Toutes les compagnies reliant Los Angeles (LAX) à Minneapolis/Saint Paul (MSP).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Jeu 18:22 Los Angeles (LAX) 1 23:52 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 426 Non-stop Boeing 737-800 (738) 3:30 Operates only on 2026-02-19
Sam 18:22 Los Angeles (LAX) 1 23:52 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 426 Non-stop Boeing 737-800 (738) 3:30 Operates only on 2026-03-14
Lun 18:23 Los Angeles (LAX) 1 23:53 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 426 Non-stop Boeing 737-800 (738) 3:30 Effective 2026-03-02 through 2026-03-09
Ven 18:23 Los Angeles (LAX) 1 23:54 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 426 Non-stop Boeing 737-800 (738) 3:31 Operates only on 2026-07-17
Jeu 18:24 Los Angeles (LAX) 1 23:58 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 426 Non-stop Boeing 737-800 (738) 3:34 Operates only on 2026-01-29
Ven 18:24 Los Angeles (LAX) 1 23:58 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 426 Non-stop Boeing 737-800 (738) 3:34 Operates only on 2026-02-06
Mer 18:24 Los Angeles (LAX) 1 23:54 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 426 Non-stop Boeing 737-800 (738) 3:30 Operates only on 2026-03-18
Mer 18:28 Los Angeles (LAX) 1 23:58 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 426 Non-stop Boeing 737-800 (738) 3:30 Operates only on 2026-03-04
Lun,Mer 18:28 Los Angeles (LAX) 1 23:58 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 426 Non-stop Boeing 737-800 (738) 3:30 Effective 2026-03-25 through 2026-03-30
Ven 18:28 Los Angeles (LAX) 1 23:58 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 426 Non-stop Boeing 737-800 (738) 3:30 Operates only on 2026-04-03
Mer 18:29 Los Angeles (LAX) 1 23:59 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 426 Non-stop Boeing 737-800 (738) 3:30 Operates only on 2026-04-01
Ven 18:31 Los Angeles (LAX) 1 00:09 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 426 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2026-01-02
The flight arrives 1 day after departure.
Jeu 18:31 Los Angeles (LAX) 1 00:01 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 426 Non-stop Boeing 737-800 (738) 3:30 Operates only on 2026-03-05
The flight arrives 1 day after departure.
Lun 18:31 Los Angeles (LAX) 1 00:01 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 426 Non-stop Boeing 737-800 (738) 3:30 Operates only on 2026-03-16
The flight arrives 1 day after departure.
Dim 12:51 Los Angeles (LAX) 1 18:23 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:32 Operates only on 2026-05-24
Mar 12:55 Los Angeles (LAX) 1 18:27 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:32 Operates only on 2026-05-26
Mer 13:21 Los Angeles (LAX) 1 18:58 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:37 Operates only on 2026-09-02
Sam 13:27 Los Angeles (LAX) 1 18:58 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:31 Operates only on 2026-07-25
Mar 13:50 Los Angeles (LAX) 1 19:22 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:32 Effective 2026-05-05 through 2026-05-19
Lun 13:50 Los Angeles (LAX) 1 19:27 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:37 Operates only on 2026-08-24
Sam 13:59 Los Angeles (LAX) 1 19:30 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:31 Operates only on 2026-07-04
Mar 14:25 Los Angeles (LAX) 1 20:02 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:37 Operates only on 2026-09-01
Jeu 14:50 Los Angeles (LAX) 1 20:27 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:37 Operates only on 2026-08-20
Mer 14:53 Los Angeles (LAX) 1 20:24 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:31 Operates only on 2026-07-01
Dim 15:05 Los Angeles (LAX) 1 20:39 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:34 Operates only on 2026-05-31
Dim 15:08 Los Angeles (LAX) 1 20:45 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:37 Operates only on 2026-08-30
Mar 15:20 Los Angeles (LAX) 1 20:54 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:34 Operates only on 2026-06-02
Dim 16:23 Los Angeles (LAX) 1 21:54 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:31 Operates only on 2026-06-14
Dim 16:38 Los Angeles (LAX) 1 22:09 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:31 Operates only on 2026-07-26
