Toutes les compagnies reliant Lima (LIM) à Chiclayo (CIX).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:
Jeu 17:00 Lima (LIM) 18:30 Chiclayo (CIX)
Delta Air Lines DL 6126 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-03-14
Codeshare flight, operated by LATAM Airlines Group.(LA 2280)
Mar 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6128 Non-stop Airbus A320 (320) 1:30 Effective 2024-05-07 through 2024-05-14
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Lun 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6129 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-08-12
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Jeu 17:00 Lima (LIM) 18:30 Chiclayo (CIX)
Delta Air Lines DL 6132 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-03-28
Codeshare flight, operated by LATAM Airlines Group.(LA 2280)
Dim 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6133 Non-stop Airbus A320 (320) 1:30 Effective 2024-04-07 through 2024-04-28
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Sam 17:00 Lima (LIM) 18:30 Chiclayo (CIX)
Delta Air Lines DL 6134 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-07-27
Codeshare flight, operated by LATAM Airlines Group.(LA 2280)
Mar 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6136 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-05-28
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Sam 17:00 Lima (LIM) 18:30 Chiclayo (CIX)
Delta Air Lines DL 6136 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-07-13
Codeshare flight, operated by LATAM Airlines Group.(LA 2280)
Ven 10:30 Lima (LIM) 12:00 Chiclayo (CIX)
Delta Air Lines DL 6137 Non-stop Airbus A320 (320) 1:30 Effective 2024-04-05 through 2024-04-26
Codeshare flight, operated by LATAM Airlines Group.(LA 2268)
Sam 17:00 Lima (LIM) 18:30 Chiclayo (CIX)
Delta Air Lines DL 6149 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-07-20
Codeshare flight, operated by LATAM Airlines Group.(LA 2280)
Sam 17:00 Lima (LIM) 18:30 Chiclayo (CIX)
Delta Air Lines DL 6149 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-08-10
Codeshare flight, operated by LATAM Airlines Group.(LA 2280)
Mar 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6156 Non-stop Airbus A320 (320) 1:30 Effective 2024-04-09 through 2024-04-30
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Jeu 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6157 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-05-02
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Mer 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6157 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-07-03
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Dim 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6165 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-05-26
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Sam 05:00 Lima (LIM) 06:30 Chiclayo (CIX)
Delta Air Lines DL 6167 Non-stop Airbus A319 (319) 1:30 Effective 2024-01-13 through 2024-01-20
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Jeu 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6169 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-04-04
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Dim 08:35 Lima (LIM) 10:05 Chiclayo (CIX)
Delta Air Lines DL 6169 Non-stop Airbus A319 (319) 1:30 Effective 2024-03-17 through 2024-03-24
Codeshare flight, operated by LATAM Airlines Group.(LA 2272)
Lun,Dim 11:25 Lima (LIM) 12:55 Chiclayo (CIX)
Delta Air Lines DL 6169 Non-stop Airbus A320 (320) 1:30 Effective 2024-03-31 through 2024-04-29
Codeshare flight, operated by LATAM Airlines Group.(LA 2276)
Lun 11:25 Lima (LIM) 12:55 Chiclayo (CIX)
Delta Air Lines DL 6169 Non-stop Airbus A320 (320) 1:30 Effective 2024-05-06 through 2024-05-27
Codeshare flight, operated by LATAM Airlines Group.(LA 2276)
Mar 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6170 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-04-02
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Jeu 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6173 Non-stop Airbus A320 (320) 1:30 Effective 2024-04-11 through 2024-04-25
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Ven 05:00 Lima (LIM) 06:30 Chiclayo (CIX)
Delta Air Lines DL 6176 Non-stop Airbus A319 (319) 1:30 Effective 2024-01-05 through 2024-01-12
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Mer 17:00 Lima (LIM) 18:30 Chiclayo (CIX)
Delta Air Lines DL 6186 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-03-20
Codeshare flight, operated by LATAM Airlines Group.(LA 2280)
Ven 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6191 Non-stop Airbus A320 (320) 1:30 Effective 2024-04-12 through 2024-04-26
