Toutes les compagnies reliant Mendoza (MDZ) à Buenos Aires Jorge Newbery Airfield (AEP).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:
Lun 09:40 Mendoza (MDZ) 11:20 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5941 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-07-06 through 2026-08-31
Codeshare flight, operated by Aerolineas Argentinas.(AR 1405)
Lun 09:55 Mendoza (MDZ) 11:35 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5941 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2026-06-29
Codeshare flight, operated by Aerolineas Argentinas.(AR 1405)
Mar 10:55 Mendoza (MDZ) 12:35 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5941 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-09-08 through 2026-10-20
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Lun 12:40 Mendoza (MDZ) 14:20 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5941 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2026-03-30
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Lun 18:20 Mendoza (MDZ) 20:00 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5942 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2026-03-30
Codeshare flight, operated by Aerolineas Argentinas.(AR 1417)
Lun 13:50 Mendoza (MDZ) 15:30 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5943 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-07-06 through 2026-08-31
Codeshare flight, operated by Aerolineas Argentinas.(AR 1419)
Lun 14:20 Mendoza (MDZ) 16:00 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5943 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2026-06-29
Codeshare flight, operated by Aerolineas Argentinas.(AR 1419)
Mer 16:00 Mendoza (MDZ) 17:40 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5943 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-06-03 through 2026-06-24
Codeshare flight, operated by Aerolineas Argentinas.(AR 1417)
Mar 16:00 Mendoza (MDZ) 17:40 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5945 Non-stop Boeing 737-700 (73R) 1:40 Effective 2026-06-02 through 2026-06-23
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Dim 18:00 Mendoza (MDZ) 19:40 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5945 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-04-05 through 2026-06-28
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Dim 08:50 Mendoza (MDZ) 10:30 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5947 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-01-04 through 2026-01-25
Codeshare flight, operated by Aerolineas Argentinas.(AR 1403)
Dim 12:55 Mendoza (MDZ) 14:35 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5947 Non-stop Boeing 737-800 (738) 1:40 Operates only on 2026-07-05
Codeshare flight, operated by Aerolineas Argentinas.(AR 1425)
Mar 14:40 Mendoza (MDZ) 16:20 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5948 Non-stop Boeing 737-800 (738) 1:40 Operates only on 2026-09-01
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Mer 17:50 Mendoza (MDZ) 19:30 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5948 Non-stop Boeing 737-700 (73R) 1:40 Effective 2026-09-09 through 2026-10-21
Codeshare flight, operated by Aerolineas Argentinas.(AR 1421)
Ven 18:10 Mendoza (MDZ) 19:50 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5948 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-03-06 through 2026-03-27
Codeshare flight, operated by Aerolineas Argentinas.(AR 1419)
Mer 18:50 Mendoza (MDZ) 20:30 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5949 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-06-03 through 2026-06-24
Codeshare flight, operated by Aerolineas Argentinas.(AR 1427)
Mer 11:50 Mendoza (MDZ) 13:30 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5952 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-07-08 through 2026-07-29
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Dim 13:00 Mendoza (MDZ) 14:40 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5952 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-04-05 through 2026-06-28
Codeshare flight, operated by Aerolineas Argentinas.(AR 1417)
Dim 13:20 Mendoza (MDZ) 15:00 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5952 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-03-01 through 2026-03-29
Codeshare flight, operated by Aerolineas Argentinas.(AR 1417)
Mer 16:00 Mendoza (MDZ) 17:40 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5952 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-04-01 through 2026-05-27
Codeshare flight, operated by Aerolineas Argentinas.(AR 1417)
Dim 16:25 Mendoza (MDZ) 18:05 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5952 Non-stop Boeing 737-700 (73R) 1:40 Operates only on 2026-02-01
Codeshare flight, operated by Aerolineas Argentinas.(AR 1417)
Dim 16:25 Mendoza (MDZ) 18:05 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5952 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-02-08 through 2026-02-15
Codeshare flight, operated by Aerolineas Argentinas.(AR 1417)
Dim 16:25 Mendoza (MDZ) 18:05 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5952 Non-stop Boeing 737-700 (73R) 1:40 Operates only on 2026-02-22
Codeshare flight, operated by Aerolineas Argentinas.(AR 1417)
Sam 16:25 Mendoza (MDZ) 18:05 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5952 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-04-04 through 2026-06-27
Codeshare flight, operated by Aerolineas Argentinas.(AR 1417)
Lun 08:45 Mendoza (MDZ) 10:25 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5954 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-09-07 through 2026-10-19
