Toutes les compagnies reliant Neuquen (NQN) à Cordoba (COR).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Ven 13:45 Neuquen (NQN) 15:25 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Valid until 2025-06-27
Dim 13:55 Neuquen (NQN) 15:35 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-200 Combi (73M) 1:40 Operates only on 2025-05-04
Dim 13:55 Neuquen (NQN) 15:35 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-05-11 through 2025-05-18
Dim 13:55 Neuquen (NQN) 15:35 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-200 Combi (73M) 1:40 Operates only on 2025-05-25
Dim 13:55 Neuquen (NQN) 15:35 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-06-01 through 2025-06-29
Mar,Jeu 14:00 Neuquen (NQN) 15:40 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Valid until 2025-05-29
Mar 14:00 Neuquen (NQN) 15:40 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2025-06-03 through 2025-06-24
Jeu 14:00 Neuquen (NQN) 15:40 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-06-05 through 2025-06-26
Mar 14:00 Neuquen (NQN) 15:40 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-07-01 through 2025-07-29
Mar 14:00 Neuquen (NQN) 15:40 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-09-02 through 2026-01-27
Lun 14:05 Neuquen (NQN) 15:45 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Valid until 2025-06-30
Ven 14:05 Neuquen (NQN) 15:45 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-07-04 through 2025-07-25
Dim 14:05 Neuquen (NQN) 15:45 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-08-03 through 2025-08-31
Ven 14:05 Neuquen (NQN) 15:45 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-09-05 through 2026-01-30
Lun 14:05 Neuquen (NQN) 15:45 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-700 (73R) 1:40 Effective from 2026-02-02
Mer,Ven,Sam 14:05 Neuquen (NQN) 15:45 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Effective from 2026-02-04
Mer 14:15 Neuquen (NQN) 15:55 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-05-07 through 2025-05-28
Mer,Jeu,Dim 14:15 Neuquen (NQN) 15:55 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-07-02 through 2025-07-31
Lun-Ven 14:15 Neuquen (NQN) 15:55 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-08-01 through 2025-09-01
Lun,Mer,Jeu,Dim 14:15 Neuquen (NQN) 15:55 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-09-03 through 2026-01-29
Mer 14:20 Neuquen (NQN) 16:00 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-06-04 through 2025-06-25
Lun 14:25 Neuquen (NQN) 16:05 Cordoba (COR)
Aerolineas Argentinas AR 1573 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-07-07 through 2025-07-28
Ven,Dim 16:15 Neuquen (NQN) 17:50 Cordoba (COR)
Flybondi FO 5471 Non-stop Boeing 737-800 (738) 1:35
Lun 17:10 Neuquen (NQN) 18:45 Cordoba (COR)
Flybondi FO 5471 Non-stop Boeing 737-800 (738) 1:35
Mer 18:45 Neuquen (NQN) 20:20 Cordoba (COR)
Flybondi FO 5471 Non-stop Boeing 737-800 (738) 1:35
Vols directs en partage de code:
Ven 13:45 Neuquen (NQN) 15:25 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Valid until 2025-06-27
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Dim 13:55 Neuquen (NQN) 15:35 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737 MAX 8 (7M8) 1:40 Operates only on 2025-05-04
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Dim 13:55 Neuquen (NQN) 15:35 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-05-11 through 2025-05-18
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Dim 13:55 Neuquen (NQN) 15:35 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737 MAX 8 (7M8) 1:40 Operates only on 2025-05-25
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Dim 13:55 Neuquen (NQN) 15:35 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-06-01 through 2025-06-29
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Mar 14:00 Neuquen (NQN) 15:40 Cordoba (COR)
Gol G3 3133 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2025-06-24
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Mar,Jeu 14:00 Neuquen (NQN) 15:40 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-06-26 through 2025-07-01
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Mar 14:00 Neuquen (NQN) 15:40 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-07-08 through 2025-07-29
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Mar 14:00 Neuquen (NQN) 15:40 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-09-02 through 2025-10-21
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Lun 14:05 Neuquen (NQN) 15:45 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Valid until 2025-06-30
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Ven 14:05 Neuquen (NQN) 15:45 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-07-04 through 2025-07-25
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Dim 14:05 Neuquen (NQN) 15:45 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-08-03 through 2025-08-31
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Ven 14:05 Neuquen (NQN) 15:45 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-09-05 through 2026-01-30
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Mer 14:15 Neuquen (NQN) 15:55 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-05-07 through 2025-05-28
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Mer,Jeu,Dim 14:15 Neuquen (NQN) 15:55 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-07-02 through 2025-07-31
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Lun-Ven 14:15 Neuquen (NQN) 15:55 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-08-01 through 2025-09-01
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Lun,Mer,Jeu,Dim 14:15 Neuquen (NQN) 15:55 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-09-03 through 2025-10-23
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Lun,Mer 14:15 Neuquen (NQN) 15:55 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-10-27 through 2026-01-28
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Mer 14:20 Neuquen (NQN) 16:00 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-06-04 through 2025-06-25
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)
Lun 14:25 Neuquen (NQN) 16:05 Cordoba (COR)
Gol G3 3133 Non-stop Boeing 737-800 (738) 1:40 Effective 2025-07-07 through 2025-07-28
Codeshare flight, operated by Aerolineas Argentinas.(AR 1573)