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Sam 05:00 Lima (LIM) 06:30 Chiclayo (CIX)
Delta Air Lines DL 6193 Non-stop Airbus A319 (319) 1:30 Operates only on 2024-01-27
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Mar,Ven 10:30 Lima (LIM) 12:00 Chiclayo (CIX)
Delta Air Lines DL 6193 Non-stop Airbus A319 (319) 1:30 Effective 2024-03-29 through 2024-04-02
Codeshare flight, operated by LATAM Airlines Group.(LA 2268)
Mar 10:30 Lima (LIM) 12:00 Chiclayo (CIX)
Delta Air Lines DL 6193 Non-stop Airbus A319 (319) 1:30 Effective from 2024-04-09
Codeshare flight, operated by LATAM Airlines Group.(LA 2268)
Ven 10:30 Lima (LIM) 12:00 Chiclayo (CIX)
Delta Air Lines DL 6193 Non-stop Airbus A320 (320) 1:30 Effective 2024-05-03 through 2024-10-25
Codeshare flight, operated by LATAM Airlines Group.(LA 2268)
Ven 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6200 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-05-31
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Dim 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6201 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-08-11
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Mer 17:00 Lima (LIM) 18:30 Chiclayo (CIX)
Delta Air Lines DL 6201 Non-stop Airbus A320 (320) 1:30 Effective 2024-03-06 through 2024-03-13
Codeshare flight, operated by LATAM Airlines Group.(LA 2280)
Mer 17:00 Lima (LIM) 18:30 Chiclayo (CIX)
Delta Air Lines DL 6201 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-03-27
Codeshare flight, operated by LATAM Airlines Group.(LA 2280)
Sam 05:00 Lima (LIM) 06:30 Chiclayo (CIX)
Delta Air Lines DL 6203 Non-stop Airbus A319 (319) 1:30 Operates only on 2024-01-06
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Ven 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6203 Non-stop Airbus A320 (320) 1:30 Effective 2024-05-03 through 2024-05-24
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Mer 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6210 Non-stop Airbus A320 (320) 1:30 Effective 2024-09-04 through 2024-10-23
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Sam 17:00 Lima (LIM) 18:30 Chiclayo (CIX)
Delta Air Lines DL 6213 Non-stop Airbus A320 (320) 1:30 Effective 2024-09-28 through 2024-10-26
Codeshare flight, operated by LATAM Airlines Group.(LA 2280)
Ven 10:30 Lima (LIM) 12:00 Chiclayo (CIX)
Delta Air Lines DL 6222 Non-stop Airbus A319 (319) 1:30 Operates only on 2024-03-15
Codeshare flight, operated by LATAM Airlines Group.(LA 2268)
Ven 10:30 Lima (LIM) 12:00 Chiclayo (CIX)
Delta Air Lines DL 6223 Non-stop Airbus A319 (319) 1:30 Operates only on 2024-03-22
Codeshare flight, operated by LATAM Airlines Group.(LA 2268)
Dim 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6225 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-03-31
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Mar 10:30 Lima (LIM) 12:00 Chiclayo (CIX)
Delta Air Lines DL 6233 Non-stop Airbus A320 (320) 1:30 Effective 2024-03-12 through 2024-03-26
Codeshare flight, operated by LATAM Airlines Group.(LA 2268)
Mar 10:30 Lima (LIM) 12:00 Chiclayo (CIX)
Delta Air Lines DL 6236 Non-stop Airbus A319 (319) 1:30 Effective 2024-01-23 through 2024-01-30
Codeshare flight, operated by LATAM Airlines Group.(LA 2268)
Mar 10:30 Lima (LIM) 12:00 Chiclayo (CIX)
Delta Air Lines DL 6236 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-02-06
Codeshare flight, operated by LATAM Airlines Group.(LA 2268)
Mar 10:30 Lima (LIM) 12:00 Chiclayo (CIX)
Delta Air Lines DL 6237 Non-stop Airbus A320 (320) 1:30 Effective 2024-02-20 through 2024-02-27
Codeshare flight, operated by LATAM Airlines Group.(LA 2268)
Ven 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6238 Non-stop Airbus A320 (320) 1:30 Effective 2024-08-02 through 2024-08-09
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Mar 10:30 Lima (LIM) 12:00 Chiclayo (CIX)
Delta Air Lines DL 6240 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-03-05
Codeshare flight, operated by LATAM Airlines Group.(LA 2268)
Mar 10:30 Lima (LIM) 12:00 Chiclayo (CIX)
Delta Air Lines DL 6242 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-02-13
Codeshare flight, operated by LATAM Airlines Group.(LA 2268)
Ven 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6243 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-04-05
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Tous les jours 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6243 Non-stop Airbus A320 (320) 1:30 Effective from 2024-10-27
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
Sam 05:20 Lima (LIM) 06:50 Chiclayo (CIX)
Delta Air Lines DL 6244 Non-stop Airbus A320 (320) 1:30 Operates only on 2024-08-03
Codeshare flight, operated by LATAM Airlines Group.(LA 2270)
prev   1 2 3 4 5 6 7 8 9   next


