.
Sam 23:44 Sacramento (SMF) 04:37 Guadalajara (GDL) 1
Volaris Y4 1815 Non-stop Airbus A320neo (32N) 3:53 Effective from 2026-04-04
The flight arrives 1 day after departure.
Jeu 23:15 Sacramento (SMF) 04:59 Guadalajara (GDL) 1
Volaris Y4 5727 Non-stop Airbus A320 (320) 3:44 Operates only on 2026-01-08
The flight arrives 1 day after departure.
Mar 23:59 Sacramento (SMF) 05:43 Guadalajara (GDL) 1
Volaris Y4 5735 Non-stop Airbus A321 (321) 3:44 Operates only on 2026-01-06
The flight arrives 1 day after departure.
Vols directs en partage de code:
Mer,Ven,Dim 23:05 Sacramento (SMF) 04:49 Guadalajara (GDL)
Frontier Airlines F9 6811 Non-stop Airbus A321 (321) 3:44 Effective 2026-01-02 through 2026-01-11
Codeshare flight, operated by Volaris.(Y4 1811)
The flight arrives 1 day after departure.
Lun,Mar 23:05 Sacramento (SMF) 04:49 Guadalajara (GDL)
Frontier Airlines F9 6811 Non-stop Airbus A320 (320) 3:44 Effective 2026-01-05 through 2026-01-06
Codeshare flight, operated by Volaris.(Y4 1811)
The flight arrives 1 day after departure.
Lun,Mer,Ven,Dim 23:05 Sacramento (SMF) 04:49 Guadalajara (GDL)
Frontier Airlines F9 6811 Non-stop Airbus A321 (321) 3:44 Effective 2026-01-12 through 2026-01-30
Codeshare flight, operated by Volaris.(Y4 1811)
The flight arrives 1 day after departure.
Mar,Jeu 23:15 Sacramento (SMF) 04:59 Guadalajara (GDL)
Frontier Airlines F9 6811 Non-stop Airbus A320 (320) 3:44 Valid until 2026-01-01
Codeshare flight, operated by Volaris.(Y4 1811)
The flight arrives 1 day after departure.
Lun,Mer,Ven,Dim 23:15 Sacramento (SMF) 04:59 Guadalajara (GDL)
Frontier Airlines F9 6811 Non-stop Airbus A321 (321) 3:44 Effective 2026-02-01 through 2026-03-06
Codeshare flight, operated by Volaris.(Y4 1811)
The flight arrives 1 day after departure.
Lun,Mer,Ven,Dim 23:15 Sacramento (SMF) 03:59 Guadalajara (GDL)
Frontier Airlines F9 6811 Non-stop Airbus A321 (321) 3:44 Effective 2026-03-08 through 2026-03-27
Codeshare flight, operated by Volaris.(Y4 1811)
The flight arrives 1 day after departure.
Lun,Mer,Ven,Dim 23:59 Sacramento (SMF) 04:52 Guadalajara (GDL)
Frontier Airlines F9 6811 Non-stop Airbus A320 (320) 3:53 Effective 2026-03-29 through 2026-04-13
Codeshare flight, operated by Volaris.(Y4 1811)
The flight arrives 1 day after departure.
Lun-Sam 00:40 Sacramento (SMF) 06:24 Guadalajara (GDL)
Frontier Airlines F9 6813 Non-stop Airbus A321 (321) 3:44 Valid until 2026-03-07
Codeshare flight, operated by Volaris.(Y4 1813)
Lun-Sam 00:40 Sacramento (SMF) 05:24 Guadalajara (GDL)
Frontier Airlines F9 6813 Non-stop Airbus A320 (320) 3:44 Effective 2026-03-09 through 2026-03-28
Codeshare flight, operated by Volaris.(Y4 1813)
Dim 00:40 Sacramento (SMF) 05:27 Guadalajara (GDL)
Frontier Airlines F9 6813 Non-stop Airbus A320 (320) 3:47 Operates only on 2026-03-29
Codeshare flight, operated by Volaris.(Y4 1813)
Lun-Sam 01:04 Sacramento (SMF) 05:57 Guadalajara (GDL)
Frontier Airlines F9 6813 Non-stop Airbus A320 (320) 3:53 Effective 2026-03-30 through 2026-04-13
Codeshare flight, operated by Volaris.(Y4 1813)
Sam 22:56 Sacramento (SMF) 04:40 Guadalajara (GDL)
Frontier Airlines F9 6815 Non-stop Airbus A320 (320) 3:44 Valid until 2026-01-10
Codeshare flight, operated by Volaris.(Y4 1815)
The flight arrives 1 day after departure.
Sam 22:56 Sacramento (SMF) 04:40 Guadalajara (GDL)
Frontier Airlines F9 6815 Non-stop Airbus A321 (321) 3:44 Effective 2026-01-17 through 2026-03-07
Codeshare flight, operated by Volaris.(Y4 1815)
The flight arrives 1 day after departure.
Sam 22:56 Sacramento (SMF) 03:40 Guadalajara (GDL)
Frontier Airlines F9 6815 Non-stop Airbus A320 (320) 3:44 Effective 2026-03-14 through 2026-03-21
Codeshare flight, operated by Volaris.(Y4 1815)
The flight arrives 1 day after departure.
1 2   next


Toutes les compagnies reliant Sacramento (SMF) à Guadalajara (GDL).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Operates only on 2026-03-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:52, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-03-09 through 2026-03-28
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:52, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective from 2026-10-26
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:52, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-02-05 through 2026-03-07
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:51, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Valid until 2026-01-11
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:54, non-stop
Boeing 737-800 (7S8)

Vols directs:

Operates only on 2026-01-12
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:52, non-stop
Boeing 737 MAX 9 (7M9)

Vols directs:

Effective 2026-01-13 through 2026-02-04
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:52, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

Effective 2026-03-29 through 2026-10-25
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:58, non-stop
Boeing 737 MAX 8 (7M8)

Vols directs:

22:40

04:34(+1)
Valid until 2026-01-04
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:54, non-stop
Boeing 737-800 (7S8)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-01-02 through 2026-01-07
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:44, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-01-04 through 2026-01-11
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 3:44, non-stop
Airbus A321 (321)
The flight arrives 1 day after departure.