Toutes les compagnies reliant Neuquen (NQN) à Cordoba (COR).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Valid until 2025-06-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Operates only on 2025-05-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-200 Combi (73M)

Effective 2025-05-11 through 2025-05-18
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-800 (738)

Operates only on 2025-05-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-200 Combi (73M)

Effective 2025-06-01 through 2025-06-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-800 (738)

Valid until 2025-05-29
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-06-03 through 2025-06-24
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Effective 2025-06-05 through 2025-06-26
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-07-01 through 2025-07-29
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-09-02 through 2026-01-27
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Valid until 2025-06-30
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-07-04 through 2025-07-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-08-03 through 2025-08-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-09-05 through 2026-01-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective from 2026-02-02
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-700 (73R)

Effective from 2026-02-04
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-05-07 through 2025-05-28
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-07-02 through 2025-07-31
Lun
-
Mar
-
Mer
Jeu
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-08-01 through 2025-09-01
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-09-03 through 2026-01-29
Lun
Mar
-
Mer
Jeu
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-06-04 through 2025-06-25
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-07-07 through 2025-07-28
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:35, non-stop
Boeing 737-800 (738)

Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737-800 (738)

Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Valid until 2025-06-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Operates only on 2025-05-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-05-11 through 2025-05-18
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Operates only on 2025-05-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-06-01 through 2025-06-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Operates only on 2025-06-24
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Effective 2025-06-26 through 2025-07-01
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-07-08 through 2025-07-29
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-09-02 through 2025-10-21
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Valid until 2025-06-30
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-07-04 through 2025-07-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-08-03 through 2025-08-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-09-05 through 2026-01-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-05-07 through 2025-05-28
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-07-02 through 2025-07-31
Lun
-
Mar
-
Mer
Jeu
Ven
-
Sam
-
Dim
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-08-01 through 2025-09-01
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-09-03 through 2025-10-23
Lun
Mar
-
Mer
Jeu
Ven
-
Sam
-
Dim
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-10-27 through 2026-01-28
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-06-04 through 2025-06-25
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2025-07-07 through 2025-07-28
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1573)
Duration: 1:40, non-stop
Boeing 737-800 (738)
  • Il s'agit d'une ligne intérieure au départ de l'aéroport de Neuquen (NQN) et à destination de l'aéroport de Cordoba (COR).
  • La distance est de 920 km.
  • Le fuseau horaire de l'aéroport de départ et de l'aéroport d'arrivée est UTC-3 . Dans les deux aéroports, il est actuellement (loading...).
  • Pour les vols directs, le temps de vol varie entre 1:35 et 1:40.