Sam 18:24 Los Angeles (LAX) 1 23:58 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:34 Operates only on 2026-02-14
Jeu 18:28 Los Angeles (LAX) 1 23:58 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:30 Operates only on 2026-04-02
Sam 18:31 Los Angeles (LAX) 1 00:09 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 428 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2026-01-03
The flight arrives 1 day after departure.
Tous les jours 23:45 Los Angeles (LAX) 3 05:27 Minneapolis/Saint Paul (MSP) 1
Delta Air Lines DL 430 Non-stop Airbus A321neo (32Q) 3:42 Effective 2026-04-13 through 2026-06-06
The flight arrives 1 day after departure.
Tous les jours 23:45 Los Angeles (LAX) 3 05:27 Minneapolis/Saint Paul (MSP) 1
Delta Air Lines DL 430 Non-stop Airbus A321neo (32Q) 3:42 Effective 2026-08-10 through 2026-10-05
The flight arrives 1 day after departure.
Tous les jours 23:45 Los Angeles (LAX) 3 05:31 Minneapolis/Saint Paul (MSP) 1
Delta Air Lines DL 430 Non-stop Airbus A321neo (32Q) 3:46 Effective from 2026-10-06
The flight arrives 1 day after departure.
Dim 23:46 Los Angeles (LAX) 1 05:25 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 430 Non-stop Boeing 737-800 (738) 3:39 Operates only on 2026-07-26
The flight arrives 1 day after departure.
Tous les jours 23:55 Los Angeles (LAX) 3 05:36 Minneapolis/Saint Paul (MSP) 1
Delta Air Lines DL 430 Non-stop Airbus A321 (321) 3:41 Valid until 2026-01-04
The flight arrives 1 day after departure.
Tous les jours 23:55 Los Angeles (LAX) 3 05:35 Minneapolis/Saint Paul (MSP) 1
Delta Air Lines DL 430 Non-stop Boeing 737-900 (739) 3:40 Effective 2026-01-19 through 2026-02-11
The flight arrives 1 day after departure.
Jeu,Ven,Dim 23:55 Los Angeles (LAX) 1 05:36 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 430 Non-stop Boeing 737-800 (738) 3:41 Effective 2026-08-21 through 2026-08-27
The flight arrives 1 day after departure.
Lun,Sam,Dim 23:55 Los Angeles (LAX) 1 05:36 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 430 Non-stop Boeing 737-800 (738) 3:41 Effective 2026-08-29 through 2026-08-31
The flight arrives 1 day after departure.
Lun,Mar,Jeu,Ven,Dim 23:59 Los Angeles (LAX) 1 05:47 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 430 Non-stop Boeing 737-800 (738) 3:48 Valid until 2026-01-01
The flight arrives 1 day after departure.
Dim 23:59 Los Angeles (LAX) 1 05:33 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 430 Non-stop Boeing 737-800 (738) 3:34 Effective 2026-01-18 through 2026-02-08
The flight arrives 1 day after departure.
Ven,Dim 23:59 Los Angeles (LAX) 1 05:33 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 430 Non-stop Boeing 737-800 (738) 3:34 Effective 2026-02-13 through 2026-02-15
The flight arrives 1 day after departure.
Jeu-Dim 23:59 Los Angeles (LAX) 1 05:37 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 430 Non-stop Boeing 737-800 (738) 3:38 Effective 2026-02-22 through 2026-03-01
The flight arrives 1 day after departure.
Ven 23:59 Los Angeles (LAX) 1 05:37 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 430 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2026-03-06
The flight arrives 1 day after departure.
Sam 23:59 Los Angeles (LAX) 1 06:37 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 430 Non-stop Boeing 737-800 (738) 3:38 Operates only on 2026-03-07
The flight arrives 1 day after departure.
Jeu-Dim 23:59 Los Angeles (LAX) 1 05:37 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 430 Non-stop Boeing 737-800 (738) 3:38 Effective 2026-03-08 through 2026-03-20
The flight arrives 1 day after departure.
Tous les jours 23:59 Los Angeles (LAX) 3 05:37 Minneapolis/Saint Paul (MSP) 1
Delta Air Lines DL 430 Non-stop Airbus A321neo (32Q) 3:38 Effective 2026-03-08 through 2026-04-12
The flight arrives 1 day after departure.
Jeu,Ven,Dim 23:59 Los Angeles (LAX) 1 05:37 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 430 Non-stop Boeing 737-800 (738) 3:38 Effective 2026-03-22 through 2026-03-29
The flight arrives 1 day after departure.
Lun,Jeu,Ven,Dim 23:59 Los Angeles (LAX) 1 05:37 Minneapolis/Saint Paul (MSP) 2
Sun Country Airlines SY 430 Non-stop Boeing 737-800 (738) 3:38 Effective 2026-03-30 through 2026-04-05
The flight arrives 1 day after departure.
prev   1 2 3 4 5 6 7 8 9 10   next