Vols directs:

Operates only on 2026-01-05
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:44, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Vols directs:

Operates only on 2026-01-06
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:44, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-01-12 through 2026-01-30
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Duration: 3:44, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

Vols directs:

Valid until 2026-01-01
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:44, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-02-01 through 2026-03-06
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Duration: 3:44, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-03-08 through 2026-03-27
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Duration: 3:44, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

Vols directs:

Effective from 2026-03-29
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Duration: 3:53, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Vols directs:

Valid until 2026-01-07
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Duration: 3:44, non-stop
Airbus A321neo (32Q)

Vols directs:

Effective 2026-01-08 through 2026-01-15
Lun
Mar
-
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:44, non-stop
Airbus A321 (321)

Vols directs:

Effective 2026-01-09 through 2026-01-13
Lun
-
Mar
Mer
-
Jeu
-
Ven
Sam
Dim
-
Duration: 3:44, non-stop
Airbus A321neo (32Q)

Vols directs:

Effective 2026-01-16 through 2026-01-23
Lun
-
Mar
-
Mer
Jeu
Ven
Sam
Dim
-
Duration: 3:44, non-stop
Airbus A321 (321)

Vols directs:

Effective 2026-01-19 through 2026-01-27
Lun
Mar
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:44, non-stop
Airbus A321neo (32Q)

Vols directs:

Effective 2026-01-28 through 2026-02-04
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:44, non-stop
Airbus A321neo (32Q)

Vols directs:

Effective 2026-01-29 through 2026-01-30
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:44, non-stop
Airbus A321 (321)

Vols directs:

Effective 2026-02-05 through 2026-03-07
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Duration: 3:44, non-stop
Airbus A321neo (32Q)

Vols directs:

Effective 2026-03-09 through 2026-03-28
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Duration: 3:44, non-stop
Airbus A320 (320)

Vols directs:

Operates only on 2026-03-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:47, non-stop
Airbus A320 (320)

Vols directs:

Effective from 2026-03-30
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Duration: 3:53, non-stop
Airbus A320 (320)

Vols directs:

Valid until 2026-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:44, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

Vols directs:

Operates only on 2026-01-10
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:44, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-01-17 through 2026-03-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:44, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-03-14 through 2026-03-21
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:44, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Vols directs:

Effective from 2026-04-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:53, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

Vols directs:

Operates only on 2026-01-08
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:44, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Vols directs:

Operates only on 2026-01-06
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:44, non-stop
Airbus A321 (321)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-01-02 through 2026-01-11
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Volaris. (Y4 1811)
Duration: 3:44, non-stop
Airbus A321 (321)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-01-05 through 2026-01-06
Lun
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Volaris. (Y4 1811)
Duration: 3:44, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-01-12 through 2026-01-30
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Volaris. (Y4 1811)
Duration: 3:44, non-stop
Airbus A321 (321)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Valid until 2026-01-01
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Volaris. (Y4 1811)
Duration: 3:44, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-02-01 through 2026-03-06
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Volaris. (Y4 1811)
Duration: 3:44, non-stop
Airbus A321 (321)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-03-08 through 2026-03-27
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Volaris. (Y4 1811)
Duration: 3:44, non-stop
Airbus A321 (321)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-03-29 through 2026-04-13
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Volaris. (Y4 1811)
Duration: 3:53, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Valid until 2026-03-07
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Volaris. (Y4 1813)
Duration: 3:44, non-stop
Airbus A321 (321)

Vols directs en partage de code:

Effective 2026-03-09 through 2026-03-28
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Volaris. (Y4 1813)
Duration: 3:44, non-stop
Airbus A320 (320)

Vols directs en partage de code:

Operates only on 2026-03-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Volaris. (Y4 1813)
Duration: 3:47, non-stop
Airbus A320 (320)

Vols directs en partage de code:

Effective 2026-03-30 through 2026-04-13
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Volaris. (Y4 1813)
Duration: 3:53, non-stop
Airbus A320 (320)

Vols directs en partage de code:

Valid until 2026-01-10
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Volaris. (Y4 1815)
Duration: 3:44, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-01-17 through 2026-03-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Volaris. (Y4 1815)
Duration: 3:44, non-stop
Airbus A321 (321)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2026-03-14 through 2026-03-21
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Volaris. (Y4 1815)
Duration: 3:44, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.
Page 1 / 2        next
  • Il s'agit d'une ligne internationale au départ de l'aéroport de Sacramento, United States (SMF) et à destination de l'aéroport de Guadalajara, Mexico (GDL).
  • La distance est de 2672 km.
  • Le fuseau horaire de l'aéroport de départ est UTC-8 , et le fuseau horaire de l'aéroport d'arrivée est UTC-6 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.
  • Pour les vols directs, le temps de vol varie entre 3:44 et 3:58.