Toutes les compagnies reliant Lima (LIM) à Chiclayo (CIX).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:

Operates only on 2024-03-14
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2280)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-05-07 through 2024-05-14
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-08-12
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-03-28
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2280)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-04-07 through 2024-04-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-07-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2280)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-05-28
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-07-13
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2280)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-04-05 through 2024-04-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2268)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-07-20
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2280)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-08-10
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2280)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-04-09 through 2024-04-30
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-05-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-07-03
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-05-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-01-13 through 2024-01-20
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A319 (319)

Operates only on 2024-04-04
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-03-17 through 2024-03-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by LATAM Airlines Group. (LA 2272)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective 2024-03-31 through 2024-04-29
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by LATAM Airlines Group. (LA 2276)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-05-06 through 2024-05-27
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2276)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-04-02
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-04-11 through 2024-04-25
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-01-05 through 2024-01-12
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A319 (319)

Operates only on 2024-03-20
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2280)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-04-12 through 2024-04-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-01-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective 2024-03-29 through 2024-04-02
Lun
-
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2268)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective from 2024-04-09
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2268)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective 2024-05-03 through 2024-10-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2268)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-05-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-08-11
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-03-06 through 2024-03-13
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2280)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-03-27
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2280)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-01-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A319 (319)

Effective 2024-05-03 through 2024-05-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-09-04 through 2024-10-23
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-09-28 through 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2280)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-03-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2268)
Duration: 1:30, non-stop
Airbus A319 (319)

Operates only on 2024-03-22
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2268)
Duration: 1:30, non-stop
Airbus A319 (319)

Operates only on 2024-03-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-03-12 through 2024-03-26
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2268)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-01-23 through 2024-01-30
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2268)
Duration: 1:30, non-stop
Airbus A319 (319)

Operates only on 2024-02-06
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2268)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-02-20 through 2024-02-27
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2268)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective 2024-08-02 through 2024-08-09
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-03-05
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2268)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-02-13
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2268)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-04-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Effective from 2024-10-27
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)

Operates only on 2024-08-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by LATAM Airlines Group. (LA 2270)
Duration: 1:30, non-stop
Airbus A320 (320)
prev        Page 5 / 9        next
  • Il s'agit d'une ligne intérieure au départ de l'aéroport de Lima (LIM) et à destination de l'aéroport de Chiclayo (CIX).
  • La distance est de 653 km.
  • Le fuseau horaire de l'aéroport de départ et de l'aéroport d'arrivée est UTC-5 . Dans les deux aéroports, il est actuellement (loading...).
  • Pour les vols directs, le temps de vol varie entre 1:15 et 1:35.