Toutes les compagnies reliant Los Angeles (LAX) à Minneapolis/Saint Paul (MSP).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Operates only on 2026-02-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:30, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-03-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:30, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-03-02 through 2026-03-09
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:30, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-07-17
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:31, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-01-29
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:34, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-02-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:34, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-03-18
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:30, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-03-04
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:30, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-03-25 through 2026-03-30
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:30, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-04-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:30, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-04-01
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:30, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-01-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:38, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vols directs:

Operates only on 2026-03-05
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:30, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vols directs:

Operates only on 2026-03-16
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:30, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vols directs:

Operates only on 2026-05-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:32, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-05-26
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:32, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-09-02
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:37, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-07-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:31, non-stop
Boeing 737-800 (738)

Vols directs:

Effective 2026-05-05 through 2026-05-19
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:32, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-08-24
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:37, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-07-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:31, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-09-01
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:37, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-08-20
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:37, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-07-01
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:31, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-05-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:34, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-08-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:37, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-06-02
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:34, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-06-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:31, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-07-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:31, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-02-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:34, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-04-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:30, non-stop
Boeing 737-800 (738)

Vols directs:

Operates only on 2026-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:38, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-04-13 through 2026-06-06
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:42, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-08-10 through 2026-10-05
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:42, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

Vols directs:

Effective from 2026-10-06
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:46, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

Vols directs:

Operates only on 2026-07-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:39, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vols directs:

Valid until 2026-01-04
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:41, non-stop
Airbus A321 (321)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-01-19 through 2026-02-11
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:40, non-stop
Boeing 737-900 (739)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-08-21 through 2026-08-27
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 3:41, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-08-29 through 2026-08-31
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
Duration: 3:41, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vols directs:

Valid until 2026-01-01
Lun
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 3:48, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-01-18 through 2026-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:34, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-02-13 through 2026-02-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 3:34, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-02-22 through 2026-03-01
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
Dim
Duration: 3:38, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vols directs:

Operates only on 2026-03-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:38, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vols directs:

Operates only on 2026-03-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:38, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-03-08 through 2026-03-20
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
Dim
Duration: 3:38, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-03-08 through 2026-04-12
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:38, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-03-22 through 2026-03-29
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 3:38, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.

Vols directs:

Effective 2026-03-30 through 2026-04-05
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 3:38, non-stop
Boeing 737-800 (738)
The flight arrives 1 day after departure.
prev        Page 4 / 10        next
  • Il s'agit d'une ligne intérieure au départ de l'aéroport de Los Angeles (LAX) et à destination de l'aéroport de Minneapolis/Saint Paul (MSP).
  • La distance est de 2466 km.
  • Le fuseau horaire de l'aéroport de départ est UTC-8 , et le fuseau horaire de l'aéroport d'arrivée est UTC-6 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.
  • Pour les vols directs, le temps de vol varie entre 3:27 et 3:48.