Codeshare flight, operated by Aerolineas Argentinas.(AR 1403)
Ven 07:30 Mendoza (MDZ) 09:10 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5957 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-07-10 through 2026-08-28
Codeshare flight, operated by Aerolineas Argentinas.(AR 1401)
Dim 09:30 Mendoza (MDZ) 11:10 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5957 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-07-12 through 2026-08-30
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Mar 09:50 Mendoza (MDZ) 11:30 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5957 Non-stop Boeing 737-800 (738) 1:40 Operates only on 2026-06-30
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Lun 09:55 Mendoza (MDZ) 11:35 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5957 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-09-07 through 2026-10-19
Codeshare flight, operated by Aerolineas Argentinas.(AR 1405)
Mar 10:00 Mendoza (MDZ) 11:40 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5957 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-07-07 through 2026-08-25
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Ven 12:05 Mendoza (MDZ) 13:45 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5957 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-04-03 through 2026-06-26
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Sam 07:30 Mendoza (MDZ) 09:10 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5958 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-07-11 through 2026-08-29
Codeshare flight, operated by Aerolineas Argentinas.(AR 1401)
Ven 08:45 Mendoza (MDZ) 10:25 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5959 Non-stop Boeing 737-800 (738) 1:40 Operates only on 2026-09-04
Codeshare flight, operated by Aerolineas Argentinas.(AR 1403)
Ven 12:50 Mendoza (MDZ) 14:30 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5959 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-07-10 through 2026-08-28
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Lun 13:50 Mendoza (MDZ) 15:30 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5959 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-09-07 through 2026-10-19
Codeshare flight, operated by Aerolineas Argentinas.(AR 1419)
Ven 17:40 Mendoza (MDZ) 19:20 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5959 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-04-03 through 2026-06-26
Codeshare flight, operated by Aerolineas Argentinas.(AR 1423)
Ven 07:30 Mendoza (MDZ) 09:10 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5960 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2026-07-03
Codeshare flight, operated by Aerolineas Argentinas.(AR 1401)
Ven 18:00 Mendoza (MDZ) 19:40 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5960 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-07-10 through 2026-08-28
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Sam 08:45 Mendoza (MDZ) 10:25 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5961 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-07-11 through 2026-08-29
Codeshare flight, operated by Aerolineas Argentinas.(AR 1403)
Mer 12:35 Mendoza (MDZ) 14:15 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5961 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2026-07-01
Codeshare flight, operated by Aerolineas Argentinas.(AR 1403)
Ven 13:30 Mendoza (MDZ) 15:10 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5961 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2026-07-03
Codeshare flight, operated by Aerolineas Argentinas.(AR 1403)
Jeu 07:35 Mendoza (MDZ) 09:15 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5962 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-03-05 through 2026-03-26
Codeshare flight, operated by Aerolineas Argentinas.(AR 1401)
Jeu 12:00 Mendoza (MDZ) 13:40 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5962 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-07-09 through 2026-08-27
Codeshare flight, operated by Aerolineas Argentinas.(AR 1405)
Ven 12:50 Mendoza (MDZ) 14:30 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5962 Non-stop Boeing 737-800 (738) 1:40 Operates only on 2026-07-03
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Mar 14:25 Mendoza (MDZ) 16:05 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5962 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-02-03 through 2026-02-24
Codeshare flight, operated by Aerolineas Argentinas.(AR 1419)
Jeu 09:30 Mendoza (MDZ) 11:10 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5963 Non-stop Boeing 737-800 (738) 1:40 Effective 2026-07-09 through 2026-08-27
Codeshare flight, operated by Aerolineas Argentinas.(AR 1409)
Sam 09:45 Mendoza (MDZ) 11:25 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5963 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Effective 2026-07-11 through 2026-08-29
Codeshare flight, operated by Aerolineas Argentinas.(AR 1405)
Jeu 09:50 Mendoza (MDZ) 11:30 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5963 Non-stop Boeing 737-800 (738) 1:40 Operates only on 2026-07-02
Codeshare flight, operated by Aerolineas Argentinas.(AR 1403)
Ven 18:10 Mendoza (MDZ) 19:50 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5963 Non-stop Embraer EMB 190 / EMB 195 (E90) 1:40 Operates only on 2026-07-03
Codeshare flight, operated by Aerolineas Argentinas.(AR 1411)
Jeu 08:45 Mendoza (MDZ) 10:25 Buenos Aires Jorge Newbery Airfield (AEP)
LATAM Airlines LA 5964 Non-stop Boeing 737-800 (738) 1:40 Operates only on 2026-09-03
Codeshare flight, operated by Aerolineas Argentinas.(AR 1403)
prev   1 2 3 ... 19 20 21 22 23 24 25 ... 29 30 31   next


