Toutes les compagnies reliant Lahore (LHE) à Doha (DOH).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:
Lun,Mer-Ven 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 777 (777) 4:05 Effective 2026-01-19 through 2026-01-26
Codeshare flight, operated by Qatar Airways.(QR 621)
Mar,Sam,Dim 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Airbus A350 (350) 4:05 Effective 2026-01-20 through 2026-01-25
Codeshare flight, operated by Qatar Airways.(QR 621)
Mar,Dim 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 777 (777) 4:05 Effective 2026-01-27 through 2026-02-03
Codeshare flight, operated by Qatar Airways.(QR 621)
Lun,Mer-Ven 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Airbus A350 (350) 4:05 Effective 2026-01-28 through 2026-02-02
Codeshare flight, operated by Qatar Airways.(QR 621)
Jeu,Sam 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 787-9 (789) 4:05 Effective 2026-01-31 through 2026-02-05
Codeshare flight, operated by Qatar Airways.(QR 621)
Lun-Mer,Ven,Dim 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 777 (777) 4:05 Effective 2026-02-04 through 2026-02-10
Codeshare flight, operated by Qatar Airways.(QR 621)
Mer,Sam 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Airbus A350 (350) 4:05 Effective 2026-02-07 through 2026-02-14
Codeshare flight, operated by Qatar Airways.(QR 621)
Lun-Ven,Dim 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 777 (777) 4:05 Effective 2026-02-12 through 2026-02-19
Codeshare flight, operated by Qatar Airways.(QR 621)
Mer,Ven,Sam 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Airbus A350 (350) 4:05 Effective 2026-02-20 through 2026-02-27
Codeshare flight, operated by Qatar Airways.(QR 621)
Lun,Mar,Jeu,Dim 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 777 (777) 4:05 Effective 2026-02-22 through 2026-03-01
Codeshare flight, operated by Qatar Airways.(QR 621)
Lun,Sam 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 787-9 (789) 4:05 Effective 2026-02-28 through 2026-03-02
Codeshare flight, operated by Qatar Airways.(QR 621)
Lun-Ven,Dim 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 777 (777) 4:05 Effective 2026-03-03 through 2026-03-13
Codeshare flight, operated by Qatar Airways.(QR 621)
Sam 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Airbus A350 (350) 4:05 Operates only on 2026-03-07
Codeshare flight, operated by Qatar Airways.(QR 621)
Tous les jours 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 777 (777) 4:05 Effective 2026-03-14 through 2026-03-20
Codeshare flight, operated by Qatar Airways.(QR 621)
Mer-Sam 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Airbus A350 (350) 4:05 Effective 2026-03-21 through 2026-03-28
Codeshare flight, operated by Qatar Airways.(QR 621)
Lun,Mar,Dim 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 777 (777) 4:05 Effective 2026-03-22 through 2026-03-29
Codeshare flight, operated by Qatar Airways.(QR 621)
Tous les jours 02:55 Lahore (LHE) M 05:00 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 787-9 (789) 4:05 Effective from 2026-10-26
Codeshare flight, operated by Qatar Airways.(QR 621)
Lun,Mer,Dim 03:10 Lahore (LHE) M 05:05 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 777 (777) 3:55 Effective 2026-03-30 through 2026-04-05
Codeshare flight, operated by Qatar Airways.(QR 621)
Lun,Mar,Jeu-Sam 03:10 Lahore (LHE) M 05:05 Doha (DOH)
Oman Air WY 6108 Non-stop Airbus A350 (350) 3:55 Effective 2026-03-31 through 2026-04-07
Codeshare flight, operated by Qatar Airways.(QR 621)
Mer,Jeu 03:10 Lahore (LHE) M 05:05 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 777 (777) 3:55 Effective 2026-04-08 through 2026-04-09
Codeshare flight, operated by Qatar Airways.(QR 621)
Ven-Dim 03:10 Lahore (LHE) M 05:05 Doha (DOH)
Oman Air WY 6108 Non-stop Airbus A350 (350) 3:55 Effective 2026-04-10 through 2026-04-12
Codeshare flight, operated by Qatar Airways.(QR 621)
Mer,Sam,Dim 03:10 Lahore (LHE) M 04:40 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 777 (777) 3:30 Effective 2026-06-14 through 2026-09-05
Codeshare flight, operated by Qatar Airways.(QR 621)
Lun,Mar,Jeu,Ven 03:10 Lahore (LHE) M 04:40 Doha (DOH)
Oman Air WY 6108 Non-stop Airbus A350 (350) 3:30 Effective 2026-06-15 through 2026-09-04
Codeshare flight, operated by Qatar Airways.(QR 621)
Mar,Jeu,Ven,Dim 03:10 Lahore (LHE) M 04:40 Doha (DOH)
Oman Air WY 6108 Non-stop Airbus A350 (350) 3:30 Effective 2026-09-06 through 2026-09-11
Codeshare flight, operated by Qatar Airways.(QR 621)
Lun,Mer,Sam,Dim 03:10 Lahore (LHE) M 04:40 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 777 (777) 3:30 Effective 2026-09-07 through 2026-09-20