Toutes les compagnies reliant Mendoza (MDZ) à Buenos Aires Jorge Newbery Airfield (AEP).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:

Effective 2026-07-06 through 2026-08-31
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1405)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Operates only on 2026-06-29
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1405)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Effective 2026-09-08 through 2026-10-20
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Operates only on 2026-03-30
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Operates only on 2026-03-30
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1417)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Effective 2026-07-06 through 2026-08-31
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1419)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Operates only on 2026-06-29
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1419)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Effective 2026-06-03 through 2026-06-24
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1417)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Effective 2026-06-02 through 2026-06-23
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Boeing 737-700 (73R)

Vols directs en partage de code:

Effective 2026-04-05 through 2026-06-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Effective 2026-01-04 through 2026-01-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Aerolineas Argentinas. (AR 1403)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Operates only on 2026-07-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Aerolineas Argentinas. (AR 1425)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Operates only on 2026-09-01
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Effective 2026-09-09 through 2026-10-21
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1421)
Duration: 1:40, non-stop
Boeing 737-700 (73R)

Vols directs en partage de code:

Effective 2026-03-06 through 2026-03-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1419)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Effective 2026-06-03 through 2026-06-24
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1427)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Effective 2026-07-08 through 2026-07-29
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Effective 2026-04-05 through 2026-06-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Aerolineas Argentinas. (AR 1417)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Effective 2026-03-01 through 2026-03-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Aerolineas Argentinas. (AR 1417)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Effective 2026-04-01 through 2026-05-27
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1417)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Operates only on 2026-02-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Aerolineas Argentinas. (AR 1417)
Duration: 1:40, non-stop
Boeing 737-700 (73R)

Vols directs en partage de code:

Effective 2026-02-08 through 2026-02-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Aerolineas Argentinas. (AR 1417)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Operates only on 2026-02-22
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Aerolineas Argentinas. (AR 1417)
Duration: 1:40, non-stop
Boeing 737-700 (73R)

Vols directs en partage de code:

Effective 2026-04-04 through 2026-06-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1417)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Effective 2026-09-07 through 2026-10-19
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1403)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Effective 2026-07-10 through 2026-08-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1401)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Effective 2026-07-12 through 2026-08-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Operates only on 2026-06-30
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Effective 2026-09-07 through 2026-10-19
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1405)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Effective 2026-07-07 through 2026-08-25
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Effective 2026-04-03 through 2026-06-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Effective 2026-07-11 through 2026-08-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1401)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Operates only on 2026-09-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1403)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Effective 2026-07-10 through 2026-08-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Effective 2026-09-07 through 2026-10-19
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1419)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Effective 2026-04-03 through 2026-06-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1423)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Operates only on 2026-07-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1401)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Effective 2026-07-10 through 2026-08-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Effective 2026-07-11 through 2026-08-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1403)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Operates only on 2026-07-01
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1403)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Operates only on 2026-07-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1403)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Effective 2026-03-05 through 2026-03-26
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1401)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Effective 2026-07-09 through 2026-08-27
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1405)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Operates only on 2026-07-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Effective 2026-02-03 through 2026-02-24
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1419)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Effective 2026-07-09 through 2026-08-27
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1409)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Effective 2026-07-11 through 2026-08-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1405)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Operates only on 2026-07-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1403)
Duration: 1:40, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Operates only on 2026-07-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1411)
Duration: 1:40, non-stop
Embraer EMB 190 / EMB 195 (E90)

Vols directs en partage de code:

Operates only on 2026-09-03
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Aerolineas Argentinas. (AR 1403)
Duration: 1:40, non-stop
Boeing 737-800 (738)
prev        Page 22 / 31        next
  • Il s'agit d'une ligne intérieure au départ de l'aéroport de Mendoza (MDZ) et à destination de l'aéroport de Buenos Aires Jorge Newbery Airfield (AEP).
  • La distance est de 978 km.
  • Le fuseau horaire de l'aéroport de départ et de l'aéroport d'arrivée est UTC-3 . Dans les deux aéroports, il est actuellement (loading...).
  • Pour les vols directs, le temps de vol varie entre 1:35 et 11:05.