Codeshare flight, operated by Qatar Airways.(QR 621)
Lun,Mar,Jeu,Ven 03:10 Lahore (LHE) M 04:40 Doha (DOH)
Oman Air WY 6108 Non-stop Airbus A350 (350) 3:30 Effective 2026-09-15 through 2026-09-29
Codeshare flight, operated by Qatar Airways.(QR 621)
Mer,Sam,Dim 03:10 Lahore (LHE) M 04:40 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 777 (777) 3:30 Effective 2026-09-23 through 2026-09-30
Codeshare flight, operated by Qatar Airways.(QR 621)
Lun,Mar,Jeu,Ven 03:10 Lahore (LHE) M 05:05 Doha (DOH)
Oman Air WY 6108 Non-stop Airbus A350 (350) 3:55 Effective 2026-10-01 through 2026-10-16
Codeshare flight, operated by Qatar Airways.(QR 621)
Mer,Sam,Dim 03:10 Lahore (LHE) M 05:05 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 777 (777) 3:55 Effective 2026-10-03 through 2026-10-18
Codeshare flight, operated by Qatar Airways.(QR 621)
Lun,Mer,Sam,Dim 03:10 Lahore (LHE) M 05:05 Doha (DOH)
Oman Air WY 6108 Non-stop Boeing 777 (777) 3:55 Effective 2026-10-19 through 2026-10-25
Codeshare flight, operated by Qatar Airways.(QR 621)
Mar,Jeu,Ven 03:10 Lahore (LHE) M 05:05 Doha (DOH)
Oman Air WY 6108 Non-stop Airbus A350 (350) 3:55 Effective 2026-10-20 through 2026-10-23
Codeshare flight, operated by Qatar Airways.(QR 621)
Lun,Mer-Dim 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Boeing 777 (777) 4:05 Valid until 2026-01-07
Codeshare flight, operated by Qatar Airways.(QR 629)
Mar 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Airbus A330-300 (333) 4:05 Operates only on 2026-01-06
Codeshare flight, operated by Qatar Airways.(QR 629)
Jeu 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Airbus A350 (350) 4:05 Operates only on 2026-01-08
Codeshare flight, operated by Qatar Airways.(QR 629)
Lun-Ven,Dim 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Boeing 777 (777) 4:05 Effective 2026-01-09 through 2026-01-18
Codeshare flight, operated by Qatar Airways.(QR 629)
Sam 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Boeing 787-9 (789) 4:05 Operates only on 2026-01-10
Codeshare flight, operated by Qatar Airways.(QR 629)
Lun,Jeu,Sam 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Airbus A350 (350) 4:05 Effective 2026-01-17 through 2026-01-24
Codeshare flight, operated by Qatar Airways.(QR 629)
Lun-Mer,Ven,Dim 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Boeing 777 (777) 4:05 Effective 2026-01-20 through 2026-01-26
Codeshare flight, operated by Qatar Airways.(QR 629)
Lun,Mar,Ven,Sam 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Airbus A350 (350) 4:05 Effective 2026-01-27 through 2026-02-02
Codeshare flight, operated by Qatar Airways.(QR 629)
Mar-Jeu,Dim 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Boeing 777 (777) 4:05 Effective 2026-01-28 through 2026-02-03
Codeshare flight, operated by Qatar Airways.(QR 629)
Mer 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Boeing 787-9 (789) 4:05 Operates only on 2026-02-04
Codeshare flight, operated by Qatar Airways.(QR 629)
Lun-Sam 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Airbus A350 (350) 4:05 Effective 2026-02-05 through 2026-02-11
Codeshare flight, operated by Qatar Airways.(QR 629)
Jeu-Dim 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Boeing 777 (777) 4:05 Effective 2026-02-08 through 2026-02-14
Codeshare flight, operated by Qatar Airways.(QR 629)
Lun,Mar,Dim 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Airbus A350 (350) 4:05 Effective 2026-02-15 through 2026-02-17
Codeshare flight, operated by Qatar Airways.(QR 629)
Mar-Dim 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Boeing 777 (777) 4:05 Effective 2026-02-18 through 2026-02-25
Codeshare flight, operated by Qatar Airways.(QR 629)
Lun,Ven,Dim 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Airbus A350 (350) 4:05 Effective 2026-02-23 through 2026-03-06
Codeshare flight, operated by Qatar Airways.(QR 629)
Jeu,Sam 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Boeing 787-8 (788) 4:05 Effective 2026-02-26 through 2026-02-28
Codeshare flight, operated by Qatar Airways.(QR 629)
Lun-Jeu,Sam,Dim 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Boeing 777 (777) 4:05 Effective 2026-03-03 through 2026-03-12
Codeshare flight, operated by Qatar Airways.(QR 629)
Lun-Ven,Dim 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Boeing 777 (777) 4:05 Effective 2026-03-13 through 2026-03-22
Codeshare flight, operated by Qatar Airways.(QR 629)
Sam 08:50 Lahore (LHE) M 10:55 Doha (DOH)
Oman Air WY 6112 Non-stop Airbus A350 (350) 4:05 Operates only on 2026-03-14
Codeshare flight, operated by Qatar Airways.(QR 629)
prev   1 2 3 ... 5 6 7 8 9 10 11 ... 16 17 18   next


Toutes les compagnies reliant Lahore (LHE) à Doha (DOH).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:

02:55

05:00
Effective 2026-01-19 through 2026-01-26
Lun
Mar
-
Mer
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Boeing 777 (777)

Vols directs en partage de code:

02:55

05:00
Effective 2026-01-20 through 2026-01-25
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Airbus A350 (350)

Vols directs en partage de code:

02:55

05:00
Effective 2026-01-27 through 2026-02-03
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Boeing 777 (777)

Vols directs en partage de code:

02:55

05:00
Effective 2026-01-28 through 2026-02-02
Lun
Mar
-
Mer
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Airbus A350 (350)

Vols directs en partage de code:

02:55

05:00
Effective 2026-01-31 through 2026-02-05
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Boeing 787-9 (789)

Vols directs en partage de code:

02:55

05:00
Effective 2026-02-04 through 2026-02-10
Lun
Mar
Mer
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Boeing 777 (777)

Vols directs en partage de code:

02:55

05:00
Effective 2026-02-07 through 2026-02-14
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Airbus A350 (350)

Vols directs en partage de code:

02:55

05:00
Effective 2026-02-12 through 2026-02-19
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Boeing 777 (777)

Vols directs en partage de code:

02:55

05:00
Effective 2026-02-20 through 2026-02-27
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Airbus A350 (350)

Vols directs en partage de code:

02:55

05:00
Effective 2026-02-22 through 2026-03-01
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Boeing 777 (777)

Vols directs en partage de code:

02:55

05:00
Effective 2026-02-28 through 2026-03-02
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Boeing 787-9 (789)

Vols directs en partage de code:

02:55

05:00
Effective 2026-03-03 through 2026-03-13
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Boeing 777 (777)

Vols directs en partage de code:

02:55

05:00
Operates only on 2026-03-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Airbus A350 (350)

Vols directs en partage de code:

02:55

05:00
Effective 2026-03-14 through 2026-03-20
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Boeing 777 (777)

Vols directs en partage de code:

02:55

05:00
Effective 2026-03-21 through 2026-03-28
Lun
-
Mar
-
Mer
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Airbus A350 (350)

Vols directs en partage de code:

02:55

05:00
Effective 2026-03-22 through 2026-03-29
Lun
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Boeing 777 (777)

Vols directs en partage de code:

02:55

05:00
Effective from 2026-10-26
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 4:05, non-stop
Boeing 787-9 (789)

Vols directs en partage de code:

03:10

05:05
Effective 2026-03-30 through 2026-04-05
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 3:55, non-stop
Boeing 777 (777)

Vols directs en partage de code:

03:10

05:05
Effective 2026-03-31 through 2026-04-07
Lun
Mar
Mer
-
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 3:55, non-stop
Airbus A350 (350)

Vols directs en partage de code:

03:10

05:05
Effective 2026-04-08 through 2026-04-09
Lun
-
Mar
-
Mer
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 3:55, non-stop
Boeing 777 (777)

Vols directs en partage de code:

03:10

05:05
Effective 2026-04-10 through 2026-04-12
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 3:55, non-stop
Airbus A350 (350)

Vols directs en partage de code:

03:10

04:40
Effective 2026-06-14 through 2026-09-05
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 3:30, non-stop
Boeing 777 (777)

Vols directs en partage de code:

03:10

04:40
Effective 2026-06-15 through 2026-09-04
Lun
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 3:30, non-stop
Airbus A350 (350)

Vols directs en partage de code:

03:10

04:40
Effective 2026-09-06 through 2026-09-11
Lun
-
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 3:30, non-stop
Airbus A350 (350)

Vols directs en partage de code:

03:10

04:40
Effective 2026-09-07 through 2026-09-20
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 3:30, non-stop
Boeing 777 (777)

Vols directs en partage de code:

03:10

04:40
Effective 2026-09-15 through 2026-09-29
Lun
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 3:30, non-stop
Airbus A350 (350)

Vols directs en partage de code:

03:10

04:40
Effective 2026-09-23 through 2026-09-30
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 3:30, non-stop
Boeing 777 (777)

Vols directs en partage de code:

03:10

05:05
Effective 2026-10-01 through 2026-10-16
Lun
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 3:55, non-stop
Airbus A350 (350)

Vols directs en partage de code:

03:10

05:05
Effective 2026-10-03 through 2026-10-18
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 3:55, non-stop
Boeing 777 (777)

Vols directs en partage de code:

03:10

05:05
Effective 2026-10-19 through 2026-10-25
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 3:55, non-stop
Boeing 777 (777)

Vols directs en partage de code:

03:10

05:05
Effective 2026-10-20 through 2026-10-23
Lun
-
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 621)
Duration: 3:55, non-stop
Airbus A350 (350)

Vols directs en partage de code:

08:50

10:55
Valid until 2026-01-07
Lun
Mar
-
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Boeing 777 (777)

Vols directs en partage de code:

08:50

10:55
Operates only on 2026-01-06
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Airbus A330-300 (333)

Vols directs en partage de code:

08:50

10:55
Operates only on 2026-01-08
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Airbus A350 (350)

Vols directs en partage de code:

08:50

10:55
Effective 2026-01-09 through 2026-01-18
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Boeing 777 (777)

Vols directs en partage de code:

08:50

10:55
Operates only on 2026-01-10
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Boeing 787-9 (789)

Vols directs en partage de code:

08:50

10:55
Effective 2026-01-17 through 2026-01-24
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Airbus A350 (350)

Vols directs en partage de code:

08:50

10:55
Effective 2026-01-20 through 2026-01-26
Lun
Mar
Mer
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Boeing 777 (777)

Vols directs en partage de code:

08:50

10:55
Effective 2026-01-27 through 2026-02-02
Lun
Mar
Mer
-
Jeu
-
Ven
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Airbus A350 (350)

Vols directs en partage de code:

08:50

10:55
Effective 2026-01-28 through 2026-02-03
Lun
-
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Boeing 777 (777)

Vols directs en partage de code:

08:50

10:55
Operates only on 2026-02-04
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Boeing 787-9 (789)

Vols directs en partage de code:

08:50

10:55
Effective 2026-02-05 through 2026-02-11
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Airbus A350 (350)

Vols directs en partage de code:

08:50

10:55
Effective 2026-02-08 through 2026-02-14
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Boeing 777 (777)

Vols directs en partage de code:

08:50

10:55
Effective 2026-02-15 through 2026-02-17
Lun
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Airbus A350 (350)

Vols directs en partage de code:

08:50

10:55
Effective 2026-02-18 through 2026-02-25
Lun
-
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Boeing 777 (777)

Vols directs en partage de code:

08:50

10:55
Effective 2026-02-23 through 2026-03-06
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Airbus A350 (350)

Vols directs en partage de code:

08:50

10:55
Effective 2026-02-26 through 2026-02-28
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Boeing 787-8 (788)

Vols directs en partage de code:

08:50

10:55
Effective 2026-03-03 through 2026-03-12
Lun
Mar
Mer
Jeu
Ven
-
Sam
Dim
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Boeing 777 (777)

Vols directs en partage de code:

08:50

10:55
Effective 2026-03-13 through 2026-03-22
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Boeing 777 (777)

Vols directs en partage de code:

08:50

10:55
Operates only on 2026-03-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Qatar Airways. (QR 629)
Duration: 4:05, non-stop
Airbus A350 (350)
prev        Page 8 / 18        next
  • Il s'agit d'une ligne internationale au départ de l'aéroport de Lahore, Pakistan (LHE) et à destination de l'aéroport de Doha, Qatar (DOH).
  • La distance est de 2329 km.
  • Le fuseau horaire de l'aéroport de départ est UTC+5 , et le fuseau horaire de l'aéroport d'arrivée est UTC+3 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.
  • Pour les vols directs, le temps de vol varie entre 3:30 et